Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Search

Search

Displaying 30781 - 30790 of 38765

Finance Committee - Agenda - 3/20/2019 - P378

By dnadmin on Mon, 11/07/2022 - 13:09
Document Date
Wed, 03/20/2019 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/20/2019 - 00:00
Page Number
378
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__032020…

3.4

3.5

3.6

B.

D.

Joints shall be tight and constructed in a manner that will conceal shrinkage.
Miter trim and moldings at exterior angles and at returns. Material shall show
no warp after installation. Install millwork and trim in the maximum practical
lengths.

Fasten finish work with finish nails. Provide blind nailing where practicable. Set
face nails for putty stopping.

Install facia, soffits, trim boards, and soffit vents.

INSTRUMENT PANEL DOORS

A.

B.

Set plumb and square. Install hardware and weatherstrip so that door closes
tightly, forming weather-tight seal.

Instrument panels shall be lagged directly to the panel board using hot-dipped
galvanized or stainless steel hex head lag screws or secured to strut channel
lagged in a similar manner to the panel board.

TOP AND SOLE PLATES

A.

B.

C.

Install double top plate. Sole plate shall be installed over pressure treated sill.
Install sill insulation between sill and top of concrete foundation wall.

Set sill level and square and wedge with steel or slate shims; point or grout with
non-shrinking cement mortar to provide continuous and solid bearing. Anchor
sills to the foundations as indicated. Provide bolts with plate washers and nuts.
Bolts in exterior walls shall be zinc-coated.

All sills shall be solid runs without butts or laps and anchored as shown. Use
pressure treated members in contact with concrete.

WALL FRAMING

A.

Select studs for straightness and set plumb, true, and in alignment. Sizes and
spacing of studs shall be as indicated. Double studs at jambs and heads of
openings and triple at corners to form corner posts. Frame corner posts to
receive sheathing and interior finish. Truss over openings exceeding 4 feet in
width or use a header of sufficient depth. Nail studs to plates with minimum two
16-penny nails or fasten with metal nailing clips or connectors. Frame openings
for doors, louver and fan.

Use plates for walls of the same width as the studs to form continuous horizontal
ties. Splice single plates; stagger the ends of double plates. Double top plates in
walls built up of two nominal 2-inch thick members. Nail lower members of
double top plates and single top plates to each stud and corner post with
minimum two 16-penny nails. Nail the upper members of double plates to the

File No. 3066.09 Wood Framing and Insulation 06210 - 5 of 6 December 2017

Page Image
Finance Committee - Agenda - 3/20/2019 - P378

Finance Committee - Agenda - 3/20/2019 - P379

By dnadmin on Mon, 11/07/2022 - 13:09
Document Date
Wed, 03/20/2019 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/20/2019 - 00:00
Page Number
379
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__032020…

3.7

3.8

3.9

3.10

lower members with 10-penny nails, two near each end, and stagger 16 inches
on center intermediately between. Nail sole plates through the sills.

INTERIOR WALL SHEATHING

A.

B.

Exterior grade plywood shall be applied with the sanded side facing into
building. Extend sheathing over and nail to sill and top plate. Abut sheathing
edges over centerlines of supports. Make cuts straight and even. Abut sides and
ends closely with no more than a %-inch gap between sheathes. If sheathing is
applied horizontally, stagger vertical end joints. Nail panels with 6-penny
galvanized nails spaced 6 inches on center along edges of the panel and 12
inches on center over intermediate supports. Install sheathing on walls and
ceiling.

Install interior trim around doors and other openings

BUILDING PAPER

A.

Install building paper where needed in accordance with the roofing and siding
manufacturer's instructions.

INSULATION AND ROOF VENTS

A.

D.

Install ceiling insulation and soffit vents between rafters. Install insulation in
walls and ceiling of sump riser building, but not panel boards.

Install insulation in accordance with manufacturer’s instructions. Ceiling
insulation should be installed with printed side against ceiling.

Surfaces shall be dry, and free of dust, dirt and debris prior to installation of
insulation. Remove and replace any insulation that becomes damaged or wet.

Install roof ridge vent in accordance with manufacturer's recommendations.

FRAMING TOLERANCES

A.

