Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Agenda

Agenda

Finance Committee - Agenda - 12/6/2017 - P51

By dnadmin on Mon, 11/07/2022 - 10:18
  • Read more about Finance Committee - Agenda - 12/6/2017 - P51

WASTEWATER PLANNING, DESIGN, AND

CONSTRUCTION MANAGEMENT
department of conservation anc recreation

The Metropolitan District Commission - Division
of Watershed Management (DWM), now the
Department of Conservation and Recreation
(DCR), selected Weston & Sampson. to prepare
a comprehensive wastewater facilities plan for
the communities of West Boy!ston and Hoiden.
The overall project objective was to provide a &
framework to protect and preserve the water ®
quality in the Wachusett Reservoir watershed. i

Finance Committee - Agenda - 12/6/2017 - P50

By dnadmin on Mon, 11/07/2022 - 10:18
  • Read more about Finance Committee - Agenda - 12/6/2017 - P50

CONTROLS AND SCADA UPGRADE

FOR WATER SYSTEM

town of salisbury, massachusetts

BE Gaal Tar Ve su}

TANK RTU ALARMS

Weston & Sampson pianned and designed a complete Controls and SCADA
Upgrade for the Town of Salisbury Water System. Prior to the upgrade, operators
lost sleep during every storm worried that controls would fail or they would have
to rob one panel of components to fix a more critical one. Our design included
replacement of obsolete controllers, out-of-cornpliance radios, and aged SCADA
software and PC.

Finance Committee - Agenda - 12/6/2017 - P49

By dnadmin on Mon, 11/07/2022 - 10:18
  • Read more about Finance Committee - Agenda - 12/6/2017 - P49

WATER AND WASTEWATER SCADA

IMPROVEMENTS
city of peabody, massachuseits

- errs eAORUIT

Weston & Sampson has long history designing SCADA improvements for the City
of Peabody. As design engineer for a new Trident filtration water treatment system in
1996, we engineered a water SCADA system to monitor two treatment plants. Since
then, we have engineered improvements to the water treatment plants and water
system, including significant SCADA system upgrades.

Finance Committee - Agenda - 12/6/2017 - P48

By dnadmin on Mon, 11/07/2022 - 10:18
  • Read more about Finance Committee - Agenda - 12/6/2017 - P48

SOUTHBRIDGE WATER TREATMENT PLANT

SCADA IMPROVEMENTS

town of southbridge, massachusetts

Finance Committee - Agenda - 12/6/2017 - P47

By dnadmin on Mon, 11/07/2022 - 10:18
  • Read more about Finance Committee - Agenda - 12/6/2017 - P47

| For more information, contact:
Robert A. Goober, PE,

SCADA
uF Ee FE { Director of Marketing, Weston & Sampson

instrumentation and controls provider | (800) SAMPSON | gooberr@wseinc.com

w Planning

= Design
Construction/instaliation
w Integration

m PLC and SCADA programming
ws Start-up and training

a Implementation

a Maintenance

a Optimization

a Phased appreaches

a Design/build services
# Energy conservation

Data management

Finance Committee - Agenda - 12/6/2017 - P46

By dnadmin on Mon, 11/07/2022 - 10:18
  • Read more about Finance Committee - Agenda - 12/6/2017 - P46

SCOPE AND APPROACH

Note: The scope of work does not include production of as-built construction documents in CAD or other electronic
format.

Phase 005 Total: 12 hours

SCOPE EXCLUSIONS AS STATED BY CITY

The following items in the original scope of work issued by the City of Nashua were removed from consideration
pursuant to the updated scope email received October 26, 2017 from the City of Nashua:

Finance Committee - Agenda - 12/6/2017 - P45

By dnadmin on Mon, 11/07/2022 - 10:18
  • Read more about Finance Committee - Agenda - 12/6/2017 - P45

ert RIS SCOPE AND APPROACH

1. Installation of fiber optic media (2 days)

2. Installation of conduit and wiring (7 days)

3. Installation of control panel (5 days)

4. Modifications to control panels and existing SCADA system network components (4 days)
5. Miscellaneous (ceiling tiles, punchlist, etc.) (2 days)

Phase 002 Total: 20 days of inspection x 6 hours = 120 hours

PHASE 003 INITIAL START-UP

Finance Committee - Agenda - 12/6/2017 - P44

By dnadmin on Mon, 11/07/2022 - 10:18
  • Read more about Finance Committee - Agenda - 12/6/2017 - P44

rae SCOPE AND APPROACH

In October 2017, the City of Nashua solicited public bids for the construction of Wastewater Facility SCADA
Systems Upgrades. Electrical Installations, Inc. (El!) of Moultonborough, New Hampshire, was the apparent low
bidder with a bid of $588,000. The city utilized a consultant for the design of these improvements but has elected
to retain another consultant for construction administration (CA) services.

Finance Committee - Agenda - 12/6/2017 - P43

By dnadmin on Mon, 11/07/2022 - 10:18
  • Read more about Finance Committee - Agenda - 12/6/2017 - P43

November 14, 2017

Weston (&) Sampson

100 International Drive, Suite 152, Portsmouth, NH 03801
Tel: 603.431.3937

Mr. William Keating, P.E.

Wastewater Project Engineer
9 Riverside Street

EXHIBIT A

Nashua, NH 03062
Sent via Email: keatingw@nashuanh.gov

Re:

Wastewater Treatment Facility SCADA Upgrades

Dear Mr. Keating:

Finance Committee - Agenda - 12/6/2017 - P42

By dnadmin on Mon, 11/07/2022 - 10:18
  • Read more about Finance Committee - Agenda - 12/6/2017 - P42

PART II - PRICE SUMMARY

COMPETITOR'S CATALOG LISTINGS, IN-HOUSE ESTIMATES, PRIOR QUOTES MARKET PROPOSED

13, (Indicate basis for price comparison) PRICE (S) PRICE

PART IV - DIRECT LABOR BY CATEGORY

14. INSERT THE APPROPRIATE WORK CATEGORY IN THE TABLE BELOW. WORK CATEGORIES WOULD INCLUDE BUT
NOT BE LIMITED TO THOSE CATEGORIES SHOWN IN THE CONTRACT DOCUMENTS SUCH AS DESIGN, SURVEY,
SUBSURFACE, CADASTRAL, O&M MANUAL, ADMINISTRATION, INSPECTION, RECORD DWGS, START-UP, SPECIAL
SERVICES, ETC.

Pagination

  • Previous page ‹‹
  • Page 1408
  • Next page ››
Subscribe to Agenda

Footer menu

  • Contact