Finance Committee - Agenda - 11/15/2017 - P226
C-1.17
may take possession of and utilize in completing the work, such materials, appliances,
and plant as may be on the site of the work and necessary therefore.
C-1.17
may take possession of and utilize in completing the work, such materials, appliances,
and plant as may be on the site of the work and necessary therefore.
21.
22.
C-1.16
a. Subsurface or latent physical conditions at the site differing materially
from those indicated in this contract; or,
b. Unknown physical conditions at the site, differing materially from those
ordinarily encountered and generally recognized as inherent in the type of work
provided for in this contract.
19.
20.
C-1.15
and ascertaining the actual damages the Owner would in such event sustain. Said amount
is agreed to be the amount of damages which the Owner would sustain and said amount
shall be deducted from time to time by the owner from current periodical payments.
15.
16.
17.
C-1.13
b. Work done in the absence of the Engineer or his agent may be ordered by
the Engineer to be uncovered or dismantled.
c. Should the work thus exposed or examined prove satisfactory, the
uncovering or dismantling and the replacement of material and rebuilding of the
work shall be considered as “Extra Work” to be processed in accordance with
article 17.
14.
C-1.12
Engineer by the Contractor. The person so designated shall be available by phone during
nonworking hours.
13.3. In case of emergency which threatens loss or injury of property, and/or safety of
life, the Contractor is allowed to act, without previous instructions from the Engineer. He
shall notify the Engineer immediately thereafter. Any claim for compensation by the
Contractor due to such extra work shall be promptly submitted in writing to the Engineer
for approval.
10.
C-1.10
9.2 License and/or royalty fees for the use of a process used in wastewater plant
design which is authorized by the Owner for the project, must be reasonable, and paid to
the holder of the patent, or his authorized licensee.
C-1.9
timely notice of readiness. The Contractor will then furnish the Engineer with the
required certificates of inspection, testing or approval.
7.9 Inspections, tests, or approvals by the engineer or others shall not relieve the
Contractor from obligations to perform the Work in accordance with the requirements of
the Contract Documents.
“Or Equal” Clause, Substitutions and Contractor Options.
7.7
C-1.8
a. The Engineer shall have the cooperation and assistance of the Contractor
and the producer with whom he has contracted for materials.
b. The Engineer shall have full entry at all reasonable times to such areas as
may concern the manufacture or production of the materials being furnished.