Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Search

Search

Displaying 19041 - 19050 of 38765

Finance Committee - Agenda - 3/20/2019 - P74

By dnadmin on Mon, 11/07/2022 - 13:08
Document Date
Wed, 03/20/2019 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/20/2019 - 00:00
Page Number
74
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__032020…

The testing agency will perform inspections at the plant during all paving operations.
In addition to performing testing as described above, the technician assigned to plant
inspections shall observe all materials and observe the hot-mix batching process

The testing agency shall submit sample test result forms for review by the Engineer
two weeks after Notice to Proceed. Content and format of those forms must be
approved by the Engineer prior to receiving actual results.

To the extent practical tests shall be performed while technician is at the plant.
Payment items are provided for tests performed at the plant, as well as tests
performed at the Contractor’s laboratory.

Results for both in-plant and core testing shall include name of street where sample
was taken (if appropriate), date when sample was taken, sublot number, aggregate
max stone size, mix design used, and station and offset (if appropriate). Result
information shall include percent binder content, percent compaction, gradation test,
and an image of the core with a measurement of thickness. Final results shall be
clearly marked. Results shall be compared to approved mix designs and
specifications. A column clearly indicating passing or failing results shall be
provided.

Test results shall be provided to the City within 5 calendar days from asphalt pickup.
Results received after 5 calendar days will not be accepted.

Testing and inspections shall be performed by qualified technicians and shall be in
accordance with the relevant provisions of the latest version of the NHDOT standard
specifications.

The tables listed below are attached and list the street. Streets are subject to change
and contract will be adjusted accordingly.

e® Table 1: 2019 Paving Program — Arterial Roadways Paving List
© Table 2: 2019 Paving Program — Local Roadways Paving List

Payment for testing will be per each (Ea) and shall include all materials, labor, and
equipment necessary to complete that portion of the bid schedule. One payment will
be made for each gradation, binder content, bulk density, and theoretical maximum
density test result received within the specified time frame in the format approved by
the Engineer.

In-Plant Testing Technician Certification/Qualification:

The technician performing the HMA sampling and testing is required to have a
“NETTCP HMA Plant Technician. The technician will obtain samples at the plant at
a frequency of | test per 750 tons. Plant samples will be used to perform gradation &
asphalt content test (AASHTO T1130 & T164). In addition the technician will

Scope of Services Page 2 of 3 January 2019

Page Image
Finance Committee - Agenda - 3/20/2019 - P74

Finance Committee - Agenda - 3/20/2019 - P75

By dnadmin on Mon, 11/07/2022 - 13:08
Document Date
Wed, 03/20/2019 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/20/2019 - 00:00
Page Number
75
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__032020…

periodically observe HMA batching process and monitor the portions of materials in
the HMA mixture and compare the results to the approved job mix formula.

The qualifications of the technicians assigned to the contract shall be submitted for
approval and the City reserves the right to disapprove individual technicians.

Asphalt Pickup:

Asphalt pick up shall include all materials, labor, equipment, and transportation
necessary to pick up asphalt samples and transport them back to the lab for testing.
Samples will include loose asphalt and 6” cores. The pickup location will be at 9
Riverside St, Nashua, NH 03062. Samples will be picked up no later than 24 hours
after the request to pick them up and shall be delivered to the lab for testing within 24
hours of pickup.

The individual picking up the samples will be required to sign a document certifying
they were received. Any samples lost or damaged will be retaken by the testing
agency at no cost to the City.

Payment for asphalt pickup will be per each (Ea) and include all materials, labor,
equipment, and transportation necessary to complete that portion of the bid schedule.

Invoicing:

Contractor shall submit an invoice once per month. Invoices must include an
accounting of all bid form items being billed for that month as well as a running total
of all items billed in previous months. Items in the invoice that are not on the bid
form will not be paid. The testing agency shall submit sample invoice form for review
by the Engineer two weeks after the Preconstruction Meeting. For more details,
please refer general conditions.

