Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee

Finance Committee

Finance Committee - Agenda - 11/15/2017 - P394

By dnadmin on Mon, 11/07/2022 - 10:19
  • Read more about Finance Committee - Agenda - 11/15/2017 - P394

} THE CITY OF NASHUA “The Cate City"

Financial Services

Purchasing Department

November 9, 2017
Memo #18-058

TO: MAYOR DONCHESS
FINANCE COMMITTEE

SUBJECT: DIGESTER CLEANING PROJECT — CO-1 (VALUE: $48,400)
DEPARTMENT: 169 WASTEWATER; FUND: WASTEWATER

Please see the attached communication from Noelle Osborne, Plant Operations Supervisor Wastewater
Department dated October 26, 2017 for the information related to this purchase.

Finance Committee - Agenda - 11/15/2017 - P393

By dnadmin on Mon, 11/07/2022 - 10:19
  • Read more about Finance Committee - Agenda - 11/15/2017 - P393

>
a> «x,
WOODARD
CURRAN

woodardcurran.com

COMMITMENT & INTEGRITY DRIVE RESULTS

Finance Committee - Agenda - 11/15/2017 - P392

By dnadmin on Mon, 11/07/2022 - 10:19
  • Read more about Finance Committee - Agenda - 11/15/2017 - P392

Finance Committee - Agenda - 11/15/2017 - P391

By dnadmin on Mon, 11/07/2022 - 10:19
  • Read more about Finance Committee - Agenda - 11/15/2017 - P391

Project Number: 228730 WWTE SCADA Upgrades
Issue Date: August 2017 Nashua, NH

3.04 FIELD QUALITY CONTROL
A. Provide in accordance with Division 01 General Requirements.

3.05 STARTUP & COMMISSIONING

A. Provide all labor, tools, materials, personnel, and equipment necessary to assist in
the startup and testing of the SCADA system with the Integrator after installation
of control panels and instruments, and termination of field wiring to panels is
complete. Start up and testing shall be witnessed by the Owner and/or Engineer.

Finance Committee - Agenda - 11/15/2017 - P390

By dnadmin on Mon, 11/07/2022 - 10:19
  • Read more about Finance Committee - Agenda - 11/15/2017 - P390

Project Number: 228730 WWTE SCADA Upgrades

Issue Date: August 2017 Nashua, NH
L. Nameplates
1. All panels and panel devices shall be supplied with suitable nameplates

that identify the panel and individual devices as required. Each device
nameplate shall include up to 3 lines, with the first line containing the
device tag number as shown on the Drawings, the second line containing a
functional description, and the third line containing a functional control
description.

Finance Committee - Agenda - 11/15/2017 - P389

By dnadmin on Mon, 11/07/2022 - 10:19
  • Read more about Finance Committee - Agenda - 11/15/2017 - P389

Project Number: 228730 WWTE SCADA Upgrades

Issue Date: August 2017 Nashua, NH
I. Seal Fail and Motor Temperature Relays
1. Pumps, or mixers, equipped with proprietary seal fail and motor

temperature relays, shall require these relays to be mounted in the SCADA
control panel unless otherwise noted in the Drawings. The seal fail and
motor over temperature alarm contacts shall be connected to the PLC as
discrete inputs.

J. Intrinsic Safety Barrier Panels

Finance Committee - Agenda - 11/15/2017 - P388

By dnadmin on Mon, 11/07/2022 - 10:19
  • Read more about Finance Committee - Agenda - 11/15/2017 - P388

Project Number: 228730
Issue Date: August 2017

WWTE SCADA Upgrades
Nashua, NH

suppression in strict accordance with manufacturer’s
recommendations.

3. Analog signal surge suppression

a.

Finance Committee - Agenda - 11/15/2017 - P387

By dnadmin on Mon, 11/07/2022 - 10:19
  • Read more about Finance Committee - Agenda - 11/15/2017 - P387

Project Number: 228730 WWTE SCADA Upgrades
Issue Date: August 2017 Nashua, NH

e. DC Wiring — Blue
f. Intrinsically Safe Wiring - Light Blue
g. Foreign Voltage — Yellow
C. Control Panel Loss of Power
1. Each control panel containing a PLC shall have an input configured to
alarm the operators upon loss of main control panel power. This alarm

shall be displayed on the SCADA nodes to alert the operators that
attention is required.

Finance Committee - Agenda - 11/15/2017 - P386

By dnadmin on Mon, 11/07/2022 - 10:19
  • Read more about Finance Committee - Agenda - 11/15/2017 - P386

Project Number: 228730 WWTE SCADA Upgrades
Issue Date: August 2017 Nashua, NH

AC control, DC signal. Terminal blocks shall be the compression screw
type. Spring-clamp style terminals will not be accepted.

a. Discrete inputs and outputs (DI and DO) shall have 2 terminals per
point with adjacent terminal assignments. All active and spare
points shall be wired to terminal blocks.

Finance Committee - Agenda - 11/15/2017 - P385

By dnadmin on Mon, 11/07/2022 - 10:19
  • Read more about Finance Committee - Agenda - 11/15/2017 - P385

Project Number: 228730 WWTE SCADA Upgrades
Issue Date: August 2017 Nashua, NH

condensing. The field mounted equipment and system components shall
be designed for installation in dusty, humid, and slightly corrosive service
conditions.

3. Equipment installed in a hazardous area shall meet Class, Group, and
Division to comply with the NFPA 70 and CCR, Title 8, Electrical and
General Safety Orders.

Pagination

  • Previous page ‹‹
  • Page 1535
  • Next page ››
Subscribe to Finance Committee

Footer menu

  • Contact