Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Search

Search

Displaying 10181 - 10190 of 38765

Finance Committee - Agenda - 6/7/2017 - P48

By dnadmin on Mon, 11/07/2022 - 10:22
Document Date
Wed, 06/07/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/07/2017 - 00:00
Page Number
48
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060720…

' Technical Specifications IFB0660-040617
2017 Pavement Preservation
Revised per Addendum #1

ITEM 618.6 - UNIFORMED OFFICERS

A. SCOPE

This work shall consist of furnishing uniformed officers, with or without vehicles, as required to
direct traffic through or around the Work as ordered by the Engineer.

B. MATERIALS AND CONSTRUCTION

The Contractor shall supply qualified uniformed officers as per the latest approved NHDOT
Standard Specifications for Road Construction. Uniformed officers shall only be used when the
Engineer has previously approved it. Daily coverage needs to be approved by the Engineer.

C. MEASUREMENT AND PAYMENT

Uniformed officers will be measured by the actual number of hours authorized, as determined by
the Engineer. This item has a budgeted allowance as shown on the Bid Form. Payments to
Contractor will be made based on approved hours and resulting dollar amounts on Police
Department invoices and only after contractor’s proof of payment to Police Department.

Contractor shall record the number of hours for each officer used. Hours shall be recorded on a
per street basis. Payment is contingent upon submittal of quantities in a per street format.

bo
to

Page Image
Finance Committee - Agenda - 6/7/2017 - P48

Finance Committee - Agenda - 6/7/2017 - P49

By dnadmin on Mon, 11/07/2022 - 10:22
Document Date
Wed, 06/07/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/07/2017 - 00:00
Page Number
49
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060720…

~ Technical Specifications IFB0660-040617
2017 Pavement Preservation
Revised per Addendum #1

ITEM 618.7 - FLAGGERS
A. SCOPE

This work shall consist of furnishing qualified flaggers, as required to direct traffic through or
around the Work as ordered by the Engineer.

B. MATERIALS AND CONSTRUCTION

The Contractor shall supply qualified flaggers as per the latest approved NHDOT Standard
Specifications for Road and Bridge Construction. Daily coverage needs to be approved by the

Engineer.

C. MEASUREMENT AND PAYMENT

Flaggers will be measured by the actual number of hours authorized, as determined by the
Engineer. This item has a budgeted allowance as shown on the Bid Form. In no case shall the
gross hourly rate exceed $22/hour for straight time work, $33/hour for overtime work, and $44
dollars for double time work. Payments to Contractor will be made based on approved hours and
resulting dollar amounts. In the case of outsourced flagger services, payments to Contractor will
be made only after Contractor’s proof of payment to flagger company.

Contractor shall record the number of hours for each flagger used. Hours shall be recorded on a
per street basis. Payment is contingent upon submittal of quantities in a per street format.

Page Image
Finance Committee - Agenda - 6/7/2017 - P49

Finance Committee - Agenda - 6/7/2017 - P50

By dnadmin on Mon, 11/07/2022 - 10:22
Document Date
Wed, 06/07/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/07/2017 - 00:00
Page Number
50
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060720…

* Technical Specifications IFB0660-040617
2017 Pavement Preservation
Revised per Addendum #1

ITEM 619.1 - MAINTENANCE OF TRAFFIC
A. SCOPE

This work shall consist of providing and maintaining safe and passable traffic accommodations
for public traffic and furnishing, erecting and maintaining necessary traffic signs, barricades,
lights, signals, delineators, concrete barriers, signs, and other traffic control warning devices
through the work zone.

B. MATERIALS AND PERFORMANCE
General

The Contractor shall furnish all labor, materials, equipment and transportation necessary for the
required maintenance of traffic needs based on the Contractors daily operations in accordance
with the latest approved NHDOT Standard Specifications for Road and Bridge Construction, and
the latest approved MUTCD.

Signage

At a minimum, the Contractor’s crew shall, at all times carry the following to be used as the need
may arise:
2 ROAD WORK AHEAD (MUTCD W20-1)

2 ONE LANE ROAD AHEAD (MUTCD W20-4)
2 DIRECTIONAL ARROW SIGN (MUTCD WI1-6)
2 FLAGGER SIGN (MUTCD W20-7)

Contractor shall provide 2 variable message signs for use on major roads.

