Finance Committee - Agenda - 7/6/2016 - P85
Exhibit A
Nashua - Crown Street Park & Ride Project
Scope of Work and Task Descriptions
June 15, 2016
d. Fill the casing with water to a depth of 24 inches and allow to pre-soak for 24 hours;
e. After pre-soaking, refill the casing with 24 inches of water and record the drop in
water level from the top of the casing at the end of one hour;
f. Divide the drop in water elevation by one hour to obtain the infiltration rate for the
given observation;