4. Implementation and operational costs associated with each measure are then determined.
Estimated construction costs are compiled by the Energy Engineer and Operations Manager.
5. Feasibility of ECM’s (cost vs. savings) is then examined by the Energy Engineer. A draft list of
feasible ECM’s are developed based on the financials.