Division 9 — Construction Specifications
Legacy Playground at Labine Park

As Amended per Addendum # 2 issued March 24, 2016

ITEM ‘E’ — PROTECTIVE SURFACING (POURED-IN PLACE RUBBER)

A. SCOPE

This work shall consist of installation of a protective surface material at the location(s) shown
on the layout plan per the detail of the plan set provided or as ordered by the Engineer.

B. MATERIALS AND CONSTRUCTION

Finance Committee - Agenda - 5/3/2016 - P155

By dnadmin on Mon, 11/07/2022 - 09:54
  • Read more about Finance Committee - Agenda - 5/3/2016 - P155

Division 9 — Construction Specifications
Legacy Playground at Labine Park

As Amended per Addendum # 2 issued March 24, 2016

ITEM ‘D’ — ELEMENT FOOTING (SIZE VARIES)
A. SCOPE

This work shall consist of installing and providing footings following the detail sheet of the plan
set provided or as ordered by the Engineer. This work may require coordination with a
community build day. See Item H for element type and specifications.

B. MATERIALS AND CONSTRUCTION

Finance Committee - Agenda - 5/3/2016 - P154

By dnadmin on Mon, 11/07/2022 - 09:54
  • Read more about Finance Committee - Agenda - 5/3/2016 - P154

Division 9 — Construction Specifications
Legacy Playground at Labine Park

As Amended per Addendum # 2 issued March 24, 2016

ITEM ‘C’ —- LOAM AND SEED (4" DEPTH)
A. SCOPE

This work shall consist of installation of loam and seed at the location(s) shown on the layout
plan or as ordered by the Engineer.

B. MATERIALS AND CONSTRUCTION

The Contractor shall supply all labor, materials, equipment and transportation necessary for the
required work. The loam shall be a minimum of 4” in depth.

C. MEASUREMENT AND PAYMENT

Finance Committee - Agenda - 5/3/2016 - P153

By dnadmin on Mon, 11/07/2022 - 09:54
  • Read more about Finance Committee - Agenda - 5/3/2016 - P153

Division 9 — Construction Specifications
Legacy Playground at Labine Park

As Amended per Addendum # 2 issued March 24, 2016

ITEM ‘B’ — STONE DUST PATHWAY (4” DEPTH)
A. SCOPE

This work shall consist of installation of a stone dust walkway at the location(s) shown on the
layout plan per the detail of the plan set provided or as ordered by the Engineer.

B. MATERIALS AND CONSTRUCTION

Finance Committee - Agenda - 5/3/2016 - P152

By dnadmin on Mon, 11/07/2022 - 09:54
  • Read more about Finance Committee - Agenda - 5/3/2016 - P152

Division 9 — Construction Specifications
Legacy Playground at Labine Park

As Amended per Addendum # 2 issued March 24, 2016

ITEM ‘A (ALT)’ — COBBLESTONE PAVER (OPTION TO REPLACE STAMPED
CONCRETE)

A. SCOPE

This work shall consist of installation of a cobblestone paver walkway at the location(s) shown
on the layout plan or as ordered by the Engineer. The contractor shall submit a sample of the
proposed paver to be used and installation specifications for approval prior to construction.

B. MATERIALS AND CONSTRUCTION

Finance Committee - Agenda - 5/3/2016 - P151

By dnadmin on Mon, 11/07/2022 - 09:54
  • Read more about Finance Committee - Agenda - 5/3/2016 - P151

Division 9 — Construction Specifications
Legacy Playground at Labine Park

As Amended per Addendum # 2 issued March 24, 2016

ITEM ‘A’ — STAMPED CONCRETE WALKWAY (6") (COBBLESTONE PATTERN)
A. SCOPE

This work shall consist of installation of a stamped concrete walkway at the location(s) shown
on the layout plan per the detail of the plan set provided or as ordered by the Engineer.

B. MATERIALS AND CONSTRUCTION

Finance Committee - Agenda - 5/3/2016 - P150

By dnadmin on Mon, 11/07/2022 - 09:54
  • Read more about Finance Committee - Agenda - 5/3/2016 - P150

Division 9 — Construction Specifications
Legacy Playground at Labine Park

As Amended per Addendum # 2 issued March 24, 2016

Finance Committee - Agenda - 5/3/2016 - P149

By dnadmin on Mon, 11/07/2022 - 09:54
  • Read more about Finance Committee - Agenda - 5/3/2016 - P149

DIVISION 9
CONSTRUCTION
SPECIFICATIONS

As Amended per Addendum # 2 issued March 24, 2016

Finance Committee - Agenda - 5/3/2016 - P148

By dnadmin on Mon, 11/07/2022 - 09:54
  • Read more about Finance Committee - Agenda - 5/3/2016 - P148

CONSENT OF SURETY FOR FINAL PAYMENT

OWNER's Project No.:
Project:
Amount of Contract (including
Type of Contract: Change Orders):
CONTRACTOR:
Contract For: Contract Date:

In accordance with the provisions of the above named contract between the OWNER and the
CONTRACTOR, the following named Surety Company:

On the Payment Bond of the following named CONTRACTOR:

Finance Committee - Agenda - 5/3/2016 - P147

By dnadmin on Mon, 11/07/2022 - 09:54
  • Read more about Finance Committee - Agenda - 5/3/2016 - P147

Executed by ENGINEER on

20

(ENGINEER)

By:

(Authorized Signature)

CONTRACTOR accepts this Certificate of Final Completion on 20
(CONTRACTOR)
By:
(Authorized Signature)
OWNER accepts this Certificate of Final Completion on 20

(For the City of Nashua)

(Authorized Signature)

2 of 2
Certificate of Final Completion