Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Search

Search

Displaying 12951 - 12960 of 38765

Board Of Aldermen - Agenda - 9/28/2021 - P57

By dnadmin on Mon, 11/07/2022 - 07:08
Document Date
Fri, 09/24/2021 - 17:19
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 09/28/2021 - 00:00
Page Number
57
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__092820…

To:

From:

Re:

C. Motion:

Discussion:

City of Nashua, Public Works Division

Board of Public Works Meeting Date: August 26, 2021

Daniel Hudson, P.E., City Engineer
Engineering Department

CMOM Plan Implementation — Phase I]

To approve the engineering consultant contract with Hazen and Sawyer of
Manchester, NH for the CMOM Implementation Phase I] in an amount not to
exceed $2,600,000. Funding for this contract will be through Department 169
Wastewater; Fund: SRF Loan; Activity: CMOM Phase II. (Pending approval)

As part of the City’s wastewater discharge permit, the EPA required a Capacity,
Management, Operation and Maintenance (CMOM) plan be developed to outline
an approach to find a practicable and affordable strategy to clean, repair and
maintain the wastewater and drainage collection systems so they can provide a
maximum level of service. A CMOM plan was completed by consultant
CDM/Smith in April 2018 to develop a process for inspecting and assessing the
over 497 miles of pipe comprising the wastewater and stormwater collection
systems. In October 2018, consultant Hazen and Sawyer was contracted to
implement the plan in two phases. During Phase I which was completed in February
2021, over 121,000 linear feet of the oldest and largest wastewater sewers and over
24,000 linear feet of storm drains and culverts were cleaned and inspected using
closed circuit television (CCTV). The condition of the pipes was rated and
recommendations for rehabilitation were made. In addition, Hazen updated the
City’s GIS collection system mapping with the findings, drafted standard operating
procedures and an Operation and Maintenance Manual for the collection system
infrastructure.

Phase II of the implementation will continue the CCTV inspection of the older and
largest pipes in the collection systems. Pipes located in difficult to reach locations
will also be investigated as well as associated infrastructure such as manholes,
headwails, and force mains. In anticipation of the necessary work, the City has
requested to enter into a $2.6 million State Revolving Fund (SRF) loan agreement
for the CMOM Implementation Phase II work, which is going through the NHDES
approval process. This contract will be awarded pending the acceptance of the loan
by the City.

Page Image
Board Of Aldermen - Agenda - 9/28/2021 - P57

Board Of Aldermen - Agenda - 9/28/2021 - P58

By dnadmin on Mon, 11/07/2022 - 07:08
Document Date
Fri, 09/24/2021 - 17:19
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 09/28/2021 - 00:00
Page Number
58
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__092820…

ENGINEERING REPORT PHASE
CONTRACT FOR PROFESSIONAL SERVICES
FOR
TREATMENT WORKS

CITY APOMAN OF NASHUA, New HAMPSHIRE

This AGREEMENT made and entered into at HILLSBOROUGH County, New Hampshire, this day of 2021,

by and between City/Town of NASHUA, NEW HAMPSHIRE hereinafter called the OWNER, and HAZEN and SAWYER
hereinafter called the ENGINEER.

WITNESSETH:

WHEREAS, the OWNER intends to continue with Phase Il of the Development and Implementation of a Capacity,

Management, Operation, and Maintenance (CMOM) Program hereinafter called the PROJECT, and
WHEREAS, professional sanitary engineering services are required to prepare an engineering report, and
WHEREAS, such services are of a distinct professional nature and hence not subject to the bidding process,
NOW THEREFORE, in consideration of these premises and of the mutual covenants herein set forth, the OWNER

hereby employs the ENGINEER to furnish the following engineering services in connection with the proposed PROJECT;
and it is agreed by and between the OWNER and the ENGINEER as follows:

Page Image
Board Of Aldermen - Agenda - 9/28/2021 - P58

Board Of Aldermen - Agenda - 9/28/2021 - P59

By dnadmin on Mon, 11/07/2022 - 07:08
Document Date
Fri, 09/24/2021 - 17:19
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 09/28/2021 - 00:00
Page Number
59
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__092820…

ENGINEERING REPORT PHASE CONTRACT Page 2 of 5
For Professional Services for Treatment Works

|. SERVICES TO BE PERFORMED BY THE ENGINEER

A. The ENGINEER agrees to produce a complete and definitive Engineering Report to meet current division requirements
and to perform any and all engineering incidental thereto. The detailed scope of the work is as outlined in the attached
Exhibit A - Scope of Work for Engineering Services dated August 2021.