Framing members which will be covered by finishes such as plywood sheathing,
metal siding, and metal roofing shall be within the following limits:

1. Plates and sills - %-inch in 8 feet from a straight line;

2. Studs - %-inch in 8 feet out of plumb, not cumulative; and

3. Face of framing members - %-inch in 8 feet from a true plane.

[END OF SECTION 06210]

P:\3000s\3066.09\Source Files\Type II App\Specifications\Division 6 Specifications\06210 Wood Framing and Insulation.docx

File No. 3066.09 Wood Framing and Insulation 06210 - 6 of 6 December 2017

Page Image
Finance Committee - Agenda - 3/20/2019 - P379

Finance Committee - Agenda - 3/20/2019 - P380

By dnadmin on Mon, 11/07/2022 - 13:09
Document Date
Wed, 03/20/2019 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/20/2019 - 00:00
Page Number
380
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__032020…

CONTENTS

DIVISION 8 — DOORS

Section 08100 - Metal Doors and Frames
Section 08712 - Door Hardware

SANBORN i HEAD

Page Image
Finance Committee - Agenda - 3/20/2019 - P380

Finance Committee - Agenda - 3/20/2019 - P381

By dnadmin on Mon, 11/07/2022 - 13:09
Document Date
Wed, 03/20/2019 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/20/2019 - 00:00
Page Number
381
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__032020…

SECTION 08100
METAL DOORS AND FRAMES
PART 1 - GENERAL
1.1 SUMMARY

A. Provide metal doors with frames, where shown on the Drawings, as specified
herein, and as needed for a complete and proper installation.

1.2 SUBMITTALS

A. Submit the following:

1. Materials list of items proposed to be provided under this Section.

2. Manufacturers’ specifications and other data needed to demonstrate
compliance with the specified requirements.

3. Shop drawings showing details of each frame type, elevations of door
designs, details of openings, and details of construction, installation, and
anchorage.

4. Manufacturer’s recommended installation procedures

1.3 QUALITY ASSURANCE

A. Use skilled workers who are experienced and are completely familiar with the
specified requirements and the methods needed for proper performance of the
work of this Section.

B. Unless specifically otherwise approved by ENGINEER, provide all products of
this Section from a single manufacturer.

C. Fire Rated Doors and Frames: (required ratings as indicted on the drawings)
shall be constructed and tested in accordance with UL-10B and approved by
Underwriter’s Laboratories or other recognized testing agency having a factory
inspection service.

PART 2 - PRODUCTS
2.1 METAL DOORS

A. Acceptable manufacturers
1. Steelcraft of Cincinnati, Ohio
2. Pioneer Industries of Carlstadt, New Jersey
3. Security Metal Products of Ontario, California
4. Other manufacturers with ENGINEER’s approval

File No. 3066.09 Metal Doors and Frames 08100- 1 of 4 December 2017

Page Image
Finance Committee - Agenda - 3/20/2019 - P381

Finance Committee - Agenda - 3/20/2019 - P382

By dnadmin on Mon, 11/07/2022 - 13:09
Document Date
Wed, 03/20/2019 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/20/2019 - 00:00
Page Number
382
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__032020…

2.2

B. Provide 1-%4-inch hollow metal doors of the type and size indicated on the
Drawings.

C. Fabricate exterior door, panels and frames from galvanized steel sheet ASTM
A653/A653M, G60 or A60.

D. Unless otherwise noted on the drawings, doors shall be reinforced with
impregnated kraft honeycomb core, laminated to the inside faces of both steel
panels.

E. Doors shall have continuous, vertical, interlocking joints at both the lock and
hinge edges. Both edges shall have visible seams.

F. Provide 16-gauge hot dipped galvanized steel for exterior doors and 18-gauge
galvanized steel for interior doors.

G. All doors shall have top and bottom, 14-gauge steel reinforcement channels,
spot-welded into place. Provide 7-gauge hinge reinforcements, 16-gauge lock
reinforcements. Provide 14-gauge closer reinforcements in all doors.

H. Provide steel top caps in all metal doors opening to the exterior.

I. Glazing - Where called for, provide clear, %-inch thick polished wire glass with
a diagonal mesh of woven stainless steel wire in sizes as indicated on Drawings.

J. Insulation - Where indicated on Drawings, provide door with polystyrene
insulation with an R-value of not less than 7.0.

K. Doors shall be cleaned, phosphatized and finished with one coat of baked-on
rust-inhibiting prime paint in accordance with ANSI A250.10.

STEEL FRAMES

A. Provide metal frames for doors and other openings of types and styles suitable

for the doors indicated on the drawings. Conceal fastenings unless otherwise
indicated.
1. 16-gauge galvanized for interior frames
2. 14-gauge hot dipped galvanized for exterior frames.
B. Minimum thickness of hardware reinforcing plates shall be as follows:

Hinge 7 gauge

Strike reinforcements 16 gauge

Flush bolt reinforcements12 gauge

Closer reinforcements 12 gauge

Reinforcements for surface mounted hardware 12 gauge.

