PCO #021
Methuen Construction Co., Inc. Project: 181012 - Nashua Energy Recovery Upgrade
144 Main Street - PO Box 980 2 Sawmill Rd.
Platstaw, New Hampshire 03865 Nashua, New Hampshire 03066
Phone: (603) 328-2222
Prime Contract Potential Change Order #021: Oil Mister Install
FO; City of Nashua FROM: Methuen Construction Co., Inc.
229 Main Street 144 Main Street PO Box 980
Nashua New Hampshire, 03060 Plaistow New Hampshire, 03865
PCO NUMBERIREVISION: 0214/0 CONTRACT: 1F130501-090678 NASHUA PO #146861 -
Nashua Energy Recovery Upgrade
REQUEST RECEIVED FROM: Richard Czerw (Methuen Construction Co., CREATED BY: Kelly Rochford (Methuen Construstion So.,
inc.} Ine}
STATUS: ~—~—”-—SM@Pending-InReview = ~~ ~*SGREATEDDATE: 4/10/2020 2«2~°*°2~Ct*~:*:«~“CS:*W
REFERENCE: DATE SENT: 5/27/2020 a
‘FIELDCHANGE: = Yes | | PRIMEGONTRACT None
CHANGE ORDER:
OGATION: eine tee regent sebeyie netted opens nena - — esteem
SCHEDULE IMPACT: 5 days ~~ ACCOUNTING Amount Based
METHOD:
PAID IN FULL: No TOTAL AMOUNT: $5,648.38
Mathuen Construction (MC}, hereby submits this PCO jn accordance with the documentation referenced herein. It is expressly understaod and agreed
that this proposal is valid for the time as specified