Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Agenda

Agenda

Board Of Aldermen - Agenda - 9/28/2020 - P96

By dnadmin on Sun, 11/06/2022 - 22:59
  • Read more about Board Of Aldermen - Agenda - 9/28/2020 - P96

UR EAN DESIGN assocrates Nashua Downtown Master Plan

Existing Condi- 66
tions of Main
Street South:
Sidewalks are located
directly adjacent to
moving lanes of traffic.
The lack of street trees
and presence of
overhead utilities creates
a dangerous and
unattractive pedestrian
environment.

(top two images}

Proposed Plan and
Section for Main
Street South:

Board Of Aldermen - Agenda - 9/28/2020 - P95

By dnadmin on Sun, 11/06/2022 - 22:59
  • Read more about Board Of Aldermen - Agenda - 9/28/2020 - P95

URBAN DESIGN ASSOCIATES

erty would be required in front of most
properties to create sidewalks and a
planting zone. Buildings between Otter-
son and Hollis should be set back
approximately 15” the sidewalk to pre-
serve the residential/institutional fabric.
Buildings between Otterson and Salmon
Brook should be built to the sidewalk.
The streetscaping program will

improve the overall pedestrian and vehic-

Nashua Downtown Master Plan

Board Of Aldermen - Agenda - 9/28/2020 - P94

By dnadmin on Sun, 11/06/2022 - 22:59
  • Read more about Board Of Aldermen - Agenda - 9/28/2020 - P94

UR EAN DESIGN assocrates Nashua Downtown Master Plan

Streetscape Program

‘The Master Plan recommends the City
undertake a comprehensive streetscape
and road improvement program for
Main Street between Hollis Street and
Allds Street. Creating a high quality
pedestrian environment does not require
major traffic flow modifications. The

Master Plan proposes preserving the cur-

Lake Street

rent lane configuration. The moving and 64
turning lanes that exist today, will

remain. However, the curb should be

Board Of Aldermen - Agenda - 9/28/2020 - P93

By dnadmin on Sun, 11/06/2022 - 22:59
  • Read more about Board Of Aldermen - Agenda - 9/28/2020 - P93

UR EAN DESIGN assocrates Nashua Downtown Master Plan

Main Street South can become an
important part of the overall Downtown

experience, its retail strategy, and its cir-

culation and park system. The half-mile
length of Main Street South should be

developed as a series of spatial experi-

ences varying one’s perception of the 63
long straight road, not as a single mono-

lithic avenue. The initiatives contained in

the following pages develop Main Street

South as a progression of unique places

Board Of Aldermen - Agenda - 9/28/2020 - P92

By dnadmin on Sun, 11/06/2022 - 22:59
  • Read more about Board Of Aldermen - Agenda - 9/28/2020 - P92

UR EAN DESIGN assocrates Nashua Downtown Master Plan

vi Main Street South

Board Of Aldermen - Agenda - 9/28/2020 - P91

By dnadmin on Sun, 11/06/2022 - 22:59
  • Read more about Board Of Aldermen - Agenda - 9/28/2020 - P91

UREAN

DESIGN ASSOCIATES

A streetscaping program will create an
appropriate setting for the five public
buildings located on Spring Street.
Also, four additional sites along
Spring Street have been identified for
public buildings. One of the sites could

be used for the relocation of Saint

Patrick’s Gymnasium from Main Street.

Moving the gymnasium to this site

maintains the facility's adjacency to the
parish but rebuilds it on a more appro-
ptiate site and frees up the Main Street

Board Of Aldermen - Agenda - 9/28/2020 - P90

By dnadmin on Sun, 11/06/2022 - 22:59
  • Read more about Board Of Aldermen - Agenda - 9/28/2020 - P90

UREAN

Parking Strategy
Upon completion of the
proposed garages, the
Downtown core will be
well served with
parking, as denoted by
five minute walking

radii. (left)

A well-defined parking
lot in the beart of
Lowell, Massachusetts
illustrates that small,
surface parking areas
can be tucked in and
around buildings and
landscaped creating a

pleasant street wall.

(right)

DESIGN ASSOCIATES

Board Of Aldermen - Agenda - 9/28/2020 - P89

By dnadmin on Sun, 11/06/2022 - 22:59
  • Read more about Board Of Aldermen - Agenda - 9/28/2020 - P89

Nashua Downtown Master Plan

locations when it is needed. Determina-
tion of need should consider issues such
as the deleterious effect of excess park-
ing, the potential impacts on surrounding
properties, and the need to create a dense
unique urban environment for Down-

town.

Board Of Aldermen - Agenda - 9/28/2020 - P88

By dnadmin on Sun, 11/06/2022 - 22:59
  • Read more about Board Of Aldermen - Agenda - 9/28/2020 - P88

UREAN

DESIGN ASSOCIATES

Nashua Downtown Master Plan

The proposed buildings would have Hilustrative Plan ofa 58
retail businesses at street level with redeveloped Hollis and
offices above. The offices could be used Main Street
by the hospital, or physicians offices, or ntersection
other businesses seeking office space in
the heart of Downtown.

At the easternmost part of the block,

Board Of Aldermen - Agenda - 9/28/2020 - P87

By dnadmin on Sun, 11/06/2022 - 22:59
  • Read more about Board Of Aldermen - Agenda - 9/28/2020 - P87

URBAN DESIGN ASSOCIATES

site. When market forces dictate redevel-
opment of the site, the City should part-
ner with Citizen's bank to create a legacy
project.

Pagination

  • Previous page ‹‹
  • Page 2527
  • Next page ››
Subscribe to Agenda

Footer menu

  • Contact