Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Agenda

Agenda

Finance Committee - Agenda - 11/15/2017 - P166

By dnadmin on Mon, 11/07/2022 - 10:18
  • Read more about Finance Committee - Agenda - 11/15/2017 - P166

Project Number: 228730 WWYTEFE SCADA Upgrades
Issue Date: AugustSeptember 2017 Nashua, NH

FL

KJ.

El. ALTERNATE 1 (perform only if awarded by Owner): Replace ceiling in

thickening room with ceiling tiles as specified in Section 09 51 00 and as
indicated in the General Notes on Drawing E-003.

Finance Committee - Agenda - 11/15/2017 - P165

By dnadmin on Mon, 11/07/2022 - 10:18
  • Read more about Finance Committee - Agenda - 11/15/2017 - P165

Project Number: 228730 WWYTE SCADA Upgrades

Issue Date: AugustSeptember 2017 Nashua, NH
B. Install minimum one 4)-++*_l-inch conduit, or as otherwise noted or detailed on

the Contract Drawings, from accessible ceiling space to each outlet indicated.

Provide and install required conduit wire, pullboxes, and accessory items to
accomplish the work involved in providing the new network service as shown on
the Drawings. All boxes, raceways, equipment, etc. shall be bonded in accordance
with NEC.

Coordinate service work with the Owner.

Finance Committee - Agenda - 11/15/2017 - P164

By dnadmin on Mon, 11/07/2022 - 10:18
  • Read more about Finance Committee - Agenda - 11/15/2017 - P164

Project Number: 228730 WWYTEFE SCADA Upgrades
Issue Date: AugustSeptember 2017 Nashua, NH

e Intrusion Protection capabilities

f. Network Address Translation (NAT)

g. NBAR protocol filtering

h Access Control Lists (ACL)

Quality of Services (QOS) for prioritization

_.

3. Unit shall be Cisco model ASA5506-K9 or approved equal.
4. Provide Cisco model ASA5506-RACK-MNT rack mounting unit

5. Provide Tofino Xenon Xe-02-00-T1-T1-T-DD-Z9-000V for use in main
panel.

Finance Committee - Agenda - 11/15/2017 - P163

By dnadmin on Mon, 11/07/2022 - 10:18
  • Read more about Finance Committee - Agenda - 11/15/2017 - P163

Project Number: 228730 WWYTEFE SCADA Upgrades
Issue Date: AugustSeptember 2017 Nashua, NH

B. Rack Mounted Patch Panels
1. CAT6 Patch Panels

a. Provide one (1) 48 port CAT6 patch panel designed to bolt in the
equipment rack assembly. Units shall be provided with full
complement (48 modules) of CAT6 cable termination modules.
Provide ports as required for installed cables, plus 10% spare.

b. Modules shall be labeled in front with room location number.
C. Modules shall be color coded “YELLOW” to match SCADA
cables.

Finance Committee - Agenda - 11/15/2017 - P162

By dnadmin on Mon, 11/07/2022 - 10:18
  • Read more about Finance Committee - Agenda - 11/15/2017 - P162

Project Number: 228730

WWYTE SCADA Upgrades

Issue Date: AugustSeptember 2017 Nashua, NH
G. SCADA Category 6 Cables

1.

Furnish and install CAT6 four pair, 24 AWG annealed copper, UTP cables
with PVC jackets at all locations indicated on the Drawings.

All cables shall be "YELLOW?” in color.

All cables shall be terminated and tested at the equipment rack, and at the
opposite termination point.

H. SCADA Fiber Optic Cable

1.

Finance Committee - Agenda - 11/15/2017 - P161

By dnadmin on Mon, 11/07/2022 - 10:18
  • Read more about Finance Committee - Agenda - 11/15/2017 - P161

Project Number: 228730 WWYTE SCADA Upgrades

Issue Date: AugustSeptember 2017 Nashua, NH
C. The contractor shall be responsible for running all wiring/cable for the data

E.

Finance Committee - Agenda - 11/15/2017 - P160

By dnadmin on Mon, 11/07/2022 - 10:18
  • Read more about Finance Committee - Agenda - 11/15/2017 - P160

Project Number: 228730 WWYTE SCADA Upgrades

Issue Date: AugustSeptember 2017 Nashua, NH
1.03 ADMINISTRATIVE REQUIREMENTS

A. Coordination, Sequencing, and Scheduling: per Division 01 General

Requirements.
1.04 SUBMITTALS

A. Submit in accordance with the Division 01 General Requirements.

A-B. Provide manufacturer's product data, test reports, and materials certifications.

Finance Committee - Agenda - 11/15/2017 - P159

By dnadmin on Mon, 11/07/2022 - 10:18
  • Read more about Finance Committee - Agenda - 11/15/2017 - P159

Project Number: 228730 WWYTEFE SCADA Upgrades
Issue Date: AugustSeptember 2017 Nashua, NH

SECTION 27 00 00

COMMUNICATIONS
PART 1 - GENERAL
1.01 SUMMARY
A. Furnish, install, test and make ready for operation; complete data communications

system as specified herein and as shown on the Drawings. The data system shall
include but are not limited to the following:

Finance Committee - Agenda - 11/15/2017 - P158

By dnadmin on Mon, 11/07/2022 - 10:18
  • Read more about Finance Committee - Agenda - 11/15/2017 - P158

Project Number: 228730 WWTEF SCADA Upgrades
Issue Date: September 2017 Nashua, NH

3. Seal all joints around pipes, ducts, or electrical outlets penetrating the
ceiling. Apply a continuous ribbon of acoustical sealant on vertical web of
wall or edge moldings.

Finance Committee - Agenda - 11/15/2017 - P157

By dnadmin on Mon, 11/07/2022 - 10:18
  • Read more about Finance Committee - Agenda - 11/15/2017 - P157

Project Number: 228730 WWTEF SCADA Upgrades
Issue Date: September 2017 Nashua, NH

2.06

SOURCE QUALITY CONTROL

A.

Provide in accordance with Division 01 General Requirements.

PART 3 — EXECUTION

3.01

INSTALLATION

A.

Pagination

  • Previous page ‹‹
  • Page 1391
  • Next page ››
Subscribe to Agenda

Footer menu

  • Contact