Scope of Services Page 3 of 3 January 2019

Page Image
Finance Committee - Agenda - 3/20/2019 - P75

Finance Committee - Agenda - 3/20/2019 - P76

By dnadmin on Mon, 11/07/2022 - 13:08
Document Date
Wed, 03/20/2019 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/20/2019 - 00:00
Page Number
76
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__032020…

Allds Street
Amherst Street-1
Amherst Street-2
Amherst Street-3
Canal Street-1
Canal Street-2
Canal Strect-3
Hollis Street
East Hollis Street
East Hollis Street-2
East Hollis Street-3
East Hollis Street-4
East Hollis Street-5
Street-1
Street-2
Lake Street-2
Lake Street-3
Lake Street-4
Lake Street-5
Main Dunstable Road 2
Main Dunstable Road 3A
in Dunstable Road 3A (SB
in Dunstable Road 4
Dunstable Road 5
Hill Road-1
it Brook Road-1
it Brook Road-2
it Brook Road-3
it Brook Road-4
West Hollis St - 2B
West Hollis St -

Table: 2019 PAVING LIST (Asphalt testing Locations)

Main St
Somerset
Deerwood Dr
400'S of Cellu
Main St
St
Howard Ct
East Hollis
Bridge Street WB
Marshall St
Allds St
T le St
East Hollis EB
Main Dunstable Rd
Ritter St
Almont St
Linwood St
Pine St
Vine St
FE Everett T
West Hollis St
West Hollis St
Conant Rd
Rd
Indian Rock Rd
EB Tara Blvd
WB Tara Blvd
Newcastle Dr
175'E of Whitegate
Simon St
100'S of Marina St

East Hollis St
Deerwood Dr
400'S of Cellu
City Line
St
Howard Ct
St
Bridge St EB
E. Hollis
Allds St
Temple St
East Hollis EB
Crown St
Ritter St
Hanover St
Linwood St
Pine St
Vine St
Main St
Kinsley St
le Rd 3B(548'S of West H
le Rd 3B(548'S of West
Main Dunstable Rd 3B
Whitford Rd
Blue Hill Ave
Newcastle Dr
Newcastle Dr
175'E of Whit
D.W. Hi

Dead End (House #385

ollis Town Line
LENGTH

5,084
4,129
3,063
980
452
890
1,893
460
702
1,143
802
841
896
5,363
527
597
1,835
915
1,401
1,433
716
548
3,042
6,168
6,460
1,295
1,293
1,042
668
1,143
4,243
11.76

4,388 5.85
4,338 5.78
3,214 4.29
3,113 4.15
311 0.41
829 L.1l
1,837 2.45
212 1.00
427 0.57
1,067 1.42
416 0.56
794 1.06
249 0.33
4,510 6.01
450 0.60
423 0.56
1,384 1.84
664 0.88
728 0.97
502 0.67
307 0.41
275 0.37
3,077 4.10
4,108 5.48
7,045 9.39
989 1.32
1,053 1.40
1,471 1.96
523 0.70
934 1.24
1,988 2.65
51,623.39
No. of Cores needed=

Assume 100 cores are needed

6.00
6.00
5.00
5.00
1.00
2.00
3.00
1.00
1.00
2.00
1,00
2.00
1.00
7.00
1.00
1.00
2.00
1.00
1.00
1.00
1.00
1.00
5.00
6.00
10.00
2.00
2.00
2.00
1.00
2.00
3.00

85

Page Image
Finance Committee - Agenda - 3/20/2019 - P76

Finance Committee - Agenda - 3/20/2019 - P77

By dnadmin on Mon, 11/07/2022 - 13:08
Document Date
Wed, 03/20/2019 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/20/2019 - 00:00
Page Number
77
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__032020…

item No Estimated
ee Quantity
A 160

c 1.20
Dw
E 40

City of Nashua, New Hampshire
Division of Public Warks
IFB0265-022019
Schedule of Values - 2019 Asphalt Testing

