Finance Committee - Agenda - 10/2/2019 - P81
Lighting Change
Scope; Remove and replace lighting it Generator room per attached Ell quote.
9-TOTAL (Item 8 + Bond + General Liability)
Lighting Change
Scope; Remove and replace lighting it Generator room per attached Ell quote.
9-TOTAL (Item 8 + Bond + General Liability)
Lighting Change
Scope: Remove and replace lighting in Generator room per attached Ell quote.
Doc #: PCO NO 005
Industral
re ctincirs Ref. Document:
PROJECT NAME: Energy Recovery Upgrade IFBOSO1- Date: 26-Aug-19
090618
PROJECT NO: 181012
PHASE
COST SUMMARY SHEET
Lighting Change
A MC Labor (Recap Sheet): $0.00
B McC Materials, & Equipment (Recap Sheet): $0.00
CG MC Fee (A x 15%} + (B x 10%): $0.00
D Subtotal MC Work (A+B+C): | $ -
E Total Subcontractors (Below): $3,737.50
F Mc Mark-up on Subcontractor Work (5%): | $ 186.38
G Bond (1%) and General Liability (1%): $78.49
WALDRON ENGINEFRIMG & OC
Lee
NS TREUCTION. INC.
To: William Keating, P.E., Project Engineer, Nashua Wastewater Treatment Facility
From: Erich Gustenhoven, P.E., Resident Engineer, Waldron Engineering &
Construction, Inc.
Date: September 17,2019
Re: Change Order Request Review 005&006
NWWTF Energy Recovery Upgrade Project
Attachments: Methuen Construction PCO #005-Lighting
Methuen Construction PCO #006-Painting
Mr. Keating:
Ta:
From:
Re:
C. Motion:
Discussion:
City of Nashua, Public Works Division
Board of Public Works Meeting Date: September 26, 2019
David L. Boucher, Superintendent
Wastewater Department
Energy Recovery Upgrade — Methuen Construction Change Order #2
. THE CITY OF NASHUA "The Gate City"
Administrative Services
Purchasing Department
September 26, 2019
Memo #20-037
TO: MAYOR DONCHESS
FINANCE COMMITTEE
SUBJECT: CONTRACT FOR ENERGY RECOVERY UPGRADES — CONSTRUCTION SERVICES —
CHANGE ORDER 2 (VALUE $21,181)
DEPARTMENT: 169 WASTEWATER; FUND: WASTEWATER
RWC
ENTERPRISES
PO BOX 3721
Nashua,NH 03061
PHONE : 603-765-5087
Proposal Date:9/9/2019
TO :City of Nashua Engineering
River St
Nashua NH 03062
Commercial St sewer Replacement
1. Mobilization
2. Remove and replace 86 |.f of 18” sewer
3. Replace sewer manhole # 2401 (casting by street dept)
4.Replace Catch Basin #1 (casting by Street dept)
5. Make connections to pipe for CB #2,3,4
6. Make connection at SMH 2400A
Summary
CHANGE IN CONTRACT PRICE:
Original Contract Price
$129,900
Original Contract Times
Ready for final payment:
CHANGE IN CONTRACT TIMES:
Substantial completion: N/A
December 2, 2019
Net changes from previous Change Orders
30
Net change from previous Change Orders
0 days
Contract Price prior to this Change Order
$129,900
Ready for final payment:
Contract Times prior to this Change Order
Substantial completion: N/A
December 2, 2019
CHANGE ORDER
No. 1
PROJECT: Monica Drive Drainage Improvements
OWNER’S CONTRACT NO: IFB0779-080619
EXECUTED CONTRACT DATE: September 19, 2019
DATE OF ISSUANCE: 09/19/19 EFFECTIVE DATE: Upon City Approval
OWNER: City of Nashua, NH
OWNER’s Purchase Order NO.: 152522
CONTRACTOR: RWC Enterprises
ENGENEER: DPW Engineering
You are directed to make the following changes in the Contract Documents:
Description:
RWC
ENTERPRISES
PO BOX 3721
Nashua,NH 03061
PHONE : 603-765-5087
Proposal Date:9/9/2019
TO :City of Nashua Engineering
River St
Nashua NH 03062
Commercial St sewer Replacement
1. Mobilization
2. Remove and replace 86 Lf of 18” sewer
3. Replace sewer manhole # 2401(casting by street dept)
4,.Replace Catch Basin #1(casting by Street dept)
5. Make connections to pipe for CB #2,3,4
6. Make connection at SMH 2400A