Permits:

Contractor shall be responsible for getting approved street opening permits, submitting traffic
control plans for all streets, obtaining lane closure or detour approval permits, and obtaining
emergency work permits.

Notification
All homeowners and businesses affected by the construction shall be notified a minimum of one
day in advance of the surfacing. This notification shall be in the form of a written or electronic

posting stating the times and dates that construction is expected on their road.

Contractor shall provide and post “‘No Parking” signs on streets one day before resurfacing.
Signs shall be removed by contractor within 5 working days after completion of work.

Page Image
Finance Committee - Agenda - 6/7/2017 - P50

Finance Committee - Agenda - 6/7/2017 - P51

By dnadmin on Mon, 11/07/2022 - 10:22
Document Date
Wed, 06/07/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/07/2017 - 00:00
Page Number
51
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060720…

* Technical Specifications IFB0660-040617
2017 Pavement Preservation
Revised per Addendum #1

The Contractor shall notify, by email, the Engineer, and the City Solid Waste Department
Contact of what work will conducted a where. Notifications shall be provided the day before
work commences, during regular business hours (8am-Spm).

Engineer: Solid Waste Department Contact:
Todd Welch Kevin Naro
WelchT@NashuaNH. gov NaroK @NashuaNH.gov

C. MEASUREMENT AND PAYMENT

Maintenance of traffic will be measured as a unit. Payment for maintenance of traffic shall be at
the contract lump sum, which lump sum includes full compensation for material, equipment and
labor to complete this portion of the Bid Schedule. The lump sum can only be amended by
written, approved change order. Payments towards the lump sum will be made periodically based
on the percent of the contract and the balance will be paid at final payment upon completion of
all project requirements. Should the contract be terminated prior to completion, or the contract
work not completed, total payment for this item shall be proportional to the percentage of the
contract completed.

25

Page Image
Finance Committee - Agenda - 6/7/2017 - P51

Finance Committee - Agenda - 6/7/2017 - P52

By dnadmin on Mon, 11/07/2022 - 10:22
Document Date
Wed, 06/07/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/07/2017 - 00:00
Page Number
52
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060720…

Technical Specifications IFB0660-040617
2017 Pavement Preservation
Revised per Addendum #1

ITEM 632 —- RETROREFLECTIVE PAVEMENT MARKINGS

A. SCOPE

This work shall consist of furnishing and placing white or yellow retroreflective paint pavement
markings and retroreflective thermoplastic pavement markings at locations shown on the plans or
as ordered by the Engineer.

B. MATERIALS AND CONSTRUCTION

The Contractor shall furnish all labor, materials, equipment and transportation necessary for the
required placement of retro reflective paint and thermoplastic pavement markings in accordance
with the latest approved NHDOT Standard Specifications for Road and Bridge Construction, and
the latest approved MUTCD. A layout drawing shall be approved by the Engineer prior to any
work being done to the street.

Application temperature requirements shall be strictly enforced. Material placed outside
temperature requirements will not be accepted.

Striping shall match existing striping and be replaced in kind or as directed by the Engineer.
Ali stop bars, crosswalks and symbols shall be retro reflective thermoplastic and all long lines
shall be retro reflective paint.

C. MEASUREMENT AND PAYMENT

632.0104 Retro reflective Paint Pavement Marking,

Single Solid Line, 4in. Linear Foot

632.3112 Retro reflective Thermoplastic Pavement Marking,
Single Solid Line, 12in. Linear Foot
- 632.32 Retro reflective Thermoplastic Symbol Square Foot

Payment shall be per the unit listed above. Symbols will be paid for at the square footage listed
below:

Turn Arrow = 17SF

Straight and Turn Arrow = 28.8 SF
Straight Arrow = 12.5 SF

Only = 22.3 SF

Bike Lane Symbol = 8.1 SF

Bike Lane Strait Arrow = 6.0 SF

Page Image
Finance Committee - Agenda - 6/7/2017 - P52

Finance Committee - Agenda - 6/7/2017 - P53

By dnadmin on Mon, 11/07/2022 - 10:22
Document Date
Wed, 06/07/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/07/2017 - 00:00
Page Number
53
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060720…

~ Technical Specifications IFB0660-040617
2017 Pavement Preservation
Revised per Addendum #1

Contractor shall record the liner feet and square feet of retroreflective pavement markings
placed. Quantities shall be recorded on a per street basis. Payment is contingent upon submittal
of quantities in a per street format.

