Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Search

Search

Displaying 13841 - 13850 of 38765

Board Of Aldermen - Agenda - 3/23/2021 - P178

By dnadmin on Mon, 11/07/2022 - 07:05
Document Date
Fri, 03/19/2021 - 15:55
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 03/23/2021 - 00:00
Page Number
178
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__032320…

24.

25.

26.

27.

28.

Failure to promptly restore existing property and structures including, but not limited to
driveways and lawns, may result in the ENGINEER’s determination that associated work
is not complete and therefore not eligible for progress payment. Such associated work
may include, but not be limited to paving, pipe installation, catch basins, manholes and
curbing.

Unless specifically agreed to in advance, driveway tie-ins will be paved concurrent with
top course paving operations.

In no circumstances shall driveway tie-ins not be completed within two weeks of the
adjacent top course paving.

PERATI ITH REFUSE PICKUP
The CONTRACTOR shall determine the schedule for trash pickup by contacting the City
of Nashua’s Solid Waste Department. The CONTRACTOR shall cooperate and make
arrangements to insure that trash pickup is not delayed or obstructed in any way. This
may involve the CONTRACTOR bringing trash barrels to the front or backside of the
work area for pickup by the Solid Waste Department and then returning the barrels back
to each house.

PERATI ITH ALITY A RANCE
A minimum of one core per street shall be taken. Cores shall be cut and delivered to
the City within 24 hours of pavement placement. Core locations will be selected
randomly by the ENGINEER. Failure to cut and deliver cores may result in delay of
progress payments for pavement.

PROPERTY I RANCE
Property insurance is referenced in the General Conditions (Article 5.05).

Property insurance is not required for this contract.

ACCESS TO PRODUCTION FACILITIES

The City of Nashua may choose to have inspection and testing performed at the asphalt
plant. All relevant provisions of the Standard Specifications, including but not limited
to Section 3.1.6 Access to Production Facilities — General, shall apply.

ADA MPLIANCE

A. Sidewalk curb ramps shall be constructed in compliance with ADA requirements as
well as NHDOT Standard Details. The NHDOT Standard Details are available at:
https://www.nh.gov/dot/org/projectdevelopment/highwaydesign/detailsheet…
ts/crb_ramp_1 9.pdf

B. The CONTRACTOR shall take measurements as needed before work commences at
each ramp location to assure that the CONTRACTOR has all control needed to
construct sidewalk improvements in compliance with ADA requirements.

C. The ENGINEER will meet with the CONTRACTOR in advance of work at each
ramp location to assure concurrence on the limits and extent of work needed to
achieve ADA compliance.

SC - 8 of 9

Page Image
Board Of Aldermen - Agenda - 3/23/2021 - P178

Board Of Aldermen - Agenda - 3/23/2021 - P179

By dnadmin on Mon, 11/07/2022 - 07:05
Document Date
Fri, 03/19/2021 - 15:55
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 03/23/2021 - 00:00
Page Number
179
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__032320…

29.

30.

D. If in the opinion of the CONTRACTOR, construction of an ADA compliant ramp is
not possible at any location the CONTRACTOR shall notify the ENGINEER in
writing in advance of any construction activities at that location. Unless notification
of any such concerns is made to the ENGINEER, CONTRACTOR shall be singularly
responsible for the ADA compliance of the finished work.

E. During construction the CONTRACTOR must maintain pedestrian detours and
provide an ADA compliant fillet at each ramp location until final paving is complete.

PUBLIC CLAIMS

All claims received by the City or the CONTRACTOR from the public shall be
documented using the Claim Tracking Form (see Division 8) in the contract. The
CONTRACTOR shall respond to the claimant within 7 calendar days of receiving the
claim and within 7 calendar days after each follow up correspondence. A logbook of claim
forms shall be kept by the CONTRACTOR and made available to the ENGINEER at any
time. The CONTRACTOR shall notify the ENGINEER when a claim has come to a
resolution.

