391
Project Number: 228730 WWTE SCADA Upgrades
Issue Date: August 2017 Nashua, NH
3.04 FIELD QUALITY CONTROL
A. Provide in accordance with Division 01 General Requirements.
3.05 STARTUP & COMMISSIONING
A. Provide all labor, tools, materials, personnel, and equipment necessary to assist in
the startup and testing of the SCADA system with the Integrator after installation
of control panels and instruments, and termination of field wiring to panels is
complete. Start up and testing shall be witnessed by the Owner and/or Engineer.
3.06 CLOSEOUT ACTIVITIES
A. Provide in accordance with Division 01 General Requirements.
END OF SECTION