Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Board Of Aldermen - Agenda - 9/28/2020 - P95

Board Of Aldermen - Agenda - 9/28/2020 - P95

By dnadmin on Sun, 11/06/2022 - 22:59
Document Date
Fri, 09/25/2020 - 11:22
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Mon, 09/28/2020 - 00:00
Page Number
95
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__092820…

URBAN DESIGN ASSOCIATES

erty would be required in front of most
properties to create sidewalks and a
planting zone. Buildings between Otter-
son and Hollis should be set back
approximately 15” the sidewalk to pre-
serve the residential/institutional fabric.
Buildings between Otterson and Salmon
Brook should be built to the sidewalk.
The streetscaping program will

improve the overall pedestrian and vehic-

Nashua Downtown Master Plan

ular experience of Main Street South. A 65
new streetscape program should locate

utilities underground in accessible

trenches. In addition, the streetscape

should provide generous street trees, low

level pedestrian scaled lighting, high level

street lighting, textured (possibly brick,

extended from Main Street North) side-

walks and crosswalks. The streetscape

should be designed to calm traffic by cre-

Street Sections
Existing Main Street
North, between Hollis
Street and the Nashua
River (top)

Proposed Section for
Main Street South
between Salmon Brook
and Otterson Street
(second)

Proposed Section for
Main Street South
between Hollis Street
and Otterson Street
{third}

Existing Section of
Main Street South

between Otterson and
Salmon Brook {bottom}

Page Image
Board Of Aldermen - Agenda - 9/28/2020 - P95

Footer menu

  • Contact