SECTION 02451

FLAGGERS AND UNIFORMED OFFICERS FOR TRAFFIC CONTROL

PART 1 - GENERAL

1.01

A.

1.02

1.03

A.

WORK INCLUDED:

This Section covers the provisions for furnishing Flaggers and Uniformed Police
Officers for Maintenance of Traffic as described in Section 01110 CONTROL OF

WORK AND MATERIALS, to direct traffic through or around work as shown on
the plans or as ordered by the Engineer.

DESCRIPTION:

Board Of Aldermen - Agenda - 4/12/2022 - P236

By dnadmin on Mon, 11/07/2022 - 07:45
  • Read more about Board Of Aldermen - Agenda - 4/12/2022 - P236

3.03 REMOVAL OF TEMPORARY EROSION CONTROL MEASURES:
A. All temporary erosion control measures shall be removed once the site has been

stabilized with final pavement, and disturbed loam and seed areas have established a
viable stand of grass.

END OF SECTION

2022 Sewer Replacement Project Erosion Control
Nashua, NH 02370-3

Board Of Aldermen - Agenda - 4/12/2022 - P235

By dnadmin on Mon, 11/07/2022 - 07:45
  • Read more about Board Of Aldermen - Agenda - 4/12/2022 - P235

C. Silt Fence:

1. Support fence: 14-gauge, 4-inch x 4-inch mesh, 36-inch-high livestock
fence.

2. Post: Post at 6'0" on center to be No. 4 rebar, 2" x 2" wood, 3/4" steel
pipe or equivalent.

Board Of Aldermen - Agenda - 4/12/2022 - P234

By dnadmin on Mon, 11/07/2022 - 07:45
  • Read more about Board Of Aldermen - Agenda - 4/12/2022 - P234

SECTION 02370

EROSION CONTROL
PART 1 —- GENERAL
1.01 WORK INCLUDED:
A. Provide temporary erosion control for the entire duration of project in accordance with
plans, specifications.
1.02 RELATED WORK:
A. Section 02300: EARTHWORK
B. Section 02745: ROAD RESTORATION
C. Section 02920: LOAMING AND SEEDING
1.03 SITE CONDITION:
A. All soil erosion and sediment control measures to be in accordance with standards and

Board Of Aldermen - Agenda - 4/12/2022 - P233

By dnadmin on Mon, 11/07/2022 - 07:45
  • Read more about Board Of Aldermen - Agenda - 4/12/2022 - P233

SECTION

2022 Sewer Replacement Project Rock Structure Excavation and Disposal
Nashua, NH 02324-5

Board Of Aldermen - Agenda - 4/12/2022 - P232

By dnadmin on Mon, 11/07/2022 - 07:45
  • Read more about Board Of Aldermen - Agenda - 4/12/2022 - P232

« Distance and direction of recording station from the area of detonation

= Date and exact time of reading

" Type of ground at recording station

= Peak particle velocity for all components as well as resultant for all
frequencies of vibrations

" Duration of motion with a velocity in excess of one thousandth of an inch
per second. A copy of the photographic record of seismograph readings
Peak air blast level.

3.04 BLASTING RECORDS:

Board Of Aldermen - Agenda - 4/12/2022 - P231

By dnadmin on Mon, 11/07/2022 - 07:45
  • Read more about Board Of Aldermen - Agenda - 4/12/2022 - P231

B. Work damaged by blasting shall be repaired or replaced at the Contractor's expense.

B. Ifrock 1s excavated beyond the limits of payment as specified, or authorized in writing
by the Engineer, the excess excavation, whether resulting from over-breakage or other
causes, shall be backfilled, by and at the expense of the Contractor, as specified below:

Board Of Aldermen - Agenda - 4/12/2022 - P230

By dnadmin on Mon, 11/07/2022 - 07:45
  • Read more about Board Of Aldermen - Agenda - 4/12/2022 - P230

B. The Contractor shall procure all permits required for blasting.

1.05 SUBMITTALS:
A. At least two weeks before beginning blasting operations, the Contractor shall submit
to the

Engineer for record the following data:

1. Name of Contractor or Subcontractor responsible for blasting and
monitoring operations and license number.

2. Name, affiliation, and license number of the person or persons who will be
directly responsible for designing each blast, supervising the loading of the
shot, and firing it.

Board Of Aldermen - Agenda - 4/12/2022 - P229

By dnadmin on Mon, 11/07/2022 - 07:45
  • Read more about Board Of Aldermen - Agenda - 4/12/2022 - P229

SECTION
02324

ROCK STRUCTURE
EXCAVATION AND DISPOSAL

PARTI-GENERAL

1.01 WORK INCLUDED:
The Contractor shall excavate rock, if encountered, to the lines and grades indicated in
the specifications or as directed, shall dispose of the excavated material, and shall
furnish the required material as specified in Section 02300 EARTHWORK for backfill
in place of the excavated rock.

1.02 RELATED WORK:
A. Section 02300, EARTHWORK
B. Section 02252, SUPPORT OF
EXCAVATION

1.03 DEFINITIONS:

Board Of Aldermen - Agenda - 4/12/2022 - P228

By dnadmin on Mon, 11/07/2022 - 07:45
  • Read more about Board Of Aldermen - Agenda - 4/12/2022 - P228

to meet the requirements of this specification.

2. Contractor shall use extra care when compacting adjacent to pipes and drainage
structures. Backfill and compaction shall proceed along sides of drainage
structures so that the difference in top of fill level on any side of the structure
shall not exceed two feet (2') at any stage of construction.