Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee

Finance Committee

Finance Committee - Agenda - 2/17/2021 - P217

By dnadmin on Mon, 11/07/2022 - 13:48
  • Read more about Finance Committee - Agenda - 2/17/2021 - P217

Work for which Certificates for Payment have been previously issued and payments
received from the OWNER shall, to the best of the CONTRACTOR’s knowledge,
information and belief, be free and clear of liens, claims, security interests or other
encumbrances adverse to the OWNER’s interests.

5. OWNER shall make payments, for work satisfactorily completed and accurately invoiced,
on the basis of CONTRACTORSs Application for Payment, within 30 days of approval by
the OWNER.

Finance Committee - Agenda - 2/17/2021 - P216

By dnadmin on Mon, 11/07/2022 - 13:48
  • Read more about Finance Committee - Agenda - 2/17/2021 - P216

3.

Change Order requests must include material and equipment cost plus labor with a profit
margin of no more than 10%. Change Orders may require approval by the Board of
Public Works and the OWNER’s Finance Committee vote prior to proceeding.

Finance Committee - Agenda - 2/17/2021 - P215

By dnadmin on Mon, 11/07/2022 - 13:48
  • Read more about Finance Committee - Agenda - 2/17/2021 - P215

10.

11.

12.

13.

14.

15.

16.

The CONTRACTOR shall deliver, handle, store and install materials in accordance with
manufacturers’ instructions.

The CONTRACTOR warrants to the OWNER that (1) materials and equipment furnished
under the contract will be new and of good quality unless otherwise required or permitted
by the Contract Documents; (2) the Work will be free from defects not inherent in the
quality required or permitted; and (3) the Work will conform to the requirements of the
Contract Documents.

Finance Committee - Agenda - 2/17/2021 - P214

By dnadmin on Mon, 11/07/2022 - 13:48
  • Read more about Finance Committee - Agenda - 2/17/2021 - P214

ARTICLE 7 —- OWNER

1.

Prior to the start of Construction, the CONTRACTOR shall obtain an Electrical Permit
from the City of Nashua’s Department of Building Safety, prior to performance of services
under this contract: There will be no cost for the Electrical Permit.

Documents, the OWNER may direct the CONTRACTOR in writing to stop the Work
until the correction is made.

Finance Committee - Agenda - 2/17/2021 - P213

By dnadmin on Mon, 11/07/2022 - 13:48
  • Read more about Finance Committee - Agenda - 2/17/2021 - P213

>» The insurance provided herein is primary, and no insurance held or owned by the OWNER
shall be called upon to contribute to a loss.

> CONTRACTOR is responsible for and required to remedy all damage or loss to any
property, including property of the OWNER, caused in whole or part by CONTRACTOR
or anyone employed, directed, or supervised by CONTRACTOR.

>» The insurance provided herein is primary, and no insurance held or owned by the
OWNER, shall be called upon to contribute to a loss.

Finance Committee - Agenda - 2/17/2021 - P212

By dnadmin on Mon, 11/07/2022 - 13:48
  • Read more about Finance Committee - Agenda - 2/17/2021 - P212

ARTICLE 5 — INSURANCE AND INDEMNIFICATION

CONTRACTOR shall carry and maintain in effect during the performance of services under this
contract:

> General liability insurance in the amount of $1,000,000 per occurrence; $2,000,000
aggregate;

>» Motor Vehicle Liability: $1,000,000 Combined Single Limit;*Coverage must include all
owned, non-owned and hired vehicles; and

>» Workers’ Compensation Coverage in compliance with the State of NH Statutes,
$100,000/$500,000/$100,000.

Finance Committee - Agenda - 2/17/2021 - P211

By dnadmin on Mon, 11/07/2022 - 13:48
  • Read more about Finance Committee - Agenda - 2/17/2021 - P211

In the event of a conflict between the terms of the Proposal and the terms of this Agreement, a
written change order and/or fully executed City of Nashua Purchase Order, the terms of this
Agreement, the written change order or the fully executed City of Nashua Purchase Order shall
control over the terms of the Proposal.

ARTICLE 2— WORK TO BE PERFORMED

Finance Committee - Agenda - 2/17/2021 - P210

By dnadmin on Mon, 11/07/2022 - 13:48
  • Read more about Finance Committee - Agenda - 2/17/2021 - P210

STANDARD FORM OF AGREEMENT
BETWEEN OWNER AND CONTRACTOR

This agreement is made:

BETWEEN the OWNER: City of Nashua, New Hampshire

229 Main Street
Nashua, NH 03060-2019

And the CONTRACTOR: Mass Crane and Hoist Service

500 Potash Hill Road — Unit 1
Tyngsborough, MA 01879

and its successors, transferees and assignees
(together “CONTRACTOR?” )

For the following Project: | Dry Well Hoist Replacement

IFB1093-122920

ARTICLE 1 —- THE CONTRACT DOCUMENTS

Finance Committee - Agenda - 2/17/2021 - P209

By dnadmin on Mon, 11/07/2022 - 13:48
  • Read more about Finance Committee - Agenda - 2/17/2021 - P209

14320-6
HOIST SYSTEMS

The laser sensors shall be environmentally rated to IP65 for industrial use in
process facilities, along with a +60deg C upper operating temp limit.

The standard system shall be capable of being configured to monitor restricted
zones around process piping and other machinery using a pair of laser distance
sensors monitoring the position of the bridge and trolley throughout the crane
runway and span. The position of the bridge and trolley relative to the fixed
structure is always known.

Finance Committee - Agenda - 2/17/2021 - P208

By dnadmin on Mon, 11/07/2022 - 13:48
  • Read more about Finance Committee - Agenda - 2/17/2021 - P208

14320-5
HOIST SYSTEMS

Cable reel electrification shall be provided using cable sized for the hoist and
designed for use on a cable reel (to prevent twisting under tension). The reel shall
be located to allow smooth operation of the hoist and be supplied with all brackets,
swivels, and connectors to provide complete installation.

Pagination

  • Previous page ‹‹
  • Page 128
  • Next page ››
Subscribe to Finance Committee

Footer menu

  • Contact