Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Agenda

Agenda

Finance Committee - Agenda - 5/3/2016 - P166

By dnadmin on Mon, 11/07/2022 - 09:54
  • Read more about Finance Committee - Agenda - 5/3/2016 - P166

Division 9 — Construction Specifications
Legacy Playground at Labine Park

As Amended per Addendum # 2 issued March 24, 2016

ITEM ‘F’ - ENGINEERED WOOD CHIPS
A. SCOPE

This work shall consist of installation of engineered wood chips at the location(s) shown on the
layout plan per the detail of the plan set provided or as ordered by the Engineer.

B. MATERIALS AND CONSTRUCTION

Finance Committee - Agenda - 5/3/2016 - P165

By dnadmin on Mon, 11/07/2022 - 09:54
  • Read more about Finance Committee - Agenda - 5/3/2016 - P165

Gamehme;

PART 5 - INSTALLATION (Continued)

ADA Rolled - This is the type of edge to meet the requirements of ASTM 1951, Specifications
for Determination of Accessibility of Surface Systems Under and Around Playground Equipment.
The rolled edge will require additional materials in order to provide adequate ADA Wheelchair
access. The total linear feet of the pad will need to be provided if the whole site is to be ADA
compliant.

Finance Committee - Agenda - 5/3/2016 - P164

By dnadmin on Mon, 11/07/2022 - 09:54
  • Read more about Finance Committee - Agenda - 5/3/2016 - P164

PART 5 - INSTALLATION:

Weather Conditions. - Because the polyurethane agents are moisture or heat sensitive, the
nighttime temperatures must be above 40 degrees with daytime temperatures around 50
degrees. These temperatures must be consistent for several days before and after the poured
rubber installation period. Complying with these weather conditions will prevent poured rubber

from freezing which prevents proper curing.

Finance Committee - Agenda - 5/3/2016 - P163

By dnadmin on Mon, 11/07/2022 - 09:54
  • Read more about Finance Committee - Agenda - 5/3/2016 - P163

Gamelhme;

PART 3 -SUB-BASE TYPES & DETAILS (Continued)

Stone Graduation U.S. Sieve Percent Passing

1" 100
3/4" 90 - 100
No. 4 35 - 60
No. 30 10- 30
No. 200 2-9

Finance Committee - Agenda - 5/3/2016 - P162

By dnadmin on Mon, 11/07/2022 - 09:54
  • Read more about Finance Committee - Agenda - 5/3/2016 - P162

ie |

PART 2 - MATERIAL DATA (Continued)

Colors - The color of GT Impax recycled poured rubber surfacing will be indicated on plans.
Owner or owner's representative will be responsible for selecting standard blends. Selection of
either standard color blends or custom color blends must be made at time quotation is being
requested. EPDM/TPV colors are available in 100% black and a variety of colors. Ask your
GameTime representative for available color combinations.

Finance Committee - Agenda - 5/3/2016 - P161

By dnadmin on Mon, 11/07/2022 - 09:54
  • Read more about Finance Committee - Agenda - 5/3/2016 - P161

PSI and minimum % elongation @ break of 140%.

IPEMA Certification: Manufacturer must provide proof of certification. “In the interest of
public playground safety, IPEMA provides an independent laboratory which validates a
manufacturer's certification of conformance to ASTM F1292-04. A list of current validated
products, their thickness and critical heights may be viewed at www.ipema.org.”

Submittal Details:

Finance Committee - Agenda - 5/3/2016 - P160

By dnadmin on Mon, 11/07/2022 - 09:54
  • Read more about Finance Committee - Agenda - 5/3/2016 - P160

Poured in Place
Product Specification

PART 1 - GENERAL

Work Details:

This work includes furnishing and installing GT Impax recycled poured rubber surfacing.

Finance Committee - Agenda - 5/3/2016 - P159

By dnadmin on Mon, 11/07/2022 - 09:54
  • Read more about Finance Committee - Agenda - 5/3/2016 - P159

Division 9 — Construction Specifications
Legacy Playground at Labine Park

As Amended per Addendum # 2 issued March 24, 2016

3.03

3.04

Surface Preparation: Using a brush or short nap roller, aoply primer to the substrate
perimeter and any adjacent vertical barriers (such as playground equipment) at the rate
of 300 ft2/gal.

INSTALLATION

Finance Committee - Agenda - 5/3/2016 - P158

By dnadmin on Mon, 11/07/2022 - 09:54
  • Read more about Finance Committee - Agenda - 5/3/2016 - P158

Division 9 — Construction Specifications
Legacy Playground at Labine Park

As Amended per Addendum # 2 issued March 24, 2016

1.08

WARRANTY

Playground surface shall maintain required impact attenuation characteristics and be
guaranteed against defects in workmanship and materials for a period of no less than five
years from date of completion of work. Maintenance requirements must be maintained
for duration of warranty period.

PART 2 — Products

A.

2.01

2.02

Finance Committee - Agenda - 5/3/2016 - P157

By dnadmin on Mon, 11/07/2022 - 09:54
  • Read more about Finance Committee - Agenda - 5/3/2016 - P157

Division 9 — Construction Specifications
Legacy Playground at Labine Park

As Amended per Addendum # 2 issued March 24, 2016

oO
Ow

T~TA™M™OANBPer

1.04

w

1.05

1.06

1.07

ASTM D2047 Standard Test Method for Static Coefficient of Friction of Polish-Coated
Floor Surfaces as Measured by the James Machine.

ASTM D2859 Standard Test Method for Flammability of Finished Textile Floor Covering
Materials.

Pagination

  • Previous page ‹‹
  • Page 1478
  • Next page ››
Subscribe to Agenda

Footer menu

  • Contact