Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Search

Search

Displaying 24251 - 24260 of 38765

Finance Committee - Agenda - 5/17/2017 - P160

By dnadmin on Mon, 11/07/2022 - 10:25
Document Date
Wed, 05/17/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/17/2017 - 00:00
Page Number
160
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__051720…

{Item # Item Description Estimated Quantity Unit Unit Price Total Price}
20 REMOVE EXISTING PIPE BY EXCAVATION OUTSIDE OF 25.00 LF $100.00 $2,500.00
AN ADJACENT TO PROPOSED PIPE TRENCH
2Q REMOVE TOP 3VF OF EXIST STRUCTURE, FILL WITH 5.00 EACH $745.00 $3,725.00
GRAVEL, RESTORE ROAD
2R REMOVE ABANDONED LATERAL, FILL WITH GRAVEL, 20.00 EACH $1,650.00 $33,000.00
RESTORE ROAD
2S(12M) ROOT CUTTING , 12" PIPE - MEDIUM ROOTS 1.00 LF $475.00 $475.00
25(18M) ROOT CUTTING 18” PIPE - MEDIUM ROOTS 1.00 LF $475.00 $475.00
3A CATCH BASIN (INSTALL OR REPLACE) 60.00 EACH $3,150.00 $189,000.00
3B omer SMH FRAME AND COVER OR CB FRAME AND 6.00 EACH $150.00 $900.00
3C REPLACE 24" CB FRAME AND GRATE 5.00 EACH $460.00 $2,300.00
3D REPLACE 30" MH FRAME AND COVER 5.00 EACH $500.00 $2,500.00
4A TEST PITS 880.00 CY $1.00 $880.00
SA CALCIUM CHLORIDE 34,000.00 LB $0.01 $340.00
5B SILT SACK 100.00 EACH $56.00 $5,600.00
68 CRUSHED GRAVEL 5,800.00 CY $36.00 $208,800.00
6B(1) Ane NS (ROADWAY GRAVELS PRIOR TO BASE 14,500.00 SY $1.75 $25,375.00
6c BINDER (BASE) COURSE MATERIAL HOT BIT 3,000.00 TON $90.18 $270,540.00
PAVEMENT
6D TOP COURSE MATERIAL HOT BITUMINOUS PAVEMENT 970.00 TON $87.34 $84,719.80
6E TEMPORARY BITUMINOUS PAVEMENT 1,210.00 TON $63.00 $76,230.00
6F(1) COMMON EXCAVATION FOR ROADWAY GRAVEL, 8,000.00 CY $12.50 $100,000.00
PAVEMENT AND INCREASE OF CURB REVEAL
6G SAWED BITUMINOUS PAVEMENT 10,500.00 LF $2.00 $21,000.00
6H COLD PLANNING 250.00 SY $13.10 $3,275.00
61 REMOVE AND RESET GRANITE CURBING 2,300.00 LF $25.00 $57,500.00
6) INSTALL VERTICAL GRANITE CURBING 10.00 LF $42.00 $420.00
6K REMOVE AND REPLACE 4" PC CONCRETE SIDEWALK 710.00 SY $48.00 $34,080.00
6K(1) REMOVE AND REPLACE 6" PC CONCRETE DRIVEWAY 30.00 SY $65.00 $1,950.00
6L REMOVE AND REPLACE 2" BITUMINOUS CONCRETE 180.00 SY $34.00 $6,120.00
SIDEWALK
6M HOT BITUMINOUS PAVEMENT HAND METHOD 70.00 TON $120.00 $8,400.00
6N DETECTABLE WARNING AT WHEELCHAIR RAMP 30.00 EACH $1,250.00 $37,500.00
60 REMOVE AND RESET BRICK SIDEWALK 150,00 SY $44.00 $6,600.00
6Q ASBESTOS PIPE REMOVAL (ALL DIAMETERS) 30.00 LF $80.00 $2,400.00
6S REMOVAL OF 6" THICK CONCRETE UNDER PAVEMENT 40.00 SY $25.00 $1,000.00
7A MOBILIZATION 1.00 LS $145,000.00 $145,000.00
8A POLICE OFFICERS 1.00 AL $92,000.00 $92,000.00
8B FLAGMEN 1.00 AL $72,000.00 $72,000.00
8C MAINTENANCE OF TRAFFIC 1.00 LS $150,000.00 $150,000.00
8D RAISED TEMP, PAVEMENT MARKERS DOUBLE FACED 140.00 EACH $5.00 $700.00
8E 4" RETROREFLECTIVE WHITE PAINTED LINES 2,300.00 LF $0.25 $575.00
8F 4" DOUBLE RETROREFLECTIVE YELLOW PAINTED 1,100.00 LF $0.50 $550.00
LINES
8G 12" RETROREFLECTIVE WHITE THERMO LINES 3,330.00 LF $5.00 $16,650.00
81 SIGNAL DETECTOR LOOPS 1.00 EACH $2,200.00 $2,200.00
a) REMOVE AND RESET STOP SIGN 1.00 EACH $25.00 $25.00
9A ASPHALT CEMENT COST ADJUSTMENT 1.00 AL $18,000.00 $18,000.00
9B NIGHT CREW 140.00 HR $1.00 $140.00
9C ASBESTOS MATERIAL REMOVAL DISPOSAL 1.00 AL $25,000.00 $25,000.00
10 DYE TESTING CONNECTIONS 90.00 EACH $25.00 $2,250.00
11 CONTINGENCY FOR RAILROAD COORDINATION ON 1.00 AL $20,000.00 $20,000.00
TEMPLE STREET
11A CONTINGENCY FOR CONTAMINATED SOIL 1.00 AL $20,000.00 $20,000.00
EXCAVATION AND DISPOSAL
12(12) PRE CONSTRUCTION SEWER VIDEOS FOR 100.00 LF $3.00 $300.00
REPLACEMENT OF 12" PIPE INCLUDES ALL
PRECLEANING
12(15) PRE CONSTRUCTION SEWER VIDEOS FOR 560.00 LF $4.00 $2,240.00
REPLACEMENT OF 15” PIPE, INCLUDES ALL
PRECLEANING
12(24) PRE CONSTRUCTION SEWER VIDEOS FOR 550,00 LF $4.00 $2,200.00
4/19/2017 12:33:07 PM Page 2 of 3

