Scope of Work Checklist for
The City of Nashua - NPD HVAC Repairs and System Upgrades REP 0292-0173119 - Prapasal
GENERAL WORK
Included Not Included
X Specifications ~ Long Form — 6 Digit Format
K Specifications — Long Form — 5 Digit Format
Specifications — Short Form on Orawings
x Revit Format
x AutoCAD Format
x Opinion of probable construction costs at 100% CD issuance for all
applicable disciplines.
x Review of construction cost data for applicable disciplines, as developed
by others.
x Life Cycle Cost Analysis
x MEP code analysis and report on existing building
x Identify and document observable MEP building systems/site services/
features relevant to this project.
x Verify/check existing conditions that may affect this project.
x Verify/decument any owner standards or preferences for materials,
systems, equipment, atc.
x Operating costs analysis and report
x Pra-purchase equipment specification and bidding
x Demolition Plans
Existing Condition Plans
x Construction Phasing Plans
x Support of LEED Certification (documentation by others} including
meetings
x laventory of Existing Equipment
Independent Technical Review {ITR)
4G So River Rd #36, Bedford, NH 03110 | 646 Union St Suite 200, Litieton, NH 03561 | 603 444 6578 | www yeatonassociates com