Board Of Aldermen - Minutes - 3/21/2022 - P32
Reflooring & New Walls (3'¢ Floor)
21
Reflooring & New Walls (3'¢ Floor)
21
Key Construction Elements
Summer 2023
¢ Replacement of Asbestos containing flooring and old carpeting.
¢ Replacement of 3" floor Asbestos containing sheetrock walls.
¢ Replacement of roof membrane.
¢ After the roof is replaced, we plan to have solar panels installed on
the roof to offset the cost of electricity.
Miscellaneous Other Work
Main Entrance Rear Entrance Old Water Fountains
Basement Basement Basement Fire Extinguishers io
Site Traffic & Safety Considerations
Winter St (Left, Center), Locust St (Right)
Site Traffic & Safety Considerations
Franklin St (Left) & Charles St (Right)
17
Current Dumpster Location
15