Document Date
Meeting Description
Document Type
Meeting Date
Page Number
31
Key Construction Elements
Summer 2023
¢ Replacement of Asbestos containing flooring and old carpeting.
¢ Replacement of 3" floor Asbestos containing sheetrock walls.
¢ Replacement of roof membrane.
¢ After the roof is replaced, we plan to have solar panels installed on
the roof to offset the cost of electricity.
Page Image
