Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 6/7/2017 - P398

Finance Committee - Agenda - 6/7/2017 - P398

By dnadmin on Mon, 11/07/2022 - 10:23
Document Date
Wed, 06/07/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/07/2017 - 00:00
Page Number
398
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060720…

B. Except as otherwise required for the safety or protection of persons or the Work or property at the Site or adjacent
thereto, and except as otherwise stated in the Contract Documents, all Work at the Site shall be performed during
regular working hours, and CONTRACTOR will not permit overtime work or the performance of Work on Saturday,
Sunday, or any legal holiday without OWNER’s written consent (which will not be unreasonably withheld) given after
prior written notice to ENGINEER.

C. The following list of streets will require prior approval to close a lane and may require flagging or police details

and may have work time restrictions.

Allds Street East Hollis Street
Amherst Street Henri Burque Hwy
Arlington Street Kinsley Street
Bridge Street Ledge Street
Broad Street Main Dunstable Road
Broad Street Parkway Main Street

Canal Street Manchester Street
Central Street Pine Hill Road
Concord Street Somerset Parkway
Daniel Webster Highway Spitbrook Road
East Dunstable Road West Hollis Street

6.03 Services, Materials, and Equipment

A. Unless otherwise specified in the General Requirements, CONTRACTOR - shall provide and assume full
responsibility for all services, materials, equipment, labor, transportation, construction equipment and machinery,
tools, appliances, fuel, power, light, heat, telephone, water, sanitary facilities, temporary facilities, and all other
facilities and incidentals necessary for the performance, testing, start-up, and completion of the Work.

B. All materials and equipment incorporated into the Work shall be as specified or, if not specified, shall be of good
quality and new, except as otherwise provided in the Contract Documents. All warranties and guarantees specifically
called for by the Specifications shall expressly run to the benefit of OWNER. If required by ENGINEER,
CONTRACTOR shall furnish satisfactory evidence (including reports of required tests) as to the source, kind, and
quality of materials and equipment. All materials and equipment shall be stored, applied, installed, connected,
erected, protected, used, cleaned, and conditioned in accordance with instructions of the applicable Supplier, except as
otherwise may be provided in the Contract Documents.

6.04 Progress Schedule

A. CONTRACTOR shall adhere to the progress schedule established in accordance with paragraph 2.07 as it may be
adjusted from time to time as provided below.

1. CONTRACTOR shall submit to ENGINEER for acceptance (to the extent indicated in paragraph 2.07)
proposed adjustments in the progress schedule that will not result in changing the Contract Times (or Milestones).
Such adjustments will conform generally to the progress schedule then in effect and additionally will comply with
any provisions of the General Requirements applicable thereto.

2. Proposed adjustments in the progress schedule that will change the Contract Times (or Milestones) shall be

submitted in accordance with the requirements of Article 12. Such adjustments may only be made by a Change
Order or Written Amendment in accordance with Article 12.

GC - 20 of 54