We WN bP

File No. 3066.09 Metal Doors and Frames 08100- 2 of 4 December 2017

Page Image
Finance Committee - Agenda - 3/20/2019 - P382

Finance Committee - Agenda - 3/20/2019 - P383

By dnadmin on Mon, 11/07/2022 - 13:09
Document Date
Wed, 03/20/2019 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/20/2019 - 00:00
Page Number
383
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__032020…

C.

D.

Provide anchors as recommended by the manufacturer.

Door Silencers - Except on weather stripped frames, drill stops to receive
three silencers on strike jambs.

2.3. FINISH HARDWARE

A.

Secure templates from the finish hardware supplier, and accurately install, or
make provision for, all finish hardware at the factory.

Prepare hollow metal units to receive mortised and concealed finish hardware,
including cutouts, reinforcing, drilling, and tapping in accordance with final
Finish Hardware Schedule and templates provided by hardware supplier.
Comply with applicable requirements of ANSI Al15 “Specifications for Door
and Frame Preparation of Hardware.” Locate finish hardware as shown on
final shop drawings.

PART 3 - EXECUTION

3.1 INSTALLATION

A.

Install doors in accordance with the shop drawings and the manufacturer's
installation instructions.

Install fire rated doors and frames in accordance with NFPA 80.

Placing Frames

1. Where practicable, place frames prior to construction of enclosing walls
and ceilings.

2. Set frames accurately into position, plumbed, aligned, and braced securely
until permanent anchors are set.

3. After wall construction is completed, remove temporary braces and
spreaders, leaving surfaces smooth and undamaged.

4. At in-place construction, set frames and secure to adjacent construction
with suitable anchorage devices.

5. All masonry openings at door bucks and frames in all exterior walls shall
be thoroughly caulked.

6. Door frames shall be adequately anchored, shall be installed plumb and
true and shall be perfectly adjusted to operate smoothly.

7. Doors and all their components and accessories shall be hung with all
hardware in perfect working order and alignment. Clearances between
door edges and bucks shall be the same around the perimeter and the
clearance shall not be less than %, -inch.

File No. 3066.09 Metal Doors and Frames 08100- 3 of 4 December 2017

Page Image
Finance Committee - Agenda - 3/20/2019 - P383

Finance Committee - Agenda - 3/20/2019 - P384

By dnadmin on Mon, 11/07/2022 - 13:09
Document Date
Wed, 03/20/2019 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/20/2019 - 00:00
Page Number
384
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__032020…

8. In areas where a threshold is provided the clearance between the bottom
of the door and the threshold shall not exceed 34-inch. Where a threshold
is not provided, the clearance at the bottom of the door shall be a
maximum of %4-inch.

3.2 ADJUST AND CLEAN

A. Final Adjustments
1, Check and readjust operating finish hardware items in hollow metal work
just prior to final inspection.
2. Leave work in complete and proper operating condition.
3. Remove defective work and replace with work complying with the
specified requirements.

B. Immediately after erection, sand smooth all rusted and damaged areas of
prime coat, and apply touch-up of compatible air-drying primer.

[END OF SECTION]

S:\CONDATA\3200s\3265.00\Source Files\Technical Specifications\ Division 8 Specifications\08100 Metal Doors and Frames.docx

File No. 3066.09 Metal Doors and Frames 08100- 4 of 4 December 2017

Page Image
Finance Committee - Agenda - 3/20/2019 - P384

Finance Committee - Agenda - 3/20/2019 - P385

By dnadmin on Mon, 11/07/2022 - 13:09
Document Date
Wed, 03/20/2019 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/20/2019 - 00:00
Page Number
385
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__032020…

SECTION 08712

DOOR HARDWARE

PART 1 - GENERAL

1.1.

1.2.

1.3.

1.4.

SECTION INCLUDES

A. Hardware for doors.

B. Thresholds.

C. Weatherstripping.

COORDINATION

A. Coordinate work of this Section with other directly affected Sections
involving manufacturer of any internal reinforcement for door hardware.

QUALITY ASSURANCE

A. Manufacturers - Companies specializing in manufacturing of door hardware
shall have minimum of five years’ experience.

B. Hardware Supplier - Company specializing in supplying commercial and
institutional door hardware with five years’ experience and approved by
manufacturer.

C. Hardware Supplier Personnel - Employ an Architectural Hardware
Consultant (AHC) to assist in the work of this Section.

D. Any opening shown on plans and requiring hardware and not specifically
mentioned shall be furnished with hardware corresponding to that of similar
openings. Any item of hardware not specifically called for in the hardware
schedule but obviously required for proper operation of the openings or
compliance with the applicable codes, including handicapped requirements,
if not brought to the attention of ENGINEER prior to bid date, is assumed to
be included in the hardware supplier’s proposal.

