Finance Committee - Agenda - 6/6/2018 - P138
SECTION 401
Amend Table 3 in AASHTO M 323, referenced in AASHTO R 335, to read as follows:
Table 401-1 —Design Control Points*
SECTION 401
Amend Table 3 in AASHTO M 323, referenced in AASHTO R 335, to read as follows:
Table 401-1 —Design Control Points*
SECTION 401
close conformance with the lines, grades, thickness, and typical cross-sections shown on the plans, within the tolerances specified
or established by the Engineer.
EXHIBIT C SECTION 401
SECTION 40] -- PLANT MIX PAVEMENTS — GENERAL
SECTION 403 -- HOT BITUMINOUS PAVEMENT
SECTION 410 -- BITUMINOUS SURFACE TREATMENT
SECTION 421 -- PLANT MIX SURFACE TREATMENT
SECTION 413 -- HGT-POURED CRACK SEALANT
SECTION 417 -- COLD PLANING BITUMINOUS SURFACES
SECTION 401 -- PLANT MIX PAVEMENTS ~— GENERAL
EXHIBIT B
Test results shall be provided to the City within 5 calendar days from asphait pickup.
Results received after 5 calendar days will not be accepted.
Please refer to the attached, “2016 NHDOT Section 400 Pavements” specifications.
Table 1! below lists streets being paved and the number of sample locations per street.
Streets are subject to change and contract will be adjusted accordingly.
23.
24.
25.
26.
list of work not completed. With respect to work listed by the City of Nashua as incomplete,
Independent Contractor shall promptly complete the work and the final acceptance procedure
shall be repeated. The date of final acceptance of a project by the City of Nashua shall be the date
upon which the Board of Public Works or other designated official accepts and approves the
notice of completion.
17.
18.
19.
20.
discrimination based upon physical or mental handicap in all employment practices, including but
not limited to the following: employment, upgrading, demotion, transfer, recruitment,
advertising, layoff, termination, rates of pay, or other forms of compensation and selection for
training, including apprenticeship.
>
>
a
12
13.
14,
15.
16.
Independent Contractor is responsible for and required to remedy all damage or loss to any
property, including property of the City of Nashua, caused in whole or part by Independent
Contractor or anyone employed, directed, or supervised by Independent Contractor
- INDEMNIFICATION Regardless of any coverage provided by any insurance, Independent
10.
11.
as described above within 30 days, the parties may request that the dispute be submitted to the
Board of Public Works for resolution. If the parties are dissatisfied with the decision of the Board
of Public Works, the parties’ reserve the right to pursue any available legal and/or equitable
remedies for any breaches of this contract except as that right may be limited by the terms of this
contract.