C. Furnish_hard copies and / or pdf files in accordance with Exhibit A deliverables ef+he-—Engineering Resert to the
OWNER and tve-2}-cepies to the New Hampshire Department of Environmental Services, Water Division, hereinafter
called the DIVISION. Additional copies to be available at cost.

E. Provide the DIVISION with one copy of design calculations, work sheets, field notes, estimates and other data generated
in preparing the Engineering Report in a form satisfactory to the DIVISION.

i. THE OWNER'S RESPONSIBILITIES

A. Assist the ENGINEER by placing at his disposal all available information pertinent to the PROJECT, including previous
reports and other data relative to the reports.

B. Make provisions for the ENGINEER to enter upon public and private lands, municipal facilities and industrial
establishments as required to perform work under this AGREEMENT.

Wl. Time of Completion

A. The ENGINEER agrees that he will submit to the DIVISION and the OWNER for approval after modification or revision
as recommended by the DIVISION and agreed to by the ENGINEER the completed report within 730 consecutive
calendar days following the acceptance of the contract by the OWNER, and deliver same to the OWNER within 60
calendar days following the date of final approval by the DIVISION.

B. Itis agreed by the parties to this contract that failure by the ENGINEER to complete the work within the time stipulated
under Ill, A, above may be considered sufficient basis for the debarment of the ENGINEER from the DIVISION'S Roster
of Prequalified Engineers as provided for under New Hampshire Code of Administrative Rules Env-Wq 603.08, or the
Assessment of liquidated damages as provided for under RSA 485A: 4, XII.

IV. COMPENSATION TO BE PAID THE ENGINEER
A. Method of Payment Amount of Fee
1. Payment to the ENGINEER, for services rendered, shall be according to the following schedule:

2. Monthly billing based on hours and rates by labor category with markup and incidental expenses in accordance
with the attached Exhibit B — Fee Schedule.

3. The OWNER agrees to pay and the ENGINEER agrees to accept for all services under this AGREEMENT, a fee not to
exceed Two Million Six Hundred Thousand and 00/100 Dollars ($2,600,000.00), and the ENGINEER agrees that the
work proposed is sufficient to satisfactorily complete the study and that the monies to be paid are adequate.

Rev. 2020-11

Page Image
Board Of Aldermen - Agenda - 9/28/2021 - P59

Board Of Aldermen - Agenda - 9/28/2021 - P60

By dnadmin on Mon, 11/07/2022 - 07:08
Document Date
Fri, 09/24/2021 - 17:19
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 09/28/2021 - 00:00
Page Number
60
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__092820…

ENGINEERING REPORT PHASE CONTRACT Page 3 of 5
For Professional Services for Treatment Works

The attached fee schedule with labor category, hours, hourly rate, markup, incidental expenses, and fees for special
services, shall be the basis for billing for engineering services.

a. The ENGINEER agrees that prior to submitting the report to the DIVISION for formal approval he shall make
revisions in the report as recommended by the DIVISION and agreed to by the ENGINEER without additional
compensation. After formal approval if it becomes necessary to update the report for reasons beyond the
control of the ENGINEER, payment for such revision or revisions shall be made to the ENGINEER on a basis to be
negotiated with the DIVISION.

V. ADDITIONAL COVENANTS

A. The ENGINEER agrees to assign in active charge of this PROJECT for the life of the contract a Project Engineer who is a
permanent employee of the ENGINEER and who a “qualified sanitary engineer” is as defined under the DIVISION'S
“Rules and Regulations for the Prequalification of Consulting Engineers.” The Project Engineer shall be?

