Finance Committee - Minutes - 8/3/2016 - P31

April 14, 2022
Pipe Crew Cost with (2) Oump Trucks (8 hour min.}
Traffic Control (Flaggers - 2 EA}
Police Details (if can fill; pass thraugh cost)
24" HDPE Pipe with Bedding/Backfill
15" SOR 35 Pipe with Bedding/Backfill plus Strongbacks
12" SOR 35 Pipe with Bedding/Backfilt
8" SDR 35 Pipe with Bedding/Backfill
12x8 Wye ; - a
4' Dia Catch Basin with Frame and Grate and CB Hoods
4' Dia Sewer Manhole with Frame, Cover and Invert
Flowable Fill (min. yardage}
Freight
Vibration Monitor
Vactor Truck
Light Tower Rental
Message Board Rental
4" Temp Pavement
7" Asphalt (Permanent)
Sawcut Pavement (estimated qty)
18" Crushed Gravel Base
Unclassified Excavation _
$.U.R. Construction West, inc.
Emergency Sewer Repair - Main Street & Water Street
Total Emergency Sewer Repair, plus Optional As Needed
Notes:
Quantity Unit Unit Price Total Price
60 HR 1,100.00 66,000.00
120 HR 40.00 4,800.00
1 ALLOW 5,000.00 5,000.00
20 LF 90.00 1,800.00
14 LF 115.00 1,610.00
80 LF 75.00 6,000.00
[23 le 60.00 1,380.00
2 EA [1,000.00 2,000.00
2 lea [1,700.00 3,400.00 =
i EA [2,850.00 2,850.00 j
4 cy 200.00 800.00
ja LS 750.00 [750.00 |
ia WK 600.00 |600.00
[2. [Night [2,300.00 4,600.00
la EA 450.00 1,800.00 i
2 [wk [350.00 {700.00
[4s TN {85.00 _|4,080.00
85, [tn “185.00 17,225.00
[300 UF 10.00 {3,000.00
178 Iev [35.00 {6,230.00
|221 CY includedincrewcost |
_____|124,625.00
|. Crew Cost to be invoiced based on actual time spent - this should | bea conservative amount of time
* Pipe materials are available including freight time by the end of this week; we can mobilize for a Monday 4/18 start
* Paving and excavation / crushed gravel and time is included here but we can break out that time if you prefer to pay it through bid items
From: Kooken, Daniel
Sent: Tuesday, August 02, 2016 4:46 PM
To: Siegel, Ken
Subject: RE: Finance Committee meeting question on Stanley Elevator contract, etc
The thinking was that Stanley Elevator is familiar with the equipment and has a long history of high
quality on the services on previous and current contracts. There is an urgency for these repairs but the
lead time quoted for the repairs is 34 weeks so it would be late 2016 or early 2017 before they would be
completed. Jay Hunnewell, Building Manager is attending Wednesday evening’s Finance Committee
Meeting and can help answer additional questions.
Below is additional information we were provided by Stanley today. |’ll have copies available for all
tomorrow evening:
Here is an approximate breakdown of the costs for each major portion of the project. Keep in mind that
this proposal is based on performing this entire scope at one time {i.e. one mobilization). This makes it
more cost-effective because we can order all of the equipment at once and go through the entire
modernization with the same team of men. As you know it costs more to back out certain items and
complete them separately. This would be our recommended scope for the job given the age and
condition of the equipment. If you are looking for savings, | would say the areas we could reduce would
probably be the cab (aesthetics).
