Board Of Aldermen - Agenda - 6/26/2018 - P11
(4)
An explanation of the reason for such location shall be made on the vibration
monitoring report for such structure and the peak particle velocity (in
inches/second) shall be extrapolated to the structure using standard relations.
(5) Blasting seismographs used to monitor ground and air vibrations shall comply
with ISEE “Performance Specifications for Blasting Seismographs”’.
(6) Where used, blasting seitsmographs shall be deployed in the field according to the
ISEE “Field Practice Guidelines for Blasting Seismographs’”’.
(7) The Fire Marshal may require additional measuring devices when necessary to
protect property.
(8) If an owner refuses to allow for or waives the placement of seismic measuring
equipment, the Applicant shall note this on the vibration monitoring report.
(9) Documentation of any such refusal shall be filed with the Nashua Fire Marshal’s
Office to include the date, time and, if available, the names of the persons giving
the refusal.
Blasting Notification.
(1) The Applicant shall contact the non-emergency number for Nashua Fire Dispatch
not less than each day before blasting, and fifteen (15) minutes before the
scheduled blast and provide the address of the blasting site, the total pounds of
explosives and the number of charged holes.
(2) The Applicant shall notify the Fire Dispatch when the “all clear” has been given
after the scheduled blast.
G3) Signboards and flags indicating areas where blasting operations are occurring
shall be clearly visible and legible from all points of access to the area.
(4) Blast area signs shall clearly indicate the length and nature of audible blast
warning and all clear signals.
(5) The Applicant shall use sirens or horns or both sirens and horns with sufficient
intensity such that they can be heard for a minimum distance of one thousand
(1,000) feet in all directions.
Fly Rock Control.
(1) Except as previously approved by the Fire Marshal, all blasts within one thousand
(1,000) feet of any structure, power transmission line or communications tower
shall be covered with an adequate blasting mat or shield and secured together
properly.