Failure to promptly respond to claims may result in progress payments being withheld.

CONTRACTED ENGINEER

The City's contracted engineer for this project is Hayner/Swanson, Inc. The contracted
engineer shall act on the City's behalf in fulfilling duties of the ENGINEER as delegated
by the DPW Engineering Department, and shall have full authority to act as the
ENGINEER while serving in that capacity. The City reserves the right to terminate
contracted engineering support or change its contracted engineer at its sole discretion
without advanced notice or approval of the CONTRACTOR.

SC - 9 of 9

Page Image
Board Of Aldermen - Agenda - 3/23/2021 - P179

Board Of Aldermen - Agenda - 3/23/2021 - P180

By dnadmin on Mon, 11/07/2022 - 07:05
Document Date
Fri, 03/19/2021 - 15:55
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 03/23/2021 - 00:00
Page Number
180
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__032320…

DIVISION 7

LIST AND MAP OF ROADWAYS

Page Image
Board Of Aldermen - Agenda - 3/23/2021 - P180

Board Of Aldermen - Agenda - 3/23/2021 - P181

By dnadmin on Mon, 11/07/2022 - 07:05
Document Date
Fri, 03/19/2021 - 15:55
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 03/23/2021 - 00:00
Page Number
181
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__032320…

City of Nashua, New Hampshire
Division of Public Works

IFB0O660-0211 21

2021 Paving Program - Residential Roadways

Roadway
Street Name From To Treatment
CHARLOTTE AVE - 1 CHARLOTTE ST MEADE ST 1.5" M&O
CHARLOTTE AVE - 2 MEADE ST MANCHESTER ST 1.5" M&O
CLEVELAND ST-1 LUND ST ALMONT ST 1.5" M&O
CLEVELAND ST-2 ALMONT ST FAIRVIEW AVE 1.5" M&O
BADGER ST WEST HOLLIS ST KINSLEY ST 2" M&O
BISHOP LN GREENWOOD DR NORTHEASTERN BLVD 2" M&O
BITIRNAS ST NORTH INTERVALE ST TAMPA ST 2" M&O
BLAINE ST ALMONT ST LINWOOD ST 2" M&O
BOXWOOD CT CIDER LN CUL-DE-SAC 2" M&O
BRIARWOOD DR WHEATON DR SHERWOOD DR 2" M&O
BULOVA DR S. MAIN ST ELGIN ST 2" M&O
BUTTERNUT DR CIDER LN CUL-DE-SAC 2" M&O
CALDWELL RD LAKE ST LUND RD 2" M&O
CELESTE ST CARON AVE DEAD END 2" M&O
CHAUTAUQUA AVE BROAD ST DEAD END 2" M&O
CHESTNUT ST KINSLEY ST LAKE ST 2" M&O
CIDER LN HAMPTON DR (N) HAMPTON DR (8) 2" M&O
CINDY DR McKENNA DR CUL-DE-SAC 2" M&O
CLAIRMOOR DR S. MAIN ST APPLESIDE DR 2" M&O
COLUMBINE DR BRIARWOOD DR JUNIPER LN 2" M&O
DAYTONA ST INTERVALE ST TAMPA ST 2" M&O
