Finance Committee - Agenda - 3/6/2019 - P607

By dnadmin on Mon, 11/07/2022 - 13:12
Document Date
Fri, 03/01/2019 - 12:37
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/06/2019 - 00:00
Page Number
607
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__030620…

SECTION 02650

CURED-IN-PLACE PIPE (CIPP) LINING OF EXISTING SEWERS
(HOT WATER & STEAM)

PART 1 GENERAL

1.01 DESCRIPTION

A.

SCOPE

The work consists of furnishing all labor, equipment, materials, and incidentals
required to rehabilitate existing sewer mains by the installation of cured-in-place
pipe (CIPP) into the existing main. Work will include bypass pumping, sewer
cleaning and root cutting including decanting and disposal of debris at the City
landfill, initial closed circuit television (CCTV) inspection, identification of
existing live taps, removing of protruding taps by remote methods, installation of
resin-impregnated tube into the existing pipe followed by hot water or steam
curing as specified by the resin manufacturer, reopening service taps into the line,
sampling and testing, final closed circuit television (CCTV) inspection, and all
other related work. Before final acceptance of each line segment, a post-
rehabilitation video inspection and sample testing must be conducted and
approved. Rehabilitation must be completed for the full length from the manhole
to manhole, resulting in a sound, tight-fitting water-tight liner with a smooth
interior surface. All such work shall comply with these specifications and the
specific product manufacturer’s recommendations. Any conflict between the
product manufacturer’s recommendations and any portion of the contract
documents shall be resolved with the Engineer prior to proceeding with the work.

The Contractor, or the sub-contractor(s), shall not change any material, design
values or procedural matters stated or approved herein, without informing the
Engineer and receiving written advance approval of the change

Note:

Reference is made to the Supplementary Conditions Section A. Prosecution of
Work for a description of the process by which the Engineer will direct the
Contractor to make spot repairs both before and after lining.

SAFETY

This standard does not address safety problems associated with the use of this
product. It is the responsibility of the Contractor to establish appropriate safety
and health practices and determine the applicability of regulatory limitations prior
to use.

1.02 RELATED WORK:

A. Section 01110, CONTROL OF WORK AND MATERIALS

2019 CIPP Lining Project CIPP Lining of Existing Sewers (Hot Water or Steam)

Nashua, NH

02650-1