Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Agenda

Agenda

Finance Committee - Agenda - 6/7/2017 - P407

By dnadmin on Mon, 11/07/2022 - 10:23
  • Read more about Finance Committee - Agenda - 6/7/2017 - P407

6.14 Safety Representative

A. CONTRACTOR shall designate a qualified and experienced safety representative at the Site whose duties and
responsibilities shall be the prevention of accidents and the maintaining and supervising of safety precautions and
programs. Work Site is subject to safety inspection by the City Safety Representative at any and all times.

6.15 Hazard Communication Programs

Finance Committee - Agenda - 6/7/2017 - P406

By dnadmin on Mon, 11/07/2022 - 10:23
  • Read more about Finance Committee - Agenda - 6/7/2017 - P406

2. All the Work and materials and equipment to be incorporated therein, whether in storage on or off the Site; and

3. Other property at the Site or adjacent thereto, including trees, shrubs, lawns, walks, pavements, roadways,
structures, utilities, and Underground Facilities not designated for removal, relocation, or replacement in the
course of construction.

Finance Committee - Agenda - 6/7/2017 - P405

By dnadmin on Mon, 11/07/2022 - 10:23
  • Read more about Finance Committee - Agenda - 6/7/2017 - P405

6.12 Record Documents

A. CONTRACTOR shall maintain in a safe place at the Site one record copy of all Drawings, Specifications,
Addenda, Written Amendments, Change Orders,

Finance Committee - Agenda - 6/7/2017 - P404

By dnadmin on Mon, 11/07/2022 - 10:23
  • Read more about Finance Committee - Agenda - 6/7/2017 - P404

I. If blasting or use of explosives is necessary for prosecution of Work, the CONTRACTOR shall provide the
ENGINEER with a blasting plan in compliance with OSHA, State, and local regulations, laws, ordinances, and
requirements. CONTRACTOR shall exercise the utmost care not to endanger life or property. CONTRACTOR shall
be responsible for all damage resulting from the use of explosives. CONTRACTOR shall notify each property
OWNER and utility company having structures or facilities in proximity to the site of the work of its intentions to use

Finance Committee - Agenda - 6/7/2017 - P403

By dnadmin on Mon, 11/07/2022 - 10:23
  • Read more about Finance Committee - Agenda - 6/7/2017 - P403

Risk Management
City of Nashua
229 Main Street

Nashua, NH 03060

Finance Committee - Agenda - 6/7/2017 - P402

By dnadmin on Mon, 11/07/2022 - 10:23
  • Read more about Finance Committee - Agenda - 6/7/2017 - P402

6.09 Laws and Regulations

A. CONTRACTOR shall give all notices and comply with all Laws and Regulations applicable to the performance of
the Work. Except where otherwise expressly required by applicable Laws and Regulations, neither OWNER nor
ENGINEER shall be responsible for monitoring CONTRACTOR’s compliance with any Laws or Regulations.

Finance Committee - Agenda - 6/7/2017 - P401

By dnadmin on Mon, 11/07/2022 - 10:23
  • Read more about Finance Committee - Agenda - 6/7/2017 - P401

any such Subcontractor, Supplier, or other individual or entity except as may otherwise be required by Laws and
Regulations.

D. CONTRACTOR shall be solely responsible for scheduling and coordinating the Work of Subcontractors,
Suppliers, and other individuals or entities performing or furnishing any of the Work under a direct or indirect contract
with CONTRACTOR.

E. CONTRACTOR shall require all Subcontractors, Suppliers, and such other individuals or entities performing or
furnishing any of the Work to communicate with ENGINEER through CONTRACTOR.

Finance Committee - Agenda - 6/7/2017 - P400

By dnadmin on Mon, 11/07/2022 - 10:23
  • Read more about Finance Committee - Agenda - 6/7/2017 - P400

B. Substitute Construction Methods or Procedures:. If a specific means, method, technique, sequence, or procedure
of construction is shown or indicated in and expressly required by the Contract Documents, CONTRACTOR may
furnish or utilize a substitute means, method, technique, sequence, or procedure of construction approved by
ENGINEER. CONTRACTOR shall submit sufficient information to allow ENGINEER, in ENGINEER’s sole
discretion, to determine that the substitute proposed is equivalent to that expressly called for by the Contract

Finance Committee - Agenda - 6/7/2017 - P399

By dnadmin on Mon, 11/07/2022 - 10:23
  • Read more about Finance Committee - Agenda - 6/7/2017 - P399

6.05 Substitutes and “Or-Equals”

Finance Committee - Agenda - 6/7/2017 - P398

By dnadmin on Mon, 11/07/2022 - 10:23
  • Read more about Finance Committee - Agenda - 6/7/2017 - P398

B. Except as otherwise required for the safety or protection of persons or the Work or property at the Site or adjacent
thereto, and except as otherwise stated in the Contract Documents, all Work at the Site shall be performed during
regular working hours, and CONTRACTOR will not permit overtime work or the performance of Work on Saturday,
Sunday, or any legal holiday without OWNER’s written consent (which will not be unreasonably withheld) given after
prior written notice to ENGINEER.

Pagination

  • Previous page ‹‹
  • Page 1256
  • Next page ››
Subscribe to Agenda

Footer menu

  • Contact