In the event of a conflict between the terms of the Proposal and the terms of this Agreement, a
written change order and/or fully executed City of Nashua Purchase Order, the terms of this
Agreement, the written change order or the fully executed City of Nashua Purchase Order shall
control over the terms of the Proposal.
ARTICLE 2— WORK TO BE PERFORMED
Except as otherwise provided in this contract, CONTRACTOR shall furnish all services,
equipment, and materials and shall perform all operations necessary and required to carry out and
perform in accordance with the terms and conditions of the contract the work described.
DESCRIPTION OF WORK:
CONTRACTOR shall furnish and install one 3-ton hoist that can traverse laterally and
longitudinally along the existing rail track in the dry well of the headworks of the main control
building. The existing hoist is a Yale 3-ton model 651CL (serial number AR-203058) with a
Louden motor model 3AL (serial no. L17111TT) for traverse bridging across the dry well. The
existing hoist shall be replaced with the same unit or equal, but with the added capability to
traverse longitudinally. The CONTRACTOR shall determine how to install a track and motor
to provide motorized traverse movement of the hoist. Add Alternate- 1 work (to provide laser
system to stop hoist from reaching electrical panels) to be included in final contract if awarded.
ARTICLE 3 — PERIOD OF PERFORMANCE
Project will begin once a written “Notice to Proceed” is issued.
The CONTRACTOR will have 90 calendar days from the date of issuance of the Notice to
Proceed to reach Substantial Completion of the project, which assumes a 60 calendar day lead
time to order and deliver the hoist and motorized traverse system, and an additional 30 calendar
day to reach Final Completion including final testing and delivery of all product materials and
warranty information.
Liquated damages of TWO HUNDRED AND FIFTY dollars ($250.00) per_calendar day will be
assessed for delays beyond the established dates for substantial completion and final completion.
ARTICLE 4— CONTRACT SUM
Subject to additions and deductions by Change Order, the OWNER shall pay CONTRACTOR,
in accordance with the Contract Documents, the Contract Sum of:
FORTY-SEVEN THOUSAND TWO HUNDRED EIGHTY and 00/100 DOLLARS
($ 47,280.00)
The Contract Sum shall include all items and services necessary for the proper execution and
completion of the Work.