Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Agenda

Agenda

Finance Committee - Agenda - 3/17/2021 - P534

By dnadmin on Mon, 11/07/2022 - 13:46
  • Read more about Finance Committee - Agenda - 3/17/2021 - P534

SECTION 02550
GEOMEMBRANE
PART 1 - GENERAL
11 SCOPE OF WORK

A. CONTRACTOR shall furnish all labor, materials, tools, equipment, and
incidentals, and perform all operations necessary to furnish, deploy, seam, and
test the textured, high-density polyethylene (HDPE) Geomembrane
(Geomembrane) as described in this Specification and where indicated in the
Drawings.

12 DEFINITIONS

A. Geomembrane Manufacturer: The party responsible for the manufacturing of
the Geomembrane liner material.

Finance Committee - Agenda - 3/17/2021 - P533

By dnadmin on Mon, 11/07/2022 - 13:46
  • Read more about Finance Committee - Agenda - 3/17/2021 - P533

The Contractor shall cover areas of exposed waste at the end of each day
with approved daily/intermediate cover or natural soils, which may be
obtained from on-site sources.

During the work, the Contractor shall regularly check for odors in the down-
wind direction and employ additional odor neutralizing agent if odors are
detected.

Finance Committee - Agenda - 3/17/2021 - P532

By dnadmin on Mon, 11/07/2022 - 13:46
  • Read more about Finance Committee - Agenda - 3/17/2021 - P532

SECTION 02350

ODOR CONTROL DURING CONSTRUCTION

PART 1 - GENERAL

11 SCOPE OF WORK

A.

The Contractor shall perform its work so that odors are limited to the
immediate working area during construction activities involving excavation
in waste.

Should the Contractor fail to control odors, additional methods to prevent
off-site detection of odors shall be performed by the Contractor at no cost to
the Owner.

Additional odor controls methods include using neutralizing agents and a
portable misting system.

Finance Committee - Agenda - 3/17/2021 - P531

By dnadmin on Mon, 11/07/2022 - 13:46
  • Read more about Finance Committee - Agenda - 3/17/2021 - P531

Specification 002275 — Nonwoven Geotextile Page 2 of 2
January 2021 3066.21

PART 3 - EXECUTION
3.1 INSTALLATION

A. Nonwoven geotextiles shall be installed in accordance with the manufacturer’s
recommendations, as shown on the Drawings, and specified herein.

B. Nonwoven geotextiles shall be overlapped by at least 12 inches.

C. All holes and tears in nonwoven geotextiles shall be noted and repaired.

[END OF SECTION 02275]

P:\3000s\3066.21\Source Files\Tech Specs \ Division 2 Specifications\Section 02275 Nonwoven Geotextile.docx

Finance Committee - Agenda - 3/17/2021 - P530

By dnadmin on Mon, 11/07/2022 - 13:46
  • Read more about Finance Committee - Agenda - 3/17/2021 - P530

SECTION 02275
NONWOVEN GEOTEXTILE
PART 1 - GENERAL
11 SCOPE OF WORK

A. Furnishing and installation of a nonwoven geotextile for placement in the
areas indicated on the Drawings.

12 SUBMITTALS

A. CONTRACTOR shall submit to ENGINEER the manufacturer’s technical
information of the proposed nonwoven geotextile.

PART 2 - PRODUCTS
2.1 NONWOVEN GEOTEXTILE

Finance Committee - Agenda - 3/17/2021 - P529

By dnadmin on Mon, 11/07/2022 - 13:46
  • Read more about Finance Committee - Agenda - 3/17/2021 - P529

Specification 02200 - Earthwork Page 3 of 3
January 2021 3066.21

3.4 QUALITY AND OVERSIGHT
A. ENGINEER does not have to be present, and does not supervise or direct of the
actual Work by CONTRACTOR, his/her employees, or agents. Neither the
presence of ENGINEER nor any observations and testing performed by

ENGINEER shall excuse CONTRACTOR from defects discovered in their Work.

[END OF SECTION 02200]

P:\3000s\3066.21\Source Files\Tech Specs\ Division 2 Specifications\Section 02200 Earthwork.doc

SANBORN HEAD

Finance Committee - Agenda - 3/17/2021 - P528

By dnadmin on Mon, 11/07/2022 - 13:46
  • Read more about Finance Committee - Agenda - 3/17/2021 - P528

Specification 02200 - Earthwork Page 2 of 3

January 2021 3066.21
B. _ Excavation shall be made to the elevations, grades, and dimensions shown on
the Drawings. Excavate sufficient material to provide suitable room for
construction providing bracing and support as required.
3.2. EXCAVATION IN WASTE

3.3

A.

CONTRACTOR shall take safety precautions during construction activities that
conform to all OSHA regulations and the safety requirements of OWNER and
the Specifications.

Finance Committee - Agenda - 3/17/2021 - P527

By dnadmin on Mon, 11/07/2022 - 13:46
  • Read more about Finance Committee - Agenda - 3/17/2021 - P527

SECTION 02200

EARTHWORK

PART 1 - GENERAL

11 SCOPE OF WORK

A.

CONTRACTOR shall provide all labor, materials, equipment, and incidentals
necessary to excavate and backfill trenches for the landfill gas collection and
control system as shown on the Drawings and specified herein, including, but
not limited to: excavation, disposal, and/or replacement of waste; placement
and compaction of earth materials; and grading.

PART 2 - PRODUCTS

2.1 GENERAL

A.

Finance Committee - Agenda - 3/17/2021 - P526

By dnadmin on Mon, 11/07/2022 - 13:46
  • Read more about Finance Committee - Agenda - 3/17/2021 - P526

CONTENTS

DIVISION 2 - SITE WORK

Section 02200 - Earthwork

Section 02275 — Nonwoven Geotextile

Section 02350 - Odor Control During Construction
Section 02550 - Gcomembrane

Section 02560 — LFG Extraction Wells

P:\3000s\3 066.2 1\Source Files\Tech Specs\ Division 2 Specifications\ 00000 Divison 2 Table of Contents.docx

SANBORN {| HEAD

Finance Committee - Agenda - 3/17/2021 - P525

By dnadmin on Mon, 11/07/2022 - 13:46
  • Read more about Finance Committee - Agenda - 3/17/2021 - P525

Section 01780 — Project Record Documents Page 2 of 2
January 2021 3066.21

PART 3 - EXECUTION

Not used.

[END OF SECTION 01780]

P:\3000s\3066.21\Source Files\Tech Specs\Division 1 Specifications\01780 Record.docx

SANBORN \ HEAD

Pagination

  • Previous page ‹‹
  • Page 138
  • Next page ››
Subscribe to Agenda

Footer menu

  • Contact