Units item Description Unit Price in Total Price in figures
figures
EA Gradation Test (1 test at plant/750 tons}
Zero Dollars and
ZeroCents $ 0.00 $ 0.00
EA Binder/Asphalt Content Test (1 test at plant/750 tons)
zero Dollars and
ZeroCents $ 0.00 § 0,00
Bulk Density Test (Cores will be collected by Paving Contractor;
EA During Plant inspection)
Zero Dallars and
Zero Cents $ 0.00 s 0.00
Theoretical Maximum Density Test (Cores will be collected by
EA Paving Contractor; During Plant Inspection] Zero
Dollars and
Zero Cents 5 0.00 5 0.00
Bulk Density Test (Cores will be callected by Paving
EA Contractor; At Contractor's Lab)
Twenty Five Dollars and
Zero Cents $ 25,00 S 1,000.00
Theoretical Maximum Density Test (Cores will be collected by
EA Paving Contractor; At Contractor's Lab)
Ninety Five Dollars and
Zero Cents $ 95.00 S 3,800.00
EA Asphalt Pickup (from DPW Office}
Fifty Dollars and
ZeroCents $ 50.00 § 2,000.00
HMA Plant Technician for plant inspection & testing (indude
Hrs mileage}
Sixty Five Dollars and
ZeroCents § 70.00 s 41,300.00
Lump Sum Project Manager Oversight
Dollars and
ZeroCents $ 500.00 5 500.00
TOTAL BID PRICE FIGURES § 48,600

Forty Eight Thousand Six Hundred dollars and

zero cents

F 40
G 4
H 590
I 1
TOTAL OF BID ITEMS
{words}
Contractar:

5. W. Cole Engineering, inc,

Authorized Signature: Li Ltf

February 20, 2019

Date:

Address:

Email:

13 Delta Drive #8, Londonderry, New Hampshire 03053

amichaud@sweole.com

Page 1 of 4

Page Image
Finance Committee - Agenda - 3/20/2019 - P77

Finance Committee - Agenda - 3/20/2019 - P78

By dnadmin on Mon, 11/07/2022 - 13:08
Document Date
Wed, 03/20/2019 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/20/2019 - 00:00
Page Number
78
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__032020…

®) THE CITY OF NASHUA Tie Gate On

Financtal Services

Purchasing Department

March 14, 2019
Memo #19-135

TO: MAYOR DONCHESS
FINANCE COMMITTEE

SUBJECT: WET WEATHER FACILITY SCREENING UPGRADE — DESIGN AND BIDDING PHASE
(VALUE: NOT-TO-EXCEED $178,000)
DEPARTMENT: 169 WASTEWATER; FUND: WASTEWATER

Please see the attached communication from David L. Boucher, Superintendent Wastewater Department
dated February 28, 2019 for the information related to this contract.

§ 5-83. Professional services. In the purchase of accounting, architectural, auditing, engineering, legal,
medical and ambulance services and purchases of independent professional consultant services for
personnel, data processing, actuarial, planning, management and other comparable purchases
competitive bidding shall not be required. Competitive bidding is required in the procurement of insurance
agents and consultants.

This funding is contingent upon the approval of bonds for these funds.
The Superintendent Wastewater Department, the Board of Public Works (February 28, 2019 meeting)

and the Purchasing Department recommend the award of this contract in an amount not to exceed
$178,000 from Wright Pierce of Portsmouth, NH.

Re cy,

Dan Kooken
Purchasing Manager

Cc: D Boucher L Fautuex

229 Main Street e Nashua, New Hampshire 03061 ¢ Phone (603) 589-3330 e Fax (603) 589-3233 |

Page Image
Finance Committee - Agenda - 3/20/2019 - P78

Finance Committee - Agenda - 7/20/2022 - P32

By dnadmin on Sun, 11/06/2022 - 21:46
Document Date
Fri, 07/15/2022 - 12:19
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 07/20/2022 - 00:00
Page Number
32
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__072020…

CLIENT RESPONSIBILITIES

Final Engineering Design Proposal 05-11-22

4920

Owner/Contractor contract documents (except technical documents) and/or
purchase order, in order to solicit for and enter into a construction contract with a
Contractor or Construction Manager.

Solicit, administer, and award bids for construction implementation of this project.