Page Image
Finance Committee - Agenda - 5/17/2017 - P160

Finance Committee - Agenda - 5/17/2017 - P161

By dnadmin on Mon, 11/07/2022 - 10:25
Document Date
Wed, 05/17/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/17/2017 - 00:00
Page Number
161
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__051720…

|Ttem # Item Description Estimated Quantity Unit Unit Price Total Price|
REPLACEMENT OF 24” PIPE, INCLUDES ALL PRE
CLEANING
Total Price for above Items: $3,175,323.30

; ACCEPTED:

The above prices, specifications and conditions are satisfactory and
are hereby accepted.

Buyer: STEPHEN DOOKZAN)

odbn)- (L-—
tlis/ ie

Signature:

Date of Acceptance:

4/19/2017 12:33:07 PM

Total Bid Price: $3,175,323.30

CONFIRMED:

DEFELICE CORPORATION
Authorized Signatute WS
Estimator: “

Page 3 of 3

Page Image
Finance Committee - Agenda - 5/17/2017 - P161

Finance Committee - Agenda - 5/17/2017 - P162

By dnadmin on Mon, 11/07/2022 - 10:25
Document Date
Wed, 05/17/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/17/2017 - 00:00
Page Number
162
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__051720…

IFB0779-041217
2017 SEWER REPLACEMENT PROGRAM

CONSTRUCTION CONTRACTOR’S
QUALIFICATION STATEMENT

On Schedule A, attached, list major engineered construction projects completed by this 4
organization in the past five (5) years. (If joint venture, list each participant’s projects separately).

On Schedule B, attached, list current projects under construction by this organization, (If joint
venture, list each participant’s projects separately).
Name of Surety Company and name, address, and phone number of agent.

Arch Tnsyran Com pany

2ou Plaza Thee

suese,Cely New oO} D\\

Is your organization a member of a controlled group of corporations as defined in IR.C. Sec.
1563?

[_lYes Sho

If yes, show names and addresses of affiliated companies.

Furnish on Schedule C, attached, details of the construction experience of the principal
individuals of your organization directly involved in construction operations.

Has your organization ever failed to complete any construction contract awarded to it?

[ lYes Avo

If yes, describe circumstances and provide details on attachment.

Has any Corporate officer, partner, joint venture participant or proprietor ever failed to complete
a construction contract awarded to him or her in their own name or when acting as a principal of
another organization?

[lYes Dxhyo

If yes, describe circumstances and provide details on attachment.

In the last five years, has your organization ever failed to substantially complete a project in a
timely manner?

[_Tyes |AINo

[_lYes

If yes, describe circumstances and provide details on attachment.

CQ-1of7

Page Image
Finance Committee - Agenda - 5/17/2017 - P162

Finance Committee - Agenda - 5/17/2017 - P163

By dnadmin on Mon, 11/07/2022 - 10:25
Document Date
Wed, 05/17/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/17/2017 - 00:00
Page Number
163
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__051720…

10.

ll.

12.

13.

14.

15.

IFB0779-041217
2017 SEWER REPLACEMENT PRO GRAM

Does your organization now have any legal suits or arbitration claims pending or outstanding
against it or any officers?

[_lYes Dio

If yes, describe circumstances and provide details on attachment.
Has your organization had a contract partially or completely terminated for default (cause) within
the past five years?

[_lYes Lo

If yes, describe circumstances and provide details on attachment.

List the licensed categories f work that your company normally performs with its own
workforce. LS «| MA , Aran, One, St werk,
DK Cot els , Ducrp Skutormy bu\werrn, sihererel les, grins

If required, can your organization provide a bid bond for this project?
Yes [_|No

What is your approximate total bonding capacity?

