Finance Committee - Agenda - 11/15/2017 - P236
Al.
42.
43.
44.
C-1.27
his last given address, or delivered in person to the Contractor or his authorized
representative on the work.
Al.
42.
43.
44.
C-1.27
his last given address, or delivered in person to the Contractor or his authorized
representative on the work.
38.
39.
AO.
C-1.26
37.1 Prior to issuing the Notice to Proceed, the Owner shall legally obtain all lands and
rights-of-way necessary for carrying out and completing the work to be performed under
this contract.
37.2. The Contractor shall not (except after written consent from the Owner) enter or
occupy with men, tools, materials, or equipment, any land outside the rights-of-way or
property of the Owner. A copy of the written consent shall be given to the Engineer.
33.
C-1.24
Authority of the Engineer. In performing his duties, the Engineer or his representative
shall:
29.
30.
31.
32.
C-1.23
and named on the current list of "Surety Companies Acceptable on Federal Bonds" as
published in the Treasury Department Circular Number 570. The expense of these Bonds
shall be borne by the Contractor.
28.
C-1.22
If blasting or demolition or both is required by the contract, the Contractor or Subcon-
tractor shall obtain the respective coverage and shall furnish the Engineer a certificate of
insurance evidencing the required coverages prior to commencement of any operations
involving blasting or demolition or both.
27.3. The Contractor shall procure and shall maintain during the life of this contract
comprehensive automobile liability insurance to include all motor vehicles including
owned, hired, borrowed and non-owned vehicles.
26.
27.
C-1.21
liens, guaranteeing payment of all such disputed amounts, including all related costs and
interest in connection with said disputed indebtedness or liens which the Owner may be
compelled to pay upon adjudication.
25.
C-1.20
each such payment interest at an annual rate of 10% commencing on the first day after
said payment is due and continuing until the payment is received by the Contractor.
Acceptance and Final Payment provisions shall be as follows:
25.1 Substantial completion and payment.
23.
24.
C-1.18
made by Change Order to compensate the Contractor for the costs and delays necessarily
caused by the failure of the Owner or Engineer.
Construction Schedule and Periodic Estimates shall provide for the following:
23.1 Before starting the work or upon request by the Engineer during its progress, the
Contractor shall submit to the Engineer a work plan showing construction methods and
the various steps he intends to take in completing the work.