SECTION 410

The edges of existing pavements that are to be adjacent to new pavement shall be cleaned to permit the adhesion of bituminous
materials.

3.4 Application of Bituminous Material.

3.4.1 Tack coat. Bituminous material shall be uniformly applied with an approved applicator. When ordered, a pressure
distributor shall be used. The tack coat shall be applied in such a manner as to offer the least inconvenience to traffic and to permit
one-way traffic without pickup or tracking of the bituminous material.

Finance Committee - Agenda - 6/6/2018 - P167

By dnadmin on Mon, 11/07/2022 - 11:37
  • Read more about Finance Committee - Agenda - 6/6/2018 - P167

SECTION 410
SECTION 410 -- BITUMINOUS SURFACE TREATMENT

Description
Materials

Construction Requirements
3.2 Equipment.
3.3 Preparation of Surface to be Treated.
3.4 Application of Bituminous Material.
3.5 Seal Coat.
3.6 Finished Appearance.

Method of Measurement

Basis of Payment
Description

Finance Committee - Agenda - 6/6/2018 - P166

By dnadmin on Mon, 11/07/2022 - 11:37
  • Read more about Finance Committee - Agenda - 6/6/2018 - P166

SECTION 403

Pay items and units:

403.11 Hot Bituminous Pavement, Machine Method Ton
| 403.119 Hot Bituminous Pavement, Machine Method, High Strength Ton |

403.12 Hot Bituminous Pavement, Hand Method Ton
403.351 Hot Bituminous Pavement, Aggregate 35 percent Wear, Ton

Machine Method
403.352 Hot Bituminous Pavement, Aggregate 35 percent Wear, Hand = Ton

Finance Committee - Agenda - 6/6/2018 - P165

By dnadmin on Mon, 11/07/2022 - 11:37
  • Read more about Finance Committee - Agenda - 6/6/2018 - P165

SECTION 403

SECTION 403 -- HOT BITUMINOUS PAVEMENT

Description

1.1. This work shall consist of constructing one or more courses of bituminous pavement on a prepared base as shown on the
plans or as ordered. The methods may be classified as hand or machine.

Finance Committee - Agenda - 6/6/2018 - P164

By dnadmin on Mon, 11/07/2022 - 11:37
  • Read more about Finance Committee - Agenda - 6/6/2018 - P164

SECTION 401
Appendix A

NHDOT Test Procedure B-7

Sampling Bituminous Paving Mixtures For Acceptance Testing

Sample shall be taken behind the paver after placement and before compaction.
Sample location is randomly selected by the Contract Administrator.

When paving over aggregate base course or cold planed surface, use a rectangular metal plate no less than 12” each side.
Center plate on sample location.

After paver passes over plate, measure back to sample location.
Locate the edges of the plate.

Finance Committee - Agenda - 6/6/2018 - P163

By dnadmin on Mon, 11/07/2022 - 11:37
  • Read more about Finance Committee - Agenda - 6/6/2018 - P163

SECTION 401

5.6.3 Pay adjustment, Hot Bituminous Pavement QC/QA Ttems. The pay adjustment for gradation, cross slope,
thickness, asphalt binder content, in place air voids, and ride quality (made up of the sum of all sublots) will be applied to item
1010.3. Pay adjustments may be applied at the end of each month based on all available test results for each lot.

5.7 The accepted quantity of joint adhesive of type specified will be paid for at the Contract unit price per linear foot complete
in place.

Finance Committee - Agenda - 6/6/2018 - P162

By dnadmin on Mon, 11/07/2022 - 11:37
  • Read more about Finance Committee - Agenda - 6/6/2018 - P162

SECTION 401

Table 401-119 - Sieve Size Weight Factors 3/4”

Property Weight Factor “ f”
3/8” 6
#30 4
Gradation (each sieve) #8, and #200sieves gs
Ai other Sieves (each)

Table 401-11b - Sieve Size Weight Factors 1/2” and 3/8”
Property Weight Factor “
fr’
No. 4
_Gradation (each sieve) "#8, and #200 sieves

All other sieves (each) SSS

tool Bin

[A (PR) + (PB )+.-f (PE)
af

Composite Pay Factor (CPF) =

Finance Committee - Agenda - 6/6/2018 - P161

By dnadmin on Mon, 11/07/2022 - 11:37
  • Read more about Finance Committee - Agenda - 6/6/2018 - P161

SECTION 401

Paving operations shall not resume until the Engineer determines that material meeting the Contract requirements can be

produced. Corrective action will be considered acceptable by the Engineer if the pay factor for the failing property increases. If

it is determined that the resumption of production involves a significant change to the production process, the current lot will be

terminated and a new lot will begin.
3.17.3.6.3 Remeasure and Retest. All requests to the Engineer to remeasure and retest a sublot shall be in writing.

Finance Committee - Agenda - 6/6/2018 - P160

By dnadmin on Mon, 11/07/2022 - 11:37
  • Read more about Finance Committee - Agenda - 6/6/2018 - P160

SECTION 401

(a) Where the wearing course must be constructed in short sections (<3 sublots).
(b) Projects shorter than one half mile in length.
{c) Projects with a posted speed of 35 MPH or less.

(d) Projects with many driveways and/or cross roads with constant traffic.
(e) District resurfacing projects.

3. 17.3.5 Cross Slope.

Finance Committee - Agenda - 6/6/2018 - P159

By dnadmin on Mon, 11/07/2022 - 11:37
  • Read more about Finance Committee - Agenda - 6/6/2018 - P159

SECTION 401

Pagination

  • Previous page ‹‹
  • Page 1117
  • Next page ››
Subscribe to Finance Committee

Footer menu

  • Contact