ITEM 632.80 - TEMPORARY PAVEMENT MARKERS

A. SCOPE

This work shall consist of furnishing, placing, and removing temporary pavement markers
(TPMs) at locations shown on the plans or as ordered by the Engineer in accordance with the
latest approved NHDOT Standard Specifications for Road and Bridge Construction, and the
latest approved MUTCD.

B. MATERIALS AND CONSTRUCTION

The Contractor shall furnish all labor, materials, equipment and transportation necessary for the
required placement and removal of TPMs in accordance with the latest approved NHDOT
Standard Specifications for Road and Bridge Construction, and the latest approved MUTCD.

Channelizing Lines: TPMs used in channelizing line applications shall have white one-way retro
reflectors facing traffic.

Lane Lines: TPMs used in lane line applications shall have white one-way or white/red two-way
retro reflectors as specified, with white facing traffic.

Edge Lines: TPMs used in edge line applications shall have one-way reflectors facing traffic, and
which match the existing edge line color.

Center Lines: TPMs used in center line applications shall have yellow two-way reflectors.

C. MEASUREMENT AND PAYMENT

The quantity of temporary pavement markers to be paid for will be the actual number of
temporary pavement markers which have been satisfactorily installed and accepted by the
Engineer, and will be paid for at the contract unit price specified for each. Replacement of
temporary pavement markers that are damaged or removed shall be incidental to original
installation.

Contractor shall record the number of temporary markers installed. Quantities shall be recorded
on a per street basis. Payment is contingent upon submittal of quantities in a per street format.

27

Page Image
Finance Committee - Agenda - 6/7/2017 - P53

Finance Committee - Agenda - 6/7/2017 - P54

By dnadmin on Mon, 11/07/2022 - 10:22
Document Date
Wed, 06/07/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/07/2017 - 00:00
Page Number
54
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060720…

Technical Specifications IFB0660-040617
2017 Pavement Preservation
Revised per Addendum #1

ITEM 632.9 - OBLITERATE PAVEMENT MARKINGS

A. SCOPE

This work shall consist of removal of pavement lines and symbols at locations shown on the
plans or as ordered by the Engineer.

B. MATERIALS AND CONSTRUCTION

The Contractor shall furnish all labor, materials, equipment and transportation necessary for the
removal of retroreflective paint lines, retroreflective thermoplastic lines, and retroreflective
thermoplastic symbols in accordance with the latest approved NHDOT Standard Specifications
for Road and Bridge Construction.

Pavement marking shall be removed by grinding, sand or water blasting, or other methods
approved by the Engineer that result in minimum pavement scaring and damage to pavement
surface.

Disposal of all pavement markings shall be the responsibility of the Contractor in accordance
with all applicable federal, state, and local regulations.

C. MEASUREMENT AND PAYMENT

632.911 Obliterate Retroreflective Pavement Marking, Linear Foot
(Thermoplastic or Paint) 12” Wide & Under

632.912 Obliterate Retroreflective Pavement Marking Linear Foot
(Thermoplastic or Paint), Over 12” Wide

632.913 Obliterate Retroreflective Thermoplastic Symbol Square Foot

Payment shall be per the unit listed above. Symbols will be paid for at the square footage listed
below. No additional adjustments will be made for width:

Turn Arrow = 17SF

Straight and Turn Arrow = 28.8 SF
Straight Arrow = 12.5 SF

Only = 22.3 SF

Bike Lane Symbol = 8.1 SF

Bike Lane Strait Arrow = 6.0 SF

Contractor shall record the liner feet and square feet of retroreflective pavement markings
removed. Quantities shall be recorded on a per street basis. Payment is contingent upon submittal
of quantities in a per street format.

28

Page Image
Finance Committee - Agenda - 6/7/2017 - P54

Finance Committee - Agenda - 6/7/2017 - P55

By dnadmin on Mon, 11/07/2022 - 10:22
Document Date
Wed, 06/07/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/07/2017 - 00:00
Page Number
55
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060720…

Revised per Addendum #1

Contractor:

Item No.