REGULATORY REQUIREMENTS

A.

B.

Conform to code for requirements applicable to fire rated doors and frames.

Conform to the applicable sections of Chapter 5 of NFPA 101.

File No. 3066.09 Door Hardware 08712- 1 of 5 December 2017

Page Image
Finance Committee - Agenda - 3/20/2019 - P385

Finance Committee - Agenda - 3/20/2019 - P386

By dnadmin on Mon, 11/07/2022 - 13:09
Document Date
Wed, 03/20/2019 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/20/2019 - 00:00
Page Number
386
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__032020…

1.5. SUBMITTALS

A. Supplier’s Hardware Schedule - Submit finish hardware schedule, shop
drawings, and product data. Hardware schedules are intended for
coordination of the work. Review and acceptance by ENGINEER or OWNER
does not relieve CONTRACTOR of his exclusive responsibility to fulfill the
requirements as shown and specified.

B. Finish Hardware Schedules - Based on finished hardware indicated, organize
hardware schedule into groups or sets showing complete designations of
every item required for each door opening.

1. Number, location, hand, and material of each door opening. (Hands and
swings to be determined in relation to key side of opening).

2. Type, style, function, size, finish, manufacturer’s catalog number, and
quantity of each hardware item.

3 Name and manufacturer of each item.

4. Fastening requirements.

5 Explanation of abbreviations used if other than DHI abbreviations and
symbols.

6. Special mounting locations and instructions.

7. Keying information.

C. Furnish an index cross-referencing door number, engineers hardware group
and suppliers hardware group.

D. Samples - If requested by ENGINEER, submit one sample of each type of
exposed hardware, finished as required, and tagged with full description for
coordination with the schedule.

E. Certificate - When requested by ENGINEER, furnish manufacturers’
certificates attesting that hardware items conform to the reference under
which the items are governed.

F. Operating Instructions - Furnish OWNER with one (1) complete set of
installation instructions, including manufacturer’s catalog, special adjusting
tools and maintenance instructions. One complete catalog shall be furnished
for each manufacturer listed in the approved hardware schedule.

G. Templates - The hardware supplier shall provide necessary templates
and/or physical hardware to all trades or factories requiring them in order
that they may cut, reinforce, or otherwise prepare their material or product
to receive the hardware item. If physical hardware is required by any
manufacturer, the hardware supplier shall ship them such hardware via
prepaid freight in sufficient time to prevent any delay in the execution of
their work.

File No. 3066.09 Door Hardware 08712- 2 of 5 December 2017

Page Image
Finance Committee - Agenda - 3/20/2019 - P386

Finance Committee - Agenda - 3/20/2019 - P387

By dnadmin on Mon, 11/07/2022 - 13:09
Document Date
Wed, 03/20/2019 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/20/2019 - 00:00
Page Number
387
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__032020…

1.6. OPERATION AND MAINTENANCE DATA

A.

Submit operation and maintenance data. Include data on operating
hardware, lubrication requirements, and inspection procedures related to
preventative maintenance.

1.7. DELIVERY, STORAGE, AND HANDLING

A.

D.

Deliver products to site under and store in an area where products are
protected from damage and the elements.

Items damaged in shipment shall be replaced promptly and with proper
material without additional cost to OWNER. All hardware shall be handled in

a manner to minimize marring, scratching, and damage.

Package hardware items individually; label and identify package with door
opening code to match hardware schedule.

Deliver keys to OWNER by security shipment direct from hardware supplier.

1.8. WARRANTY

A.

Provide five-year warranty to also include coverage of door closers.

1.9. MAINTENANCE MATERIALS

A.

Provide special wrenches and tools applicable to each different or special
hardware component.

Provide maintenance tools and accessories supplied by hardware component
manufacturer.

PART 2 - PRODUCTS

2.1. GENERAL

A.

Fasteners

1. Furnish the necessary screws, bolts, and other fasteners of suitable size
and type to anchor the hardware in position for long life under hard
use.

2. Where necessary, furnish fasteners with expansion shields, toggle bolts,
and other anchors approved by the ENGINEER, according to the
material to which the hardware is to be applied and according to the
recommendations of the hardware manufacturer.

File No. 3066.09 Door Hardware 08712- 3 of 5 December 2017

Page Image
Finance Committee - Agenda - 3/20/2019 - P387

Pagination

  • First page « First
  • Previous page ‹‹
  • …
  • Page 3075
  • Page 3076
  • Page 3077
  • Page 3078
  • Current page 3079
  • Page 3080
  • Page 3081
  • Page 3082
  • Page 3083
  • …
  • Next page ››
  • Last page Last »

Search

Meeting Date
Document Date

Footer menu

  • Contact