Alberto Angles, Jr, P.E ,1750 Elm St, Suite 402, Manchester, NH 03101

Resume clearly describing the candidate's qualifications for the assignment is appended for convenience of reference.

Any proposed change in identity of the Project Engineer on the PROJECT shall first be approved by the DIVISION before
transfer of responsibility is made. Failure of the ENGINEER to abide by the above covenant is agreed to be sufficient
basis for debarment of the ENGINEER from the DIVISION'S Roster of Prequalified Consulting Engineers as provided for
under New Hampshire Code of Administrative Rules Env-Wq 603.08.

ef the—werkeevered_by this AGREEMENF Reference Exhibit C and Item 12 which contains the OWNER’S

Indemnification General Term and Condition clause.

C. The ENGINEER further agrees to procure and maintain at his expense such workmen's compensation insurance as is
required by the statutes and public liability insurance in amounts adequate to provide reasonable protection from
claims for bodily injury, death or property damage which may result from his performance and the performance of his
employees under this AGREEMENT.

D. All documents, including original drawings, design calculations, work sheets, field notes, estimates, and other data shall
remain the property of the OWNER and shall be transmitted to the OWNER in clean and orderly condition on demand;
however, these may be left in the possession of the ENGINEER at the OWNER'S discretion. ENGINEER may retain one
copy of the information produced under this Agreement for archival purposes.

E. The ENGINEER shall not sublet, assign or transfer any part of the ENGINEER'S services or obligations under this
AGREEMENT without the prior approval and written consent of the OWNER and the DIVISION, and the contract shall
be binding upon and inure to the benefit of the parties, their successors and assigns.

Vi. OWNER’S TERMS AND CONDITIONS

Exhibit C- City of Nashua Professional Services General Terms and Conditions, is hereby incorporated by reference as
if fully set forth herein.

1 See appended resume describing the candidate's qualifications for the assignment.

Rev. 2020-11

Page Image
Board Of Aldermen - Agenda - 9/28/2021 - P60

Board Of Aldermen - Agenda - 9/28/2021 - P61

By dnadmin on Mon, 11/07/2022 - 07:08
Document Date
Fri, 09/24/2021 - 17:19
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 09/28/2021 - 00:00
Page Number
61
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__092820…

ENGINEERING REPORT PHASE CONTRACT Page 4 of 5
For Professional Services for Treatment Works

IN WITNESS WHEREOF, the parties hereto have affixed their hand and seals at HILLSBOROUGH County, New Hampshire,
the day, month, and year first above written.

ENGINEER:

Hazen and Sawyer
J 09/01/2021

By: a Date:
(Authgrized Re presentative’)

OWNER:

City of Nashua, New Hampshire

By: Date:
(Authorized Representative?)

APPROVED:?
DEPARTMENT OF ENVIRONMENTAL SERVICES: Water Division

By: Date:
(Authorized Representative?)

2 Signatures should be supported by appropriate document.
3 itis agreed that as an act in furtherance of its statutory authority to approve engineering agreements for treatment works, the DIVISION's approval does not impose
any contractual obligation or liability on the State of New Hampshire, the Department of Environmental Services or the Division.

Rev. 2020-11

Page Image
Board Of Aldermen - Agenda - 9/28/2021 - P61

Board Of Aldermen - Agenda - 9/28/2021 - P62

By dnadmin on Mon, 11/07/2022 - 07:08
Document Date
Fri, 09/24/2021 - 17:19
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 09/28/2021 - 00:00
Page Number
62
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__092820…

Page 5 of 5

CERTIFICATION OF VOTE

At a meeting of the Shareholders and Directors of Hazen and Sawyer held on_ April 24, 2021

uum

at which all the Partners/Directors were present, except nla

it was

VOTES: That all contracts may be signed by any one of the following:

Officers of the Firm, including Chairman of the Board, the President and all Vice Presidents.

