Finance Committee - Agenda - 11/15/2017 - P176
UW
22x34 SHEET
1:0.94614
SO0002.dwg, Sep 27, 2017 — 3:35pm
| ucturel\ 228730
\\woodardcurran.net\shared\Projects\228730 Nashua Wastewater\wip \Drawings\
| EQUIPMENT-SIZE PER VENDOR
UW
22x34 SHEET
1:0.94614
SO0002.dwg, Sep 27, 2017 — 3:35pm
| ucturel\ 228730
\\woodardcurran.net\shared\Projects\228730 Nashua Wastewater\wip \Drawings\
| EQUIPMENT-SIZE PER VENDOR
22x34 SHEET
ae
5 4 5 6 1:0.94612
LE
Z
wn Ww.
Ec
eB |e
° Lu 5
2 a
c ao Su
S ow |<
— > a
a oe Ze
es SO [2
© > 6
s - ee
S me | Se
A“ = o Ca
S Ee Ss
—
st - = ar
a) ~— Ee
z= o 3 <i
= — a
Qa = E O=
ce N = OE
2s o Lu =D
< a“ Oo
sot = ae
oO <@ © — OF
Ss = |r
Tee = “Zz
- 9906 O WO
= G co Oo Oe
LO
OL
£6
Tr
1 2
22x34 SHEET
1:0.94963
ite Plans\DRAWINGS\E—007.dwg, Sep 27, 2017 — 3:37pm
(OO
\\woodardcurran.net\shared\Projects\228730 Nashua Wastewater\wip \Drawings\
GENERAL NOTES:
1.
THIS DRAWING IS A COMPILATION OF THE FOLLOWING RECORD DRAWING SETS:
1985 CDM UPGRADE SHT E-9, E-—27 & E-—30
1998 S&W DIGESTER ELECTRICAL SITE PLAN SHT E-3, E-6, E-10, E-11 & E-13
1999 S&W EMERGENCY GENERATOR UPGRADE SHT E-2
2006 M&E WET WEATHER SITE PLAN SHT E-2, E-5 & E-9
5
6
22x34 SHEET
1:1
SCRUBBER
PANEL
POLYMER
PANEL
JUNCTION JUNCTION
PANEL #1 PANEL #2
FIBER
OPTIC JUNCTION
SWITCH BOX
PANEL
YL, ZZ
om ©
OD
LLLLLL]
oe /
EXISTING CONSOLE
©
EXISTING
SCADA
PANEL
(PLC—1B)
©
DEMOLITION
DEMOLITION KEYED NOTES:
1. REMOVE OPERATOR INTERFACE TERMINAL FROM CONSOLE AND INSTALL ON CP—150
AS DESIGNED. DEMOLISH CONSOLE AND ALL ATTACHED ITEMS.
Project Number: 228730 WWTEF SCADA Upgrades
Issue Date: AugustSeptember 2017 Nashua, NH
3.06 CLOSEOUT ACTIVITIES
A. Provide in accordance with Division 01 General Requirements.
END OF SECTION
ADDENDUM NO. 3 CONTROL SYSTEM EQUIPMENT PANELS AND RACKS
WOODARD & CURRAN 40 67 00-15 (3)
Project Number: 228730 WWTEF SCADA Upgrades
Issue Date: AugustSeptember 2017 Nashua, NH
C.
Demolition and Concrete Work
Project Number: 228730 WWTE SCADA Upgrades
Issue Date: AugustSeptember 2017 Nashua, NH
L. Nameplates
1. All panels and panel devices shall be supplied with suitable nameplates
3.02
3.03
that identify the panel and individual devices as required. Each device
nameplate shall include up to 3 lines, with the first line containing the
device tag number as shown on the Drawings, the second line containing a
functional description, and the third line containing a functional control
description.
Project Number: 228730
Issue Date: AucustSeptember 2017
WWTE SCADA Upgrades
Nashua, NH
PART 2 — PRODUCTS
2.01 CONTROL PANEL COMPONENTS
A.
The following table contains control panel components and recommended
manufacturers for each component.
Project Number: 228730 WWYTEFE SCADA Upgrades
Issue Date: AugustSeptember 2017 Nashua, NH
This page intentionally left blank
ADDENDUM NO. 3 COMMUNICATIONS
WOODARD & CURRAN 27 00 00-10 _(3)
Project Number: 228730 WWYTE SCADA Upgrades
Issue Date: AugustSeptember 2017 Nashua, NH
6-033.03 LABELING REQUIREMENTS
€A.__ Number both ends of each cable with labels of waterproof materials and indelible
ink text information, using either mechanical or waterproof adhesive attachment.
6-043.04 GROUNDING REQUIREMENTS
A. Wherever necessary extend service equipment ground using min. #6 AWG
copper. In exposed locations, install ground wire in EMT. Bond all
communications raceway to form a continuous path to ground.