Provide construction administration and supervisions of Contractor or Construction
Manager.

Obtain federal, state, and local permits and approvals necessary for the
implementation of this work.

Pay permit fee(s} for the new boring plan State Wetlands Permit or any other permit
fees that may be required.

Issues dealing with hazardous materials.

TURNER

GROUP

Page Image
Finance Committee - Agenda - 7/20/2022 - P32

Finance Committee - Agenda - 3/20/2019 - P79

By dnadmin on Mon, 11/07/2022 - 13:08
Document Date
Wed, 03/20/2019 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/20/2019 - 00:00
Page Number
79
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__032020…

To:

From:

Re:

B. Motion:

Attachments:

Discussion:

City of Nashua, Public Works Division

Board of Public Works Meeting Date: February 28, 2019

David L. Boucher, Superintendent
Wastewater Department

Wet Weather Facility Screening Upgrade — Design and Bidding Phase

To approve the contract with Wright Pierce for professional design and bidding
phase services for the Wet Weather Facility Screening Upgrade in an amount
not to exceed $178,000. Funding will be through: Department: 169 -
Wastewater; Fund: Wastewater; Activity: Wet Weather Upgrade.

Wright Pierce Proposal

The Wet Weather Facility located at 2 Sawmill Road in Nashua is designed to
treat flows at the wastewater facility above 50 million gallons per day. Over
the years, the facility has experience issues with its two influent screens. Parts
of the screen fields have become bowed allowing large material to pass
through and clog pumps within the Wet Weather Facility. Another issue is that
the rake mechanisms do not remove debris properly from the screen field
allowing flow to back-up into the interceptor creating other issues and causing
the Wet Weather Facility to be ineffective. Several interim solutions have
been tried to correct the issues with little success.

Wright Pierce was hired to do a preliminary investigation of the Wet Weather
screening area and determined new screens are needed. We are ready to
proceed with the design phase of this project and have asked Wright Pierce to
continue with this effort.

Wright Pierce has done a number of projects at the wastewater facility since
2012 in a satisfactory manner. There cost of $178,000 is reasonable for the
scope of work involved. The construction cost to upgrade the screens will be
determined by Wright Pierce, but are estimated to cost around 2.2 million
dollars. Their cost is less than 10% of the estimated construction cost; which is
very reasonable for design and bidding services.

Page Image
Finance Committee - Agenda - 3/20/2019 - P79

Finance Committee - Agenda - 3/20/2019 - P80

By dnadmin on Mon, 11/07/2022 - 13:08
Document Date
Wed, 03/20/2019 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/20/2019 - 00:00
Page Number
80
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__032020…

R-19-117

RESOLUTION

CHANGING THE USE OF FUNDS FOR A WASTEWATER FUND CAPITAL
IMPROVEMENTS PROJECT FROM BRIDGE STREET OVERFLOW DETENTION
BASIN IMPROVEMENTS TO WET WEATHER FACILITY SCREEN AND RAKE
UPGRADES

CITY OF NASHUA

In the Year Two Thousand and Nineteen

WHEREAS, the City of Nashua’s FY 2014 budget included a Wastewater Fund capital
improvement project entitled “Bridge Street Overflow Detention Basin Improvements” in an
FY14 amount of $890,000, and the City of Nashua’s FY 2015 budget included the same
Wastewater Fund capital improvement project in a FY15 amount of $1,700,000, thus authorizing
a total of $2,590,000 to be spent on this project; and

WHEREAS, this detention basin improvements project is not going to be done at this
time, and the Division of Public Works has an immediate need to start work on a different
Wastewater Fund capital improvement project.

NOW, THEREFORE, BE IT RESOLVED by the Board of Aldermen of the City of
Nashua that $2,000,000 of the amount previously approved for Wastewater Fund capital
improvement project “Bridge Street Overflow Detention Basin Improvements” is instead
approved to be used for the “Wet Weather Facility Screen and Rake Upgrades” project.

