Finance Committee - Agenda - 10/2/2019 - P49

By dnadmin on Mon, 11/07/2022 - 13:03
  • Read more about Finance Committee - Agenda - 10/2/2019 - P49

Scope of Work Checklist for

The City of Nashua « NPD HVAC Repairs and System Upgrades RFP 0292-073119 - Proposal

BIDDING AND CONSTRUCTION ADMINISTRATION SERVICES

Included

Not Included

x

Attend contractor scope review interviews

x

Review of shop drawings

Review of test results

4

Periodic site visitations to observe progress of work. (MAXIMUM OF 10,
COMBINED WITH JOB MEETINGS)

Attend job meetings (COMBINED WITH ABOVE)

Review change order propasals

Finance Committee - Agenda - 10/2/2019 - P48

By dnadmin on Mon, 11/07/2022 - 13:03
  • Read more about Finance Committee - Agenda - 10/2/2019 - P48

Scope of Work Checklist for

The City of Nashua - NPD HVAC Repairs and System Upgrades RFP 0292-073119 - Proposal

Finance Committee - Agenda - 10/2/2019 - P47

By dnadmin on Mon, 11/07/2022 - 13:03
  • Read more about Finance Committee - Agenda - 10/2/2019 - P47

Scope of Work Checklist for

The City of Nashua - NPD HVAC Repairs and System Upgrades RFP 0292-073119 - Proposal

FIRE PROTECTION

Included

Not Included

x

Evaluation of existing building systems

Wet pipe sprinkler system

Standpipes

Fire pump

Storage tank

Exterior fire loop

Fire protection service to building from source, including hydrants, etc.

Hydraulic calculations

Dry pipe or chemical suppression systems (IF REQUIRED)

spot fac fo poe | oc po | x |

Fire Flow Tests

Finance Committee - Agenda - 10/2/2019 - P46

By dnadmin on Mon, 11/07/2022 - 13:03
  • Read more about Finance Committee - Agenda - 10/2/2019 - P46

Scope of Work Checklist for

The City of Nashua - NPD HVAC Repairs and System Upgrades RFP 0292-073119 - Proposai

PLUMBING

Included

Not Included

x

Evaluation of existing systems

Sanitary system to 5’ outside the building

Roof drainage system to 5’ outside the building

Cold Water service/piping system

Hot water piping system

Pipe insulation

Hot water heater/storage tanks

Plumbing fixtures

a | K] Ke] mM ER Lm | Le

Gas service from utility (EXISTING}

Finance Committee - Agenda - 10/2/2019 - P45

By dnadmin on Mon, 11/07/2022 - 13:03
  • Read more about Finance Committee - Agenda - 10/2/2019 - P45

Scope of Work Checklist for

The City of Nashua - NPD HVAC Repairs and System Upgrades RFP 0292-073119 - Proposal

Finance Committee - Agenda - 10/2/2019 - P44

By dnadmin on Mon, 11/07/2022 - 13:03
  • Read more about Finance Committee - Agenda - 10/2/2019 - P44

Scope of Work Checklist for

The City of Nashua - NPD HVAC Repairs and System Upgrades REP 0292-0173119 - Prapasal

Finance Committee - Agenda - 10/2/2019 - P43

By dnadmin on Mon, 11/07/2022 - 13:03
  • Read more about Finance Committee - Agenda - 10/2/2019 - P43

Please indicate your authorization for Yeaton Associates, Inc. to proceed with the work as described by
signing below and returning the agreement to us. If you have any questions regarding this proposal,
please call us at 603.444.6578.

On behalf of Yeaton Associates, Inc., thank you for this opportunity and we look forward to working with
you on this project.

The above proposal is offered and accepted and Yeaton Associates, Inc. is authorized to proceed,

For Yeaton Associates, Inc.

Finance Committee - Agenda - 10/2/2019 - P42

By dnadmin on Mon, 11/07/2022 - 13:03
  • Read more about Finance Committee - Agenda - 10/2/2019 - P42

Services

BASIC SERVICES
The following fee schedule is based upon the scope of services outlined in this proposal. Should the scope
of services change, Yeaton Associates is prepared to renegotiate these fees,

Hem Basis of Compensation Fee Amount
Architectural Drafting Lump Sum $3,500
Schematic Design Lump Sum $51,250
Design Development Lump Sum $51,000
Contract Documents Lump Sum $68,250
Bid Questions Lump Sum $1,006
Construction Administration Lump Sum $42,500
Total $217,506

Finance Committee - Agenda - 10/2/2019 - P41

By dnadmin on Mon, 11/07/2022 - 13:03
  • Read more about Finance Committee - Agenda - 10/2/2019 - P41

Project Understanding

GENERAL BACKGROUND

The building was constructed in 1977 with a substantial addition and renovation in 1999, In 2005 the
original 1977 heat pumps in the building were replaced with new units. All the heat pumps are R-22 and
will require replacement with a currently used refrigerant. The goal of this project is to replace the
buildings HVAC system and associated electrical systems with more efficient equipment

Finance Committee - Agenda - 10/2/2019 - P40

By dnadmin on Mon, 11/07/2022 - 13:03
  • Read more about Finance Committee - Agenda - 10/2/2019 - P40

VEATON ASSOCIATES, INC.
fuly 31, 2019

The City of Nashua
Central Purchasing
229 Main Street
Lower Level Room 11
Nashua, NH 03061

Attn: Mr. David Bailey
Services Bureau Commander

Re: Nashua Police Department HVAC Repairs and System Upgrades
RFP0292-073119
Nashua, New Hampshire
Type of Engineering Service(s) Provided

Dear David,

Yeaton Associates, Inc. is pleased to submit this proposal to provide engineering services for the above-
mentioned project.