DICKERMAN ST MAIN ST FIFIELD ST 2" M&O
DONCASTER DR HUNTINGDON LN HARRIS RD 2" M&O
DUDLEY ST JUNE ST DEAD END 2" M&O
ELGIN ST WALTHAM DR LINTON ST 2" M&O
ESSEX ST AMHERST ST PINE HILL AVE 2" M&O
FRANCONIA DR BRIARWOOD DR DUBLIN AVE 2" M&O
FROST DR HAMPTON DR COBURN AVE 2" M&O
GAFFNEY ST WEST HOLLIS ST NEW DUNSTABLE RD 2" M&O
GLENDALE DR ROYAL OAK DR DEAD END 2" M&O
HAMPTON DR COBURN AVE CUL-DE-SAC 2" M&O
HASTINGS LN WATSON ST COX ST 2" M&O
HEMLOCK CT CIDER LN CUL-DE-SAC 2" M&O
HERRICK ST EAST DUNSTABLE RD ROBINSON RD 2" M&O
HINSDALE AVE CYPRESS LN LACONIA AVE 2" M&O
HOOKER ST BEAUVIEW AVE CHARLOTTE AVE 2" M&O
HOPI DR KANATA DR INCA DR 2" M&O
HUNTINGDON LN NIGHTINGALE RD FRIAR TUCK LN 2" M&O
JINCA DR KANATA DR CHEYENNE DR 2" M&O
JAKE DR CHAPEL HILL DR CUL-DE-SAC 2" M&O
JEFFERSON ST CROSS ST CHANDLER ST 2" M&O
KANATA DR SANBORN DR CHEYENNE DR 2" M&O
KITTERY DR CAMBRIDGE RD YARMOUTH DR 2" M&O
LACONIA AVE CYPRESS LN CUL-DE-SAC 2" M&O
LEE ST FOREST ST MANCHESTER ST 2" M&O
LUND ST LAKE ST NOWELL ST 2" M&O
|MAPLE LEAF DR PINEHURST AVE BRYANT RD 2" M&O
[MEADE ST COX ST CHARLOTTE AVE 2" M&O
[MIAMI ST INTERVALE ST TAMPA ST 2" M&O
[MONTGOMERY AVE-1 MAIN ST DRIVEWAY #13 2" M&O
[MOUNT VERNON ST AMHERST ST TROY ST 2" M&O
NATHAN CT BRINTON DR CUL-DE-SAC 2" M&O
NORFOLK ST AMHERST ST TROY ST 2" M&O
PASADENA AVE AMHERST ST PINE HILL AVE 2" M&O
PATTEN CT LEDGE ST DEAD END 2" M&O
PEACH DR WALTHAM DR DEAD END 2" M&O
RESURRECTION CIR PARRISH HILL DR CUL-DE-SAC 2" M&O
SHERMAN ST EDITH AVE CHARLOTTE AVE 2" M&O
SHERRI ANN AVE WATSON ST CUL-DE-SAC 2" M&O
SHERWOOD DR FRANCONA DR DEAD END 2" M&O
SPRUCEWOOD AVE PINEHURST AVE MAPLELEAF DR 2" M&O
SUDBURY DR PALISADE DR (W) PALISADE DR (E) 2" M&O
SUNAPEE ST AMHERST ST (WB) CUL-DE-SAC 2" M&O
SWART TERR SWART ST SWART ST 2" M&O
SYCAMORE LN FRANCONA DR WHEATON DR 2" M&O
TAMPA ST BITIRNAS ST INTERVALE ST 2" M&O
W. PEARL MAIN ST WALNUT ST 2" M&O

Page Image
Board Of Aldermen - Agenda - 3/23/2021 - P181

Board Of Aldermen - Agenda - 3/23/2021 - P182

By dnadmin on Mon, 11/07/2022 - 07:05
Document Date
Fri, 03/19/2021 - 15:55
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 03/23/2021 - 00:00
Page Number
182
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__032320…

City of Nashua, New Hampshire
Division of Public Works
IFB0660-021121
2021 Paving Program - Residential Roadways

