Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Agenda

Agenda

Finance Committee - Agenda - 11/6/2019 - P122

By dnadmin on Mon, 11/07/2022 - 13:02
  • Read more about Finance Committee - Agenda - 11/6/2019 - P122

GA mindustrial PCO #: 03
. Ref. Document: 181016-PCO# 03
PROJECT NAME: Nashua Primary Tank Upgrades Date: 20-Sep-19

PROJECT NO: 181016
PHASE

COST SUMMARY SHEET

Credit Request for Reducing Plant Water
Pump Panel Feeder (200 Amp to 100 Amp Reduction)

Finance Committee - Agenda - 11/6/2019 - P121

By dnadmin on Mon, 11/07/2022 - 13:02
  • Read more about Finance Committee - Agenda - 11/6/2019 - P121

6/18/2020

Sf18/2020

days

days

days

6/18/2020

Finance Committee - Agenda - 11/6/2019 - P120

By dnadmin on Mon, 11/07/2022 - 13:02
  • Read more about Finance Committee - Agenda - 11/6/2019 - P120

CITY OF NASHUA, NH

PRIMARY TANK UPGRADES

CIIANGE ORDER NO. 3
SUMMARY

ORIGINAL CONTRACT PRICE / DATE OF SUBSTANTIAL COMPLETION

CONTRACT PRICE / TIME PRIOR TO CHANGE ORDER

Licm Xo, = Description of lems
PCO-03 PCO No 3 - Credit Request for Reducing Plant Water Pump Panel Feeder

PCO-04 PCO Nod - MCC 2-Speed Starter

Net Contract Price Increase of thls Change Order (PCO-02):

CONTRACT PRICE / TIME WITH ALL APPROVED CHANGE ORDERS:

$

3,629,340.00

3,654,318,31

Aud / Deduct
(660.33)

444,17

Finance Committee - Agenda - 11/6/2019 - P119

By dnadmin on Mon, 11/07/2022 - 13:02
  • Read more about Finance Committee - Agenda - 11/6/2019 - P119

CHANGE ORDER

No. 3
PROJECT: Primary Tank Upgrade Project DATE OF ISSUANCE: _ 10/18/19
OWNER: City of Nashua, New Hampshire
229 Main Street
(Address) } OWNER’S Purchase Order No.

CONTRACTOR: Methuen Construction OWNER’s Project No. _IFB 0285-112918
CONTRACT FOR: Primary Tank Upgrade Project ENGINEER —_Wright-Pierce
ENGINEER’ s Project No. 13774

You are directed to make the following changes in the Contract Documents.

Description: See attached backup from Methuen Construction for various PCOs

Finance Committee - Agenda - 11/6/2019 - P118

By dnadmin on Mon, 11/07/2022 - 13:02
  • Read more about Finance Committee - Agenda - 11/6/2019 - P118

To:

From:

Re:

B. Motion:

Discussion:

City of Nashua, Public Works Division

Board of Public Works Meeting Date: October 24, 2019

David L. Boucher, Superintendent
Wastewater Department

Primary Tank Upgrade Project — CO3

Finance Committee - Agenda - 11/6/2019 - P117

By dnadmin on Mon, 11/07/2022 - 13:02
  • Read more about Finance Committee - Agenda - 11/6/2019 - P117

, THE CITY OF NASHUA “the Cate City’

Financial Services

Purchasing Department

October 31, 2019
Memo #20-047

TO: MAYOR DONCHESS
FINANCE COMMITTEE

SUBJECT: CONTRACT FOR PRIMARY TANK UPGRADE PROJECT ~ CONSTRUCTION
CHANGE ORDER 3 (VALUE: $3,484)
DEPARTMENT: 168 WASTEWATER; FUND: WERF AND SRF LOAN

Please see the attached communication from David L. Boucher, Superintendent Wastewater Department
dated October 31, 2019 for the information related io this coniract.

Finance Committee - Agenda - 11/6/2019 - P116

By dnadmin on Mon, 11/07/2022 - 13:02
  • Read more about Finance Committee - Agenda - 11/6/2019 - P116

October 15" 2019
City of Nashua, N.H.
Attn: John Stewart
Dear Mr. Stewart,
Tenco Industries is pleased to offer you the following equipment for your consideration;
1. John, the additional cost for the Stainless Steel frame and leg kit for the 925 gallon Anti-
Ice unit is $4,920.00. The updated cost for each truck would be $111,877.00.
All prices and Freight are F.O.B. Barre, VT.
This Quote is valid for 60 days.

Thank you for the opportunity to quote,

Greg Utenay

Finance Committee - Agenda - 11/6/2019 - P115

By dnadmin on Mon, 11/07/2022 - 13:02
  • Read more about Finance Committee - Agenda - 11/6/2019 - P115

8. Warranty

sremceane

A. Front plow and hitch assembly must carry a three (3} year
warranty from manufacturing defects.

- YES

8. Wing plow, hitch and tower must carry a three (3) year
warranty from manufacturing defects.

~ YES

C. Dump body, hydraulic pump and valves must carry a three
{3} year warranty from manufacturing defects.

- YES

#304SS BODY FOR STREET & PARKS DEPARTMENT BID

9. Bid Pricing:

ACKAGE

tem Description

Unit Price

Install Cost Total Price

Finance Committee - Agenda - 11/6/2019 - P114

By dnadmin on Mon, 11/07/2022 - 13:02
  • Read more about Finance Committee - Agenda - 11/6/2019 - P114

HYDRAULICS AND CONTROLS

A. 4 P20 gear type crankshaft mounted front pump witha
Spicer driveline and end yokes shall be standard

1B. A 35 galion hydraulic oil tank with a sight gauge, filter - #304 SS Combination Hydraulic Tank
assembly, shut off valves and alt necessary control valves and Vaive Enclosure. ¥
required for operation as a plow/sander/pre-wet system shall
be included.
C. Spreaders shail be equipped with a Rexroth Basic CS550 - CERTIFIED POWER XDS

ground speed contro} or equivalent.

Finance Committee - Agenda - 11/6/2019 - P113

By dnadmin on Mon, 11/07/2022 - 13:02
  • Read more about Finance Committee - Agenda - 11/6/2019 - P113

"G. The sheaves shall be a6” nominat size with extra deep rope
groove 1-%” axle with a greaseable brass bushing. The sheaves
shall be of a machined steel construction.

H. The wire rope shall be %” diameter x 8 x 25 construction
improved plow steel with double clamps, loop thimbles, and
| anchor shackles at each end.

t. The slide control cylinder shall be a 3” diameter bore x 18”
stroke double acting with 2” diameter nitrided pistan rod.

Pagination

  • Previous page ‹‹
  • Page 824
  • Next page ››
Subscribe to Agenda

Footer menu

  • Contact