203.112

304,112

403.11

403.12

404.11

405.11

604.4

604.45

604.46

618.6

Estimated

Quantity

1,620

633

143

360

27,380

11,259

14

20

10,760

STREETS
City of Nashua, New Hampshire
Division of Public Works
Bid Schedule
Item Description Unit Price Total Price
Units with Unit Bid Price in Words in figures in fiqures
SY Street Patch
Dollars and
Cents
SY Reclaim Stabilized Base Processed in
Place, 12" Deep (F)
Dollars and
Cents
TON Hot Bituminous Pavement, Machine Method
Dollars and
Cents
TON Hot Bituminous Pavement, Hand Method
Dollars and
Cents
SY Microsurfacing
Dollars and
Cents
GAL Crack Sealing
Dollars and
Cents
VF Repair of Existing Structures
Dollars and
Cents
EA Adjust to Grade Existing Casting
Dollars and
Cents
EA Replace Casting
Dollars and
Cents
Allowance Uniformed Officers
Dollars and
Cents $10,760.00

Page 1 of 2

Page Image
Finance Committee - Agenda - 6/7/2017 - P55

Finance Committee - Agenda - 4/6/2022 - P325

By dnadmin on Sun, 11/06/2022 - 21:44
Document Date
Fri, 04/01/2022 - 08:56
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 04/06/2022 - 00:00
Page Number
325
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__040620…

4.

Precast reinforced concrete sections shall be set vertical and with sections in true
alignment.

Butyl rubber joint sealant shall be installed between each concrete section. Catch basin
sections do not require joint sealant if so indicated on the drawings.

All holes in sections used for handling the sections shall be thoroughly plugged with mortar.

Mortar shall be one part cement to 1-1/2 parts sand, mixed slightly damp to the touch (just
short of "balling"), hammered into the holes until it is dense and an excess of paste appears
on the surface, and then finished smooth and flush with the adjoining surfaces.

B. BRICK WORK:

1.

Bricks shall be moistened by suitable means, as directed, until they are neither so dry as to
absorb water from the mortar nor so wet as to be slippery when laid.

Each brick shall be laid as a header in a full bed and joint of mortar without requiring
subsequent grouting, flushing or filling, and shall be thoroughly bonded as directed.

The brick inverts shall conform accurately to the size of the adjoining pipes. Side inverts
shall be curved and main inverts (where direction changes) shall be laid out in smooth curves
of the longest possible radius which is tangent to the centerlines of adjoining pipe.

C. CASTINGS:

1.

Cast iron frames, grates and covers shall be as specified. The frames and covers shall be
set by the Contractor to conform accurately to the grade of the finished pavement,
existing ground surface, or as indicated on the drawings. Frames shall be adjusted to meet
the street surface.

Cast iron manhole frames and covers not located in paved areas shall be set 6-inches above
finished grade, at a height as directed by the Engineer, or as indicated on the drawings. The
top of the cone shall be built up with a minimum of | course and a maximum of 5 courses
of brick and mortar used as headers for adjustment to final grade.

Frames shall be set concentric with the top of the concrete section and in a full bed of mortar
so that the space between the top of the concrete section or brick headers and the bottom
flange of the frame shall be completely filled and made watertight. A thick ring of mortar
extending to the outer edge of the concrete shall be placed all around the bottom flange.
The mortar shall be smoothly finished to be flush with the top of the flange and have a slight
slope to shed water away from the frame.

Covers and/or grates shall be left in place in the frames, for safety reasons, except while
work is being performed.

2022 Sewer Replacement Project Precast Manholes and Catch Basins

Nashua, NH

02631-6

Page Image
Finance Committee - Agenda - 4/6/2022 - P325

Finance Committee - Agenda - 6/7/2017 - P56

By dnadmin on Mon, 11/07/2022 - 10:22
Document Date
Wed, 06/07/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/07/2017 - 00:00
Page Number
56
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060720…

[es

s lew «4 peef *s oll
og duh rersga ath
Rous ly “ay

il 4a m3 vip 1 =+gu

amu of qe : = ol Tually

.
rie “ia —
» —— i
= _ ri
- ~
7 : -
I
_ - —_ a a =
i+
ss
A
*- I fi
=o
a
a |
=-_= es

i
J

Page Image
Finance Committee - Agenda - 6/7/2017 - P56

Pagination

  • First page « First
  • Previous page ‹‹
  • …
  • Page 1015
  • Page 1016
  • Page 1017
  • Page 1018
  • Current page 1019
  • Page 1020
  • Page 1021
  • Page 1022
  • Page 1023
  • …
  • Next page ››
  • Last page Last »

Search

Meeting Date
Document Date

Footer menu

  • Contact