Finance Committee - Agenda - 8/5/2020 - P81
PCO #021
Methuen Construction Co., Inc. Project: 181012 - Nashua Energy Recovery Upgrade
144 Main Street - PO Box 980 2 Sawmill Rd.
Platstaw, New Hampshire 03865 Nashua, New Hampshire 03066
Phone: (603) 328-2222
Prime Contract Potential Change Order #021: Oil Mister Install
Finance Committee - Agenda - 8/5/2020 - P80
Mr. William Keating
COR review
6/2620
Conclusion
Waldron has reviewed all the available information, and has taken into consideration the factors
surrounding the issues in question.
Waldron recommends approving $3.936 of the claim as noted above 0 days of schedule relief,
If you have any quostions on the above, please don’t hesitate to contact me at O03-//2-7/ 155 x
105 or jsmith@waldron.com
Sincerely
Waldron Engineering & Construction, Inc.
Jeremy P. Sinith, PE.
Finance Committee - Agenda - 8/5/2020 - P79
Mr. William Keating
COR review
. 626/20
The table below summarizes the total value of the work, which will be assed value of the work
performed less the assed value of the deduct.
The claimed cast of work (take the lower of the higher estimate or the claim)
Claimed Cost | Fair Market Value | Allowable Mark-up** | Work Value Assessment
of Work of Work scope
$5,649 $3,200 (includes 15% on MC Work $4,244
materials & 10% on Subs (<$50k)
equipment)* 7-1/2% on Subs ($50-
100k)
5% on Subs (> 100k)
Finance Committee - Agenda - 8/5/2020 - P78
WALDRON ENGINEERING & CONSTRUCTION. INC,
Ta: William Keating, P.E., Project Engineer, Nashua Wastewater Treatment Facility
From: Jeremy P. Smith, P.E., Waldron Engineering & Construction, Inc.
Date: March 26, 2020
Re: Change Order Request Review 021
NWWYTE Energy Recovery Upgrade Project
Attachments: Methuen Construction PCO-021 Oi] Mister Installtion
Mr. Keating:
Finance Committee - Agenda - 8/5/2020 - P77
ra Doc #: PCO 18
poe Industral
URIS SERVICES Ref. Document:
PROJECT NAME: Date: 3-Apr-20
Nashua Energy Recovery
PROJECT NO: 181012
PHASE
COST SUMMARY SHEET
FBS RELOCATION- Extra Work
A McC Labor (Recap Sheet}: $3,476.73
B Mc Materials, & Equipment (Recap Sheet}: $2,547.44
G MC Fee (A x 15%} + {B x 15%): $903.63
BD Subtotal MC Work (A+ B+C): | $ 6,927.80
E Total Subcontractors (Below): $7,110.00
F MG Mark-up on Subcontractor Work (5%, 7.5% or 10%): | $ 688.17
Finance Committee - Agenda - 8/5/2020 - P76
Methuen PCO #018
eal CONSTRUCTION
INSTALLATI
ON
22-0150 -
PROCESS
3 | PIPING Labor aid ($5,012.32) $0.05} ($8,012.32)
INSTALLATI
ON
22-Di50 -
PROCESS
4 | PIPING Material Material $2,547.44 3 0.00 $2,547.44
(NSTALLATI
ON
Subtotal: $7,076.40 $1,045.45 $8,121.85
GC Work Total Fee - Labor: 13.00% Applies to Labor. $451.81
GC Work Total Fee - Material & Equipment: = 17.74% Applies to Other, Material, and Equipment. $454.81
Finance Committee - Agenda - 8/5/2020 - P75
PCO #018
Methuen Construction Ca., Inc. Project: 181012 - Nashua Energy Recovery Upgrade
144 Main Streat - PO Box 980 2 Sawenill Rd,
Plaistow, New Hampshire 03865 Nashua, New Hampshire 03060
Phone: (603).328-2222
Prime Contract Potential Change Order #018: Fuel Blending Skid
Finance Committee - Agenda - 8/5/2020 - P74
Mr. William Keating
COR review
6/26/20
Conclusion
Waldron has reviewed all the available information, and has taken into consideration the factors
surrounding the issues in question.
Waldron recommends approving $6,652 of the claim as noted above 0 days of schedule relief.
Ifyou have any questions on the above, please don't hesitate to contact mo at 603 772 7153 x
105 or jsmith@waldron.com
Sincerely
Waldron Engineering & Construction, Inc.
Jeremy P, Smith, PE,