A true copy
Attest: William Crayon

Place of Business: 498 Seventh Avenue, 11th Floor, New York, NY 10018

Date: _ July 30, 2021

| hereby certify that | am the Treasurer and Chief Financial Officer of Hazen and Sawyer, and
that the above vote has not been amended or rescinded and remains in full force and effect as

f Co
A “ f a

Treasurer and Chief Financial Officer

Date: July 30, 2021

Page Image
Board Of Aldermen - Agenda - 9/28/2021 - P62

Board Of Aldermen - Agenda - 9/28/2021 - P63

By dnadmin on Mon, 11/07/2022 - 07:08
Document Date
Fri, 09/24/2021 - 17:19
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 09/28/2021 - 00:00
Page Number
63
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__092820…

NHDES-W-09-025

Cost or Price Summary Format for Sub-agreements Under NH SAG and SRF

Part |: General

Grantee/Loanee Name: City of Nashua

Grant/Loan #: CS-330158-XX (to be assigned)

Contractor/Subcontractor Name: Hazen and Sawyer

Proposal Date: August 2021

Contractor/Subcontractor Address:
1750 Elm Street, Suite 402,
Manchester, NH 03101

Services Furnished:
Professional Engineering Services

Street name and number City/Town State ZIP
Part Il: Cost Summary
Direct Labor (Specify labor categories) Hours Hourly Rate Estimated Totals
(Est.) Cost
PROJECT DIRECTOR 57 $90.00 $5,130
PROJECT MANAGER 1,067 $70.00 $74,690
SR. ASSOCIATE 618 $72.00 $44,496
ASSOCIATE 464 $53.00 $24,592
SR. PRINCIPAL ENGINEER 1,250 $48.00 560,000
PRINCIPAL ENGINEER 2,360 $43.00 $101,480
ENGINEER 2240 $37.00 $82,880
Direct Labor Total $393,268
Indirect Costs (Specify indirect cost pools.) Rate X Base = Est. Cost
179.0 % $393,268 $703,950
Indirect Costs Total $703,950
Other Direct Costs Est. Cost
Travel $9,256
Transportation
Per Diem
Travel Costs Total $9,256
Equipment Materials, Supplies (Specify categories.) Qty. Cost Est. Cost
Printing, postage, telephone, fax, etc. 1 $9,311
Student Manuals 1 $9,000
Equipment Subtotal $18,311
Subcontracts Est. Cost
NWMCC $1,326,000
CPl $14,450
Flow Assessment $25,044
Subcontractors Subtotal $1,365,494
Other (Specify categories.) Est. Cost
Other Subtotal SO
Other Direct Costs Total $1,393,061
Total Estimated Cost $2,490,278
Profit S 109,721
Total Price $2,600,000
Page 1 of 2

Part III Price Summary

Page Image
Board Of Aldermen - Agenda - 9/28/2021 - P63

Board Of Aldermen - Agenda - 9/28/2021 - P64

By dnadmin on Mon, 11/07/2022 - 07:08
Document Date
Fri, 09/24/2021 - 17:19
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 09/28/2021 - 00:00
Page Number
64
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__092820…

Part III Price Summary

Competitors Catalog Listings, In-house Estimates, Prior Quotes
(Indicate basis for price comparison)

Market Price(s)

Proposed Price

Total

Part IV Direct Labor by Category

14. Insert the appropriate work category in the table below. Work categories would include but not be limited to those categories
shown in the Contract Documents such as design, survey, subsurface, cadastral, O&M Manual, administration, inspection, record

drawings, start-up, special services etc.