ACADEMY DR CONCORD ST CUL-DE-SAC RECLAIM
BARKER AVE KING ST BURKE ST RECLAIM
BENSON AVE BURKE ST SPALDING ST RECLAIM
BLACKFOOT DR MASSASOIT RD DEAD END RECLAIM
BROADCREST LN BROAD ST CUL-DE-SAC RECLAIM
BURNS ST INTERVALE ST TAMPA ST RECLAIM
CHARLTON CIR LYNN ST CUL-DE-SAC RECLAIM
CLERGY CIR LUTHERAN DR CUL-DE-SAC RECLAIM
DURHAM ST LUTHERAN DR DOVER ST RECLAIM
EAST GLENWOOD ST MAIN ST ASPHALT CHANGE RECLAIM
FACTORY ST CHESTNUT STREET MAIN STREET RECLAIM
FRENCH ST MERRIMACK ST MANCHESTER ST RECLAIM
FULTON ST LAKE ST DEAD END RECLAIM
JACKSON AVE CANAL ST DEAD END RECLAIM
[MAJOR DR BURKE ST BURKE ST RECLAIM
[MARQUIS AVE LOVELL ST DEAD END RECLAIM
|MAYWooD DR HILLSFERRY RD GLENDALE RD RECLAIM
[MILAN ST NEWFIELDS ST CUL-DE-SAC RECLAIM
|MILLBROOK DR WHITE PLAINS DR VALHALLA DR RECLAIM
[MONTGOMERY AVE-2 DRIVEWAY #13 FIFIELD ST RECLAIM
|MORNINGSIDE DR DICKERMAN ST TAFT ST RECLAIM
|MOUNT PLEASANT ST ABBOTT ST MANCHESTER ST RECLAIM
NIQUETTE DR EAST DUNSTABLE RD (N) EAST DUNSTABLE RD (S) RECLAIM
RITA ST ALLDS ST THOMAS ST RECLAIM
SAXON LN GREENWOOD DR NORTHEASTERN BLVD RECLAIM
TODD RD CATALINA LN GATE RECLAIM
TOPSFIELD DR CAMBRIDGE RD YARMOUTH DR RECLAIM
UNDERHILL ST ARLINGTON ST CUL-DE-SAC RECLAIM
UPSTONE DR BROAD ST CARMINE RD RECLAIM

Page Image
Board Of Aldermen - Agenda - 3/23/2021 - P182

Board Of Aldermen - Agenda - 3/23/2021 - P183

By dnadmin on Mon, 11/07/2022 - 07:05
Document Date
Fri, 03/19/2021 - 15:55
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 03/23/2021 - 00:00
Page Number
183
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__032320…

@ONashua

January 12, 2021

ares, So
wot me aan

eae Bien met G
waza wo : ; ©
pals 6 « 1 ft Ss
a * 1 : y
& \ ‘ I c
: S F 5
= i ‘, ! UO
Z ‘ a cc
vam nee eee i Cw
i al
I __
o :
aeae fA 1
i es Prt del .
‘ ae 4 ye de :
oo y Jeee rel oes $ i
iY ‘ i
—_ g
ee Ss 6
p s
f &
! °
is oc
fe ! _
_ 2 ‘ o
2 9 *, ~_
24 = 7 5
é ’ i 3
i ! o
i 1 oc
R f ;
5 :
/ 1 !
i y eat i
om cae, | i
[ae \ :
ma Ne 1 eta
i nas

t 0 8001,600 3,200 Feet

Rieaaeenoraare stan! Hansa baal aR PRAT ARE

The City of Nashua

Source: Nashua DPW, esri

Ward 7
Ward 8
Ward 9

Ward 4

Ward 5
Ward 6

Ward 1
Ward 2
Ward 3

Residential Roadways

to be Paved
Existing Roadway

Page Image
Board Of Aldermen - Agenda - 3/23/2021 - P183

Board Of Aldermen - Agenda - 3/23/2021 - P184

By dnadmin on Mon, 11/07/2022 - 07:05
Document Date
Fri, 03/19/2021 - 15:55
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 03/23/2021 - 00:00
Page Number
184
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__032320…

LIST OF EXHIBITS

NOTICE OF AWARD

NOTICE TO PROCEED

CHANGE ORDER

CLAIM TRACKING FORM

CERTIFICATE OF SUBSTANTIAL COMPLETION
CERTIFICATE OF FINAL COMPLETION

CONTRACTOR'S FINAL RELEASE AND WAIVER OF LIEN

QB OnS

DIVISION 8

EXHIBITS

Page Image
Board Of Aldermen - Agenda - 3/23/2021 - P184

Board Of Aldermen - Agenda - 3/23/2021 - P185

By dnadmin on Mon, 11/07/2022 - 07:05
Document Date
Fri, 03/19/2021 - 15:55
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 03/23/2021 - 00:00
Page Number
185
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__032320…

