Finance Committee - Agenda - 7/6/2022 - P21
6.2 Verify using the river hydraulic model that there continues to be “0.00 ft rise” with
the redesigned elevated walkway piles.
6.3 Develop structural details for the boardwalk/pile and associated connections.
6.4 Evaluate the proposed riverbank protection under the boardwalk and around the
piles by VHB or others for the potential of erosion and scour using the river
hydraulic model to determine bank velocities and soil shear.
6.5 Prepare final engineering drawings and specifications for City review and approval.