0 2 |S >
z £ 5 < 2
“ o = = o c
6 2 od 2 3 3 5 = z 2
a a > os =a =
eis |B |~e/8 |§ | aa = |e |2 zg | 2
Work = & > og 3 = ai 2 cc a 3 g
category ¥ e 5 Eg . < Ss g iL 5 n 3 2
o wn vo vo ° - on E oO oO a s
> < 7 = aa S eC, o & o . . c a
s/o |3 |a£/8 | 28) s8 |S) 8 | fe/2 |E /E | F
Z=is |S |>S2leul se ss U2 /F | SF) SelB | F 3
s|e /s | Fs] es flee |t |e | 2s #|/3 )/< | =
wv o °O fe 2m $o| gos a Y = 2 Es | s @ rs Q .
Se 5 |S | ss |§a/5 a ze\/2 |e |Se/sal}s | 2 | 8 | s 8
a oO oO vA va D> “wel £0 a “a a £& a D = oO E fc oO
Project 26 | 12 1 8 0 2 4 0 2 0 0 2 0 57 $90 | $5,130
Director
Project 339 | 84 24 260 108 12 16 4 24 96 72 16 12 1067 | $70 | $74,690
Manager
sr 76 | 24 0 273 24 8 34 0 48 94 12 25 0 618 $72 | $44,496
Associate
Associate | 0 0 0 225 60 0 0 60 |0 70 24 25 0 464 $53 | $24,592
Sr.
Principal 124 | 304 | 40 128 72 52 178 0 32 88 72 80 80 1250 | $48 | $60,000
Engineer
Principal =| 35 |o6 |o sse | 300 | 36 | 68 8 112 | 416 | 264 |50 |92 | 2360 | $43 | $101,480
Engineer
Engineer | 52 | 88 0 1126 | 284 0 0 0 96 332 92 90 80 2240 | $37 | $82,880
TOTALS | 8056 $393,268
Page 2 of 2

Rev. 2020-11

Page Image
Board Of Aldermen - Agenda - 9/28/2021 - P64

Board Of Aldermen - Agenda - 9/28/2021 - P65

By dnadmin on Mon, 11/07/2022 - 07:08
Document Date
Fri, 09/24/2021 - 17:19
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 09/28/2021 - 00:00
Page Number
65
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__092820…

Education

BS, Civil Engineering,
Northeastern University, 1990

AS, Civil Engineering Technology,
Wentworth Institute of Technology,
1987

Certification/License
Professional Engineer: MA, NH, VT

Areas of Expertise

+ Water distribution, drainage and
sewage collection system
design and rehabilitation

« Project management

Experience
* 33 total years

« 2years with Hazen

Professional Activities
Water Environment Federation

New England Water Environment
Association

New England Water Works
Association

Hazen

Alberto Angles Jr., PE

Senior Associate

Mr. Angles is a project manager with experience
in the planning, design, construction, and
evaluation of water and wastewater utility
systems. He is also well versed with all phases of
project development - from investigative studies
through the design, bid, and construction
phases - with a major focus on conveyance and
utility work.

Brookfield Street Water Main Replacement, Hartford Metropolitan
District Commission, CT

Senior Project Engineer for the design of the water transmission main re-
placement on Brookfield Street, replacing approximately 7,000 If of 36-
inch steel transmission main in congested urban areas of Hartford. The
project also included inland/wetland permitting, soil corrosivity testing,
and traffic control. Responsibilities included supervising the daily activ-
ities of the Team, coordination of team resources, oversight of design and
development of contract documents, QA/QC milestone reviews, and bud-
get and schedule management.

Oak Street Water Main Design, Hartford Metropolitan District
Commission, East Hartford and Glastonbury, CT

Lead Design Engineer for replacement of 16,000 If of 16-inch water main
in residential areas along the urban thoroughfare, Oak Street. The proj-
ect included inland/wetland permitting and the Connecticut Department
of Transportation permitting. Responsibilities included supervising the
daily activities of the Team, coordination of team resources, oversight of
design and development of contract documents, QA/QC milestone reviews,
and budget and schedule management.

Residential Water Main Replacement Design and Construction
Services, Needham Water and Sewer Division, MA

Senior Project Engineer for the design of 9,000 feet of 8-inch and 12-inch
water main replacements in residential neighborhoods. Responsibilities
included supervising the daily activities of the Team, coordination of team
resources, oversight of design and development of contract documents
for Public Bidding (under M.G.L. c. c 30, § 39M), QA/QC milestone reviews,
and budget and schedule management.