[]$500,000 to $2,000,000

[1$2,000,000 to $5,000,000

[1$5,000,000 to $10,000,000

PJs10,000,000 or more

Describe the permanent safety program you maintain within your organization. Use attachment if

nT Ne howto. Socree panel An nol penolrt
Crmpon Acts Sve, visits on A Fraining rst Wr bower
qn ann ve FRA IMS Mash 7

Furnish the following information with respect to an accredited banking institution familiar with
your organization.

Name of Bank [Y) [ A of lead Bawk

Address YG 4 Tad Pod eA Sule. (Ld
(NA Trem, MA OLUST

Account Manager Mr ew Sin BAA ia

Telephone VEL -U71Y4-S)714

CQ -2 of 7

Page Image
Finance Committee - Agenda - 5/17/2017 - P163

Finance Committee - Agenda - 5/17/2017 - P164

By dnadmin on Mon, 11/07/2022 - 10:25
Document Date
Wed, 05/17/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/17/2017 - 00:00
Page Number
164
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__051720…

IFB0779-041217
2017 SEWER REPLACEMENT PROGRAM

I hereby certify that the information submitted herewith, including any attachment is true to the best of

my knowledge and belief.

By: —
ep Fe le tw /\)\

Title: Fre G

Dated: (C/]

CQ -3 of 7

Page Image
Finance Committee - Agenda - 5/17/2017 - P164

Finance Committee - Agenda - 5/17/2017 - P165

By dnadmin on Mon, 11/07/2022 - 10:25
Document Date
Wed, 05/17/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/17/2017 - 00:00
Page Number
165
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__051720…

IFB0779-041217
2017 SEWER REPLACEMENT PROGRAM

This Page Intentionally Left Blank

CQ -40f7

Page Image
Finance Committee - Agenda - 5/17/2017 - P165

Finance Committee - Agenda - 5/17/2017 - P166

By dnadmin on Mon, 11/07/2022 - 10:25
Document Date
Wed, 05/17/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/17/2017 - 00:00
Page Number
166
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__051720…

240G-09

ayo Say

peyajdwiog 338d yoourbug ubiseq J0UMO yoalold jo uoljdis9seq
pue uolje90°] ‘OUeN

auoUd Bg SSAIPPY B «-BIHW ORIPUOH
j9e}U0D/A9USI9jOY

$1edA (g) SAW }SEd 3U} Ul poyajduioy sjIalOld UononsjSuod peisou! ug s0few 30 IS!1—-V ainpeyss

WVuDOUd LNAWAOV Ida AAMAS L10~
LIT1y0-6LL0ES1

Page Image
Finance Committee - Agenda - 5/17/2017 - P166

Finance Committee - Agenda - 5/17/2017 - P167

By dnadmin on Mon, 11/07/2022 - 10:25
Document Date
Wed, 05/17/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/17/2017 - 00:00
Page Number
167
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__051720…

2399-09

reyes Sy4s 9

yosloid jo uondis9seq

euoud uoljajdwioa payajdwo5 add JORBIWUOH sgooulbug J9UMO ;
9 SSOJIPPY B pajnpayss jo a3eq jyunowy ubiseqg pue uoljze907] ‘OWEN
JOR]UOD/aDUdIOJOY

UOHONIISUOD JOPUN) SJIaTOAd JUSIIND JO 75M — g ainpeyss

WVUDOUd LNANFOV 1daa MAMAS L10¢
Li@1v0-6LL0Ea1

Page Image
Finance Committee - Agenda - 5/17/2017 - P167

Finance Committee - Agenda - 5/17/2017 - P168

By dnadmin on Mon, 11/07/2022 - 10:25
Document Date
Wed, 05/17/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/17/2017 - 00:00
Page Number
168
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__051720…

2302-D9

PM rr say

uonjoniysuo0s uoljon1j}sues uoneziuebio siy3 UOdI}ISOd owen
ul sduaLedxa puke sUOIISOd JON, ul Burjiom UM peyej}s a3eq
poye}s a3eq

SUoWeINdo Ud|joNs}SUOD Ul POAJOAU] SjenpiAlpu| fedioulld JO eoualiodxy UOHONAYSUOD - 95 ajnpsyss

WV'aooudd LNAWHOV Ida AAMAS L107
L1@1v0-6LL0EA1

Page Image
Finance Committee - Agenda - 5/17/2017 - P168

Finance Committee - Agenda - 5/17/2017 - P169

By dnadmin on Mon, 11/07/2022 - 10:25
Document Date
Wed, 05/17/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/17/2017 - 00:00
Page Number
169
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__051720…

DIVISION 4

PERFORMANCE AND
PAYMENT BONDS

Page Image
Finance Committee - Agenda - 5/17/2017 - P169

Pagination

  • First page « First
  • Previous page ‹‹
  • …
  • Page 2422
  • Page 2423
  • Page 2424
  • Page 2425
  • Current page 2426
  • Page 2427
  • Page 2428
  • Page 2429
  • Page 2430
  • …
  • Next page ››
  • Last page Last »

Search

Meeting Date
Document Date

Footer menu

  • Contact