Finance Committee - Agenda - 5/3/2016 - P16
B. Under ITEM E (ALT) — PROTECTIVE SURFACING (RUBBER TILES), remove specification. This
material will not be used.
ITEM “E(ALT)’ — PROTECTIVE SURFACING (RUBBER TILES)
A. SCOPE
This work shall consist of installation of a protective surface material at the location(s) shown on the
layout plan per the detail of the plan set provided or as ordered by the Engineer.
B. MATERIALS AND CONSTRUCTION
The Contractor shall supply all labor, materials, equipment and transportation necessary for the required