Budget proposal of elevator scope: $184,000.00
1. Machine (also includes motor, sheaves, rope brake, governor, etc.): $50,000.00
2. Controller: $60,000.00
3. Fixtures: $20,000.00
4. Caband flooring: $21,000.00
5. Door operator and door equipment: $17,000.00
6. Roller Guides: $8,000.00
™
Warranty / Maintenance after job is complete: $8,000.00
Also please note the numbers above do not include “work by others” such as new disconnects, HVAC,
etc. as required. This is typically handled by a general contractor, For example, right now we are doing
5 elevator modernizations with the Nashua Housing Authority. DL King is the general contractor and
they have the main contract, and they are using Stanley as a subcontractor
The GIS software is a 3 year commitment So you are correct that it will have to be approved by the full
Board of Aldermen if it passes at the Finance Committee meeting on 8/3/16. The City is paying $25K
yearly and not $75K all up front which is half of the total. Pennichuck Corp. is paying the other half. The
GIS software will be presented by the Mayor for approval at the BOA Meeting on 8/9/16 which is the
next meeting after the 8/3/16 Finance Committee meeting. Thank you,
8/3/16 PROPOSED AMENDMENTS TO O-16-015
ORDINANCE
PROVIDING FOR CONFIDENTIAL REDACTIONS ON THE RECORD OF
EXPENDITURES
CITY OF NASHUA
In the Year Two Thousand and Sixteen
The City of Nashua ordains that Part I “Administrative Legislation”, Chapter 5
“Administration of Government’, Part 7 ‘“‘Taxation and Finance”, Article XX VI “Accounts and
Warrants”, Section 5-129 “Record of accounts or claims allowed” of the Nashua Revised
Ordinances as amended, is hereby further amended by adding the new underlined language as
follows:
“§ 5-129. Record of accounts or claims allowed.
The Chief Financial Officer shall keep a record of expenditures, in which he or she shall
enter:
A. The amount and date paid of every account or claim to be examined and audited
the Finance Committee.
B. The name of the person to whom the account or claim was allowed.
Notwithstanding the foregoing, the name of the person or entity to whom the
account or claim was allowed may be redacted in the following situations:
(1) wage garnishments;
(2) workers’ compensation payments; and
(3) payments where disclosure could endanger or compromise police
department personnel. Redactions in this situation may be overridden by a
vote of the Finance Committee.
C, The fund or appropriation from which the account or claim was allowed.
D. The certificate of the Finance Committee examination and audit of the account or
claim.”
All ordinances or parts of ordinances inconsistent herewith are hereby repealed.
This legislation shall take effect upon passage.
7:00 PM
FINANCE COMMITTEE
AUGUST 3, 2016
Aldermanic Chamber
ROLL CALL
PUBLIC COMMENT
COMMUNICATIONS
From:
Re:
From:
Re:
From:
Re:
From:
Re:
From:
Re:
From:
Re:
From:
Re:
From:
Re:
From:
Re:
Dan Kooken, Purchasing Manager
Purchase Lawson Upgrade on In-House Hosting (Value: $326,163)
Department: 122 Information Technology Fund: Escrow $236,163 and IT Software Maintenance
$90,000
Dan Kooken, Purchasing Manager
Approve Purchase of a 50 KW Generator for Shakespeare Tower Site (Value: $13,378)
Department: 157 Citywide Communications; Fund: Citywide Communications Capital Projects
Account
Dan Kooken, Purchasing Manager
Contract Award for Climate and Health Adaptation Planning (Value: $38,000)
Department: 171 Community Services; Fund: Climate and Health Adaptation Plan Grant
Accounting Classification: 55 Other Contracted Services
Dan Kooken, Purchasing Manager
Contract Award for City Hall Elevator Modernization (Value: $184,000); Department: 126
Financial Services; Fund: Trust Fund; Accounting Classification: 81 Buildings and Improvements
Dan Kooken, Purchasing Manager
Esri Software License Renewal (Value: $25,000); Department: 134 GIS; Fund: General Fund
Accounting Classification: 54 Property Services
Dan Kooken, Purchasing Manager
Contract Award for Roadside and Trail Mowing (Value: Not-to-Exceed $26,000); Department: 177
Parks and Recreation; Funds: General and Trust Account Category: Professional Services $22,000
Department; 169 Wastewater; Fund: Wastewater; Account Category: 55 Other Purchased Services
$4,000
Dan Kooken, Purchasing Manager
Approve Purchase of a Replacement Toro Groundmaster 3505-D Mower (Value: $27,627)
Department: 177 Parks And Recreation; Fund: Trust Activity: CERF
Dan Kooken, Purchasing Manager
Approve Purchase of an Integration Carousel for Labine Park (Value: $50,715); Department: 177
Parks and Recreation; Fund: General Activity: Labine Park
Dan Kooken, Purchasing Manager
Rail Trail Lighting (Value: $87,288); Department: 177 Parks & Recreation; Fund: CIP
Activity: Rail Trail Lighting