Page Image
Board Of Aldermen - Agenda - 9/28/2021 - P65

Board Of Aldermen - Agenda - 9/28/2021 - P66

By dnadmin on Mon, 11/07/2022 - 07:08
Document Date
Fri, 09/24/2021 - 17:19
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 09/28/2021 - 00:00
Page Number
66
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__092820…

Alberto Angles Jr., PE

References

Brookfield Street Water Main
Role: Senior Project Engineer
Hartford MDC

Alvin Tan

Project Manager

555 Main Street

Hartford, CT 06142
860.278.7850
atan@themdc.com

Residential Water Main

Role: Senior Project Engineer
Needham Water and Sewer
Robert Lewis

Water and Sewer Superintendent
470 Dedham Ave.

Needham, MA 02492
781.455.7548
rlewis@town.needham.ma.us

Commercial Street/Fort Square
Role: Deputy Project Manager
Gloucester DPW

Ryan Marques

Project Manager

City Hall Annex

3 Pond Road

Gloucester, MA 01930
978.325.5335
rmarques@gloucester-ma.gov

Commercial Street/Fort Square Utilities Upgrade, City of
Gloucester, MA

Deputy Project Manager for the investigation, design, permitting, bidding
(under M.G.L. c. ¢ 30, § 39M), and construction services for the City’s Pub-
lic Infrastructure Replacement Project. The project includes approximate-
ly 3,200 If of 8” to 12” water mains, 2800 If of sanitary sewers, 1,100 If of
sewer force main, 1,500 If of storm drains, and a 150-gpm submersible
sanitary sewer pump station. The project is located in a heavily developed
urban area, which includes a mix of industrial marine facilities and resi-
dential properties. The drainage system was designed to incorporate pro-
prietary separators to capture and retain total suspended solids, floatables,
and total petroleum hydrocarbons. Existing bulkheads, seawalls, and rip-
rap were modified to accommodate the new work. Full depth reconstruc-
tion of roadways, sidewalks, and curbing were also included.

Worcester Road Pump Station Elimination, Town of Framingham, MA
Deputy Project Manager for the final design phase for the construction of
anew wastewater 5.6 mgd self-cleaning trench wet well pumping station,
6,200 feet of 30-inch interceptor sewer, and 1,900 feet of 8-inch and 14-
inch dual force mains. The project includes a compact pumping station
site, complex excavation, and significant groundwater dewatering. Odor
control was provided using activated carbon. Provisions for the addition
of Bioxide were also made to address concerns of hydrogen sulfide corro-
sion and odor issues. The project includes environmental permitting, SRF
funding assistance, and public outreach.

Mill Cove Relief Siphon Design and Construction, Massachusetts
Water Resources Authority, Weymouth, MA

Senior Engineer responsible for design of 2,000-feet of 42-inch HDPE
sewer siphon across Mill Cove; incorporated horizontal directional drill-
ing to circumvent a lengthy permitting process and reduce cost and con-
struction time for the Massachusetts Water Resources Authority (MWRA).

Washington Street Drain and Outfall Design and Inspection
Program, City of Gloucester, MA

Project Manager providing engineering services during construction of
the Washington Street Drain Project, which is the first component of the
City’s long-term control plan for CSOs. Providing services for approximate-
ly 1,200 If of storm drain (12-inch to 60-inch) that discharges into the Out-
er Gloucester Harbor, approximately 500 feet offshore of Pavilion Beach.

Deer Island Treatment Plant As-Needed Technical Assistance,
MWRA, Winthrop, MA

Project Manager for task orders, including the design, bidding (under
M.G.L. c. c 30, § 39M) and engineering services during construction for
Parking Lot Modifications at the Deer Island plant and the Tafts Avenue
and Shirley Street Intersection Improvements.

Hazen and Sawyer

Page Image
Board Of Aldermen - Agenda - 9/28/2021 - P66

Pagination

  • First page « First
  • Previous page ‹‹
  • …
  • Page 1292
  • Page 1293
  • Page 1294
  • Page 1295
  • Current page 1296
  • Page 1297
  • Page 1298
  • Page 1299
  • Page 1300
  • …
  • Next page ››
  • Last page Last »

Search

Meeting Date
Document Date

Footer menu

  • Contact