Page Image
Finance Committee - Agenda - 3/20/2019 - P80

Finance Committee - Agenda - 3/20/2019 - P81

By dnadmin on Mon, 11/07/2022 - 13:08
Document Date
Wed, 03/20/2019 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/20/2019 - 00:00
Page Number
81
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__032020…

LEGISLATIVE YEAR 2019
RESOLUTION: R-19-117

PURPOSE: Changing the use of funds for a wastewater capital
improvement project from Bridge Street Overflow Detention
Basin Improvements to Wet Weather Facility Screen and Rake

Upgrades
ENDORSERS: Mayor Jim Donchess
COMMITTEE
ASSIGNMENT:
FISCAL NOTE: None.
ANALYSIS

This resolution changes the use of previously approved (FY2014 and FY201 5) Wastewater Fund
Capital Improvement Project funds in the amount of $2,000,000 from Bridge Street Overflow
Detention Basin Improvements to Wet Weather Facility Screen and Rake Upgrades.

The Wastewater “Screen and Rake Upgrades” project is in the FY2020 Capital Improvements
Program.

This legislation should be referred to the Board of Public Works for review and approval.

Approved as to account Financial Services D ivision
structure, numbers, [ERLE "Uf
and amount: By:
Approved as to form: » fea ounsel
By: Vy, Ler th
Date: 65 aah dn FO LY

Page Image
Finance Committee - Agenda - 3/20/2019 - P81

Finance Committee - Agenda - 3/20/2019 - P82

By dnadmin on Mon, 11/07/2022 - 13:08
Document Date
Wed, 03/20/2019 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/20/2019 - 00:00
Page Number
82
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__032020…

CONTRACT FOR PROFESSIONAL SERVICES

WET WEATHER FACILITY SCREENING UPGRADE
DESIGN AND BIDDING PHASE

A CONTRACT BETWEEN

THE CITY OF NASHUA, 229 MAIN STREET, CITY HALL, NASHUA, NH 03060
AND

WRIGHT-PIERCE
and its successors, transferees and assignees (together “Professional Engineer”)
NAME AND TITLE OF PROFESSIONAL ENGINEER

230 COMMERCIAL WAY, SUITE 302, PORTSMOUTH, NH 03801
ADDRESS OF PROFESSIONAL ENGINEER

WHEREAS, the City of Nashua, a political subdivision of the State of New Hampshire, from time
to time requires the services of a Professional Engineer ; and

WHEREAS, it is deemed that the services of a Professional Engineer herein specified are both
necessary and desirable and in the best interests of the City of Nashua; and

WHEREAS, Professional Engineer represents they are duly qualified, equipped, staffed, ready,
willing and able to perform and render the services hereinafter described;

Now, THEREFORE, in consideration of the agreements herein made, the parties mutually agree as
follows:

1. DOCUMENTS INCORPORATED. The following exhibits are by this reference incorporated herein and
are made part of this contract:

Exhibit A--General Conditions for Contracts
Exhibit B--Scope of Services, Contract Time, Fee Schedule

The Contract represents the entire and integrated agreement between the parties and supersedes prior
negotiations, proposals, representations or agreements, either written or oral. Any other documents which
are not listed in this Article are not part of the Contract.

In the event of a conflict between the terms of the Proposal and the terms of this Agreement, a written
change order and/or fully executed City of Nashua Purchase Order, the terms of this Agreement, the
written change order or the fully executed City of Nashua Purchase Order shall control over the terms of
the Proposal.

2. WORK TO BE PERFORMED Except as otherwise provided in this contract, Professional Engineer shall

furnish all services, equipment, and materials and shall perform all operations necessary and required to
carry out and perform in accordance with the terms and conditions of the contract the work described,

AG 1 of 3

Page Image
Finance Committee - Agenda - 3/20/2019 - P82

Pagination

  • First page « First
  • Previous page ‹‹
  • …
  • Page 1901
  • Page 1902
  • Page 1903
  • Page 1904
  • Current page 1905
  • Page 1906
  • Page 1907
  • Page 1908
  • Page 1909
  • …
  • Next page ››
  • Last page Last »

Search

Meeting Date
Document Date

Footer menu

  • Contact