Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Board Of Aldermen

Board Of Aldermen

Board Of Aldermen - Agenda - 11/10/2020 - P65

By dnadmin on Sun, 11/06/2022 - 22:54
  • Read more about Board Of Aldermen - Agenda - 11/10/2020 - P65

Harvey Construction Spreadsheet Report . Page 4
Nashua PAC GMP PostBid VE 10/21/2026 3:45 AM

isolated Footi

isolated

Elevator Pit

ELEV-2 Elevator Pit & Walls Gone4000

ELEV-2 10.00 106.00

4" Basemant 806 2-Slory Conc3S00 psi 140.00 cy . 110.00 /cy

402.00
Mise Conc; Stair Pans, Housekeeping 80.00 cy 416.00 Icy
Concrete
Additives for Flatwork 501.00 cy 3.98 fey
4° Bayement SOG Infills 4-Slory Gone3500 10.00 wy 710.00 /cy

Site Gone 4" Loading Dock, Ramp & Stairs 46.00 cy 112,00 fey

Board Of Aldermen - Agenda - 11/10/2020 - P64

By dnadmin on Sun, 11/06/2022 - 22:54
  • Read more about Board Of Aldermen - Agenda - 11/10/2020 - P64

Harvey Construction

GENERAL CONDITIONS

P Dimensions

General Conditions

GENERAL REQUIREMENTS
T
at Main St. Sidewalk
EXISTING CONDITIONS
Demolition
TJakedowa + 2
Selective Demolition 4-Story Bldg

Completed Exploratery Demolition inv

Police Details on Main St. during

Asbestos Removal

Asbestos Removal

Concealed Asbesios Removal - Allowance
&

2-Story Foundation Wall Shores at A-Ln,
41-Ln & N-Ln. (prier to Bldg T:
Underpinning Allgwance

CONCRETE

Board Of Aldermen - Agenda - 11/10/2020 - P63

By dnadmin on Sun, 11/06/2022 - 22:54
  • Read more about Board Of Aldermen - Agenda - 11/10/2020 - P63

Harvey Construction

Spreadsheet Report
_Nashua PAC GMP PostBid VE _

Page 2
10/27/2020 3:45 AN

Notes

Report foniat

Frames and Paitted Terrace rails.

-Banquet Tablas or Chairs / Moveable Furniture.

No Foundation demolition at the 2-Story Building.

~S5SP6 AESS Prep.

-Architectural As-Built in CADD

-Design Services, Cost associated with Spacial inspections, Sales Tax
-See exhibit "J"

Sorted by ‘Group phase/Phase’
‘Detail summary

Board Of Aldermen - Agenda - 11/10/2020 - P62

By dnadmin on Sun, 11/06/2022 - 22:54
  • Read more about Board Of Aldermen - Agenda - 11/10/2020 - P62

Harvey Construction Spreadsheet Report Page t
Nashua PAC GMP PostBid VE 19/21/2020 8:45 AM

Project nama Nashua PAC GMP Post8id VE
201 Main St.
Nashua
NH
Estimator JEB
Laborrate table == NH
Job size s7c00 sf
Bid date 10/2/2020 2:00 PM
Notes Based on 100% CO Drawings & Specifications dated 8/14/20

Exclusions:
-Design Contingency
-Recent Tariffs.

Board Of Aldermen - Agenda - 11/10/2020 - P61

By dnadmin on Sun, 11/06/2022 - 22:54
  • Read more about Board Of Aldermen - Agenda - 11/10/2020 - P61

THE CITY OF NASHUA
DOWNTOWN PERFORMING ART CENTER
NASHUA, NEW HAMPSHIRE
GMP ESTIMATE
EXHIBIT “H”

10/20/2020

Board Of Aldermen - Agenda - 11/10/2020 - P60

By dnadmin on Sun, 11/06/2022 - 22:54
  • Read more about Board Of Aldermen - Agenda - 11/10/2020 - P60

321640 — Granite Curb

321723 ~ Pavement Markings
321726 — Tactile Warning Surfacing
323113 — Chain Link Fences & Gate
323130 — Bollards

Division 33 — UTILITIES
331100 — Water Distribution System
333100 — Sanitary Sewer System
334100 — Storm Drainage

ADDENDUMS -WNone BATE

Board Of Aldermen - Agenda - 11/10/2020 - P59

By dnadmin on Sun, 11/06/2022 - 22:54
  • Read more about Board Of Aldermen - Agenda - 11/10/2020 - P59

235360 — Mini-Split Air Conditioning Systems
235400 — HVAC Pumps

235450 — Hydrostatic Testing & Chemical Water Treatment
237300 — Variable Refrigerant Flow Systems
237810 — Dedicated Outside Air Unit

238350 — Terminal Heat Transfer Units
238450 — Energy Recovery Units

238960 — Ductwork

239160 — Ductwork Accessories

239200 — Sound Attenuators

239300 — Air Terminal Units

299360 — Air Outlets & Inlats

239750 — Building Automation System
239806 — Instrumentation

Board Of Aldermen - Agenda - 11/10/2020 - P58

By dnadmin on Sun, 11/06/2022 - 22:54
  • Read more about Board Of Aldermen - Agenda - 11/10/2020 - P58

Division 69 - FINISHES
092116 — Gypsum Board Assemblies
092120 — Gypsum Board Shaft Wail Assemblies
092409 — Plaster Patching and Repairs
093006 — Tiling
0951006 — Acoustical Ceilings
096454 — Stage Floor
096510 — Resilient Flooring & Accessories
096800 — Carpeting
099000 — Painting & Coating

DIVISION 10 —- SPECIALTIES
101400 — Signage
102110 - Toilet Compartments —
102210 — Wire Mesh Partitions
102800 — Toilet Accessories
10440 — Fire Protection Specialties
105110 ~ Metal Lockers

Board Of Aldermen - Agenda - 11/10/2020 - P57

By dnadmin on Sun, 11/06/2022 - 22:54
  • Read more about Board Of Aldermen - Agenda - 11/10/2020 - P57

DIVISION 04 —- MASONRY
040120 — Masonry Restoration & Cleaning
042000 — Unit Masonry
044000 — Exterior Stonework

DIVISION 05 - METALS
051200 — Structural Steel
051250 ~ Architecturally Exposed Structural Steel
052100 — Steel Joist
053100 — Steal Decking
054000 - Cold-Farmed Meial Framing
055000 — Metal Fabrications
055100 — Metal Stair & Railings
057300 - Decorative Metal Railings
057500 — Decorative Formed Metal
059000 — Hof Dip Galvanized Coatings

Board Of Aldermen - Agenda - 11/10/2020 - P56

By dnadmin on Sun, 11/06/2022 - 22:54
  • Read more about Board Of Aldermen - Agenda - 11/10/2020 - P56

Telcom — As Prepared by ICON Architects

T-001
T+104
T-102
T-103
7-104
T-105
T-201
T-301

Telecom Legend, Notes & Abbreviations
Basement Floor Telecom Plan

Ground Floor Telecom Plan

Parterre Floor Telecom Plan

Third Floor Telecom Plan

Fourth Floor Tefecom Plan

Telecom Riser Diagram

Telecom Details & Schedules

Theatrical LightIng — As Prepared by ICON Architects

oo * 2 @ 68 8 ©

Pagination

  • Previous page ‹‹
  • Page 1182
  • Next page ››
Subscribe to Board Of Aldermen

Footer menu

  • Contact