NOTICE OF AWARD

DATED:

CONTRACTOR: Sunshine Paving Corporation ADDRESS: 29 Constitution Drive
Hudson, NH 03051

OWNER: City of Nashua, New Hampshire ADDRESS: 229 Main Street
Nashua, NH 03060

PROJECT: 2021 Paving Program OWNER’S IFBO660-021121
Residential Roadways CONTRACT NO.
TO CONTRACTOR:
You are notified that your Bid dated for the above Contract has been considered. You

are the apparent Successful Bidder and have been awarded a contract for

(Indicate total Work, alternatives or sections or Work awarded)
The Contract Price of your contract is
DOLLARS
($ )

The proposed Agreement that the OWNER expects to execute, accompanies this Notice of Award.

1. You must deliver to the OWNER a fully executed counterpart of the proposed Agreement that
the OWNER expects to execute.

2. You must deliver to the OWNER the Contract Security (Bonds), as specified in the Contract
Agreement (Article 5).

(List other conditions precedents).

IFBO660-021121
2021 Paving Program NOTICE OF AWARD
Residential Roadways Page 1 of 2

Page Image
Board Of Aldermen - Agenda - 3/23/2021 - P185

Board Of Aldermen - Agenda - 3/23/2021 - P186

By dnadmin on Mon, 11/07/2022 - 07:05
Document Date
Fri, 03/19/2021 - 15:55
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 03/23/2021 - 00:00
Page Number
186
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__032320…

Failure to comply with these conditions within the time specified will entitle OWNER to consider your
bid in default, to annul this Notice of Award and to declare your Bid Security forfeited.

By

(FOR THE CITY OF NASHUA)

(TITLE)

ACKNOWLEDGEMENT OF NOTICE

Receipt of the above NOTICE OF AWARD is hereby acknowledged

By

The day of , 20

By

Title

IFBO660-021121
2021 Paving Program NOTICE OF AWARD

Residential Roadways Page 2 of 2

Page Image
Board Of Aldermen - Agenda - 3/23/2021 - P186

Board Of Aldermen - Agenda - 3/23/2021 - P187

By dnadmin on Mon, 11/07/2022 - 07:05
Document Date
Fri, 03/19/2021 - 15:55
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 03/23/2021 - 00:00
Page Number
187
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__032320…

NOTICE TO PROCEED

DATED:
. . . ADDRESS: 29 Continental Drive

CONTRACTOR: Sunshine Paving Corporation Hudson, NH 03051
OWNER: City of Nashua, ADDRESS: 229 Main Street

New Hampshire Nashua, NH 03060
PROJECT: 2021 Paving Program OWNER’S CONTRACT NO. IFBO660-021121

Residential Roadways

TO CONTRACTOR:

You are notified that the Contract Times under the above contract will commence to run on
,2021. By that date, you are to start performing your obligations under the
Contract Documents. In accordance with Article 3 of the Agreement, the date of Substantial Completion
is , 2021 and the date of Final Completion is , 2021.

Before starting any Work at the Site, Contractor must comply with the following:

Owner: City of Nashua

(Owner Representative Signature)
By:
Title:

IFBO660-021121

2021 Paving Program NOTICE TO PROCEED
Residential Roadways Page 1 of 2

Page Image
Board Of Aldermen - Agenda - 3/23/2021 - P187

Pagination

  • First page « First
  • Previous page ‹‹
  • …
  • Page 1381
  • Page 1382
  • Page 1383
  • Page 1384
  • Current page 1385
  • Page 1386
  • Page 1387
  • Page 1388
  • Page 1389
  • …
  • Next page ››
  • Last page Last »

Search

Meeting Date
Document Date

Footer menu

  • Contact