Board Of Aldermen - Agenda - 4/12/2022 - P227

By dnadmin on Mon, 11/07/2022 - 07:45
  • Read more about Board Of Aldermen - Agenda - 4/12/2022 - P227

B. TRENCHES:

1.

Qo

Bedding as detailed and specified shall be furnished and installed beneath the

pipeline prior to placement of the pipeline. A minimum bedding thickness shall

be maintained between the pipe and undisturbed material, as shown on the

Drawings.

As soon as practicable after pipes have been laid, backfilling shall be started.

Unless otherwise indicated on the Drawings, select backfill shall be placed by

hand shovel in 6-inch thick lifts up to a minimum level of 12-inches above the

Board Of Aldermen - Agenda - 4/12/2022 - P226

By dnadmin on Mon, 11/07/2022 - 07:45
  • Read more about Board Of Aldermen - Agenda - 4/12/2022 - P226

3.03 BACKFILL PLACEMENT AND COMPACTION:

A. GENERAL:

1.

2.

Board Of Aldermen - Agenda - 4/12/2022 - P225

By dnadmin on Mon, 11/07/2022 - 07:45
  • Read more about Board Of Aldermen - Agenda - 4/12/2022 - P225

material remaining in the bottom of the trench 1s not disturbed.

If pipe is to be laid in embankments or other recently filled areas, the fill
material shall first be placed to a height of at least 12-inches above the top of
the pipe before excavation.

Pipe trenches shall be made as narrow as practicable and shall not be widened
by scraping or loosening materials from the sides. Every effort shall be made to
keep the sides of the trenches firm and undisturbed until backfilling has been
completed.

Board Of Aldermen - Agenda - 4/12/2022 - P224

By dnadmin on Mon, 11/07/2022 - 07:45
  • Read more about Board Of Aldermen - Agenda - 4/12/2022 - P224

specified densities

3.02 EXCAVATION:

A. GENERAL:

1.

2.

The Contractor shall perform all work of any nature and description required to
accomplish the work as shown on the Drawings and as specified.

Board Of Aldermen - Agenda - 4/12/2022 - P223

By dnadmin on Mon, 11/07/2022 - 07:45
  • Read more about Board Of Aldermen - Agenda - 4/12/2022 - P223

B. The Contractor shall protect the sub-grade beneath new structures and pipes from
frost penetration when freezing temperatures are expected.

PART 2 - PRODUCTS

2.01 MATERIAL:

A. CRUSHED GRAVEL:
The Gravel Road Base will be NHDOT - Item 304.3 Crushed Gravel, or Item 304.4
Crushed Stone (Fine Gradation).

Board Of Aldermen - Agenda - 4/12/2022 - P222

By dnadmin on Mon, 11/07/2022 - 07:45
  • Read more about Board Of Aldermen - Agenda - 4/12/2022 - P222

ASTM D2922 ~=Test Methods for Density of Soil and Soil-aggregate in Place
by Nuclear Methods (Shallow Depth).

1.04 SUBMITTALS: IN ACCORDANCE WITH REQUIREMENTS OF
GENERAL SPECIFICATIONS, SUBMIT THE FOLLOWING:

Material test results performed by a certified laboratory shall be submitted to the
Engineer for all materials proposed for use on the project. If required by the
Engineer, samples shall be submitted for independent testing.

1.05 PROTECTION OF EXISTING PROPERTY:

Board Of Aldermen - Agenda - 4/12/2022 - P221

By dnadmin on Mon, 11/07/2022 - 07:45
  • Read more about Board Of Aldermen - Agenda - 4/12/2022 - P221

SECTION 02300

EARTHWORK

PART 1 - GENERAL

1.01

1.02

>

G5 Oo 8

1.03

WORK INCLUDED:

The Contractor shall make excavations of normal depth in earth for trenches and
structures, shall backfill and compact such excavations to the extent necessary,
shall furnish the necessary material and construct embankments and fills, and shall
make miscellaneous earth excavations and do miscellaneous grading.

RELATED WORK:

Section 01110, CONTROL OF WORK AND MATERIALS

Board Of Aldermen - Agenda - 4/12/2022 - P220

By dnadmin on Mon, 11/07/2022 - 07:45
  • Read more about Board Of Aldermen - Agenda - 4/12/2022 - P220

PART 3 — EXECUTION

3.01 INSTALLATION:

A. Work shall not be started until all materials and equipment necessary for their
construction are either on the site of the work or satisfactorily available for
immediate use as required.

B. _ The sheeting shall be securely and satisfactorily braced to withstand all pressures to
which it may be subjected and be sufficiently tight to minimize lowering of the
groundwater level outside the excavation.

Board Of Aldermen - Agenda - 4/12/2022 - P219

By dnadmin on Mon, 11/07/2022 - 07:45
  • Read more about Board Of Aldermen - Agenda - 4/12/2022 - P219

SECTION 02252
SUPPORT OF

EXCAVATION

PART 1 - GENERAL

1.01

A.

WORK INCLUDED:

This section of the specification covers sheeting and bracing for support of
excavations. The requirements of this section shall also apply, as appropriate, to
other methods of excavation support and underpinning which the Contractor elects to

use to complete the work.

Board Of Aldermen - Agenda - 4/12/2022 - P218

By dnadmin on Mon, 11/07/2022 - 07:45
  • Read more about Board Of Aldermen - Agenda - 4/12/2022 - P218

3. Footage counter
4. Test pressure
5. Sewer reach identification (street location, start MH and second MH)

D. PIPE DEFLECTION MEASUREMENT: