Board Of Aldermen - Agenda - 11/10/2020 - P79
EXH I B IT K 10 Harvey Road
HARVEY blr
F; (603) 658-0388
harveycosstructlon.cort
Project Noykue Performing Art Center Date Oct, 19,2020
Lecative: Nashua, NE
Holue Engineering Log
1; Ace
Extimeted Cost 2: Ret Accepted Lies | Rejected Jregs | Techedhs items
3:Tat
Ort 1,
Oct, 19, 2020
Ort.
Oct
FEE Oet
Mowe VIP
This Hirick for Srisepenr! Fiber Cement Pane] Oct. 19, 2628
3500 LB Hievator
S/S] 8: 18/8] S/ 9/8
‘2020
Det 15, 2620
Oct 19,2620
& Ramps to Concrete, On, 1, 2020
CMF to Copibest Patios * Geb, 19, 708 . : 48320,782)
Covers to brake metal — ‘, Oct. 19,2876"
Com
=z
1-1/2" Privyed CS Tubing Get 19,2020
wood infill at Back row of Parterre handrails Oet 19,2020
£
#/ 3 |slelslels
wood infil] Handrails with Metal mesh oF metal Oct 19, 2020
Better Seb Pricing o0- Cladding, Gh-® AnumioMm . a
: ” ot et, 19, 2028
Ost 19,2920
O02 ft RFT at at-L Ont 19,
Changes 16 RFS Det 5, 2020
Okt
Cetmbrit Intine versus Swisspesd FCP b> ofan 06
JGNTT COST PER 5Q. FT. for We ee toe
vertically apd Vere Lice VEN 166 . 9-Fan-00
Baleway above Main St
TARGET
Tatal $15,803,503
Current Construction Coat Estimate 918,750,542 «+—
Adjurtineals {S2,9729,152)
Rovised Carstraetion Cost
songr2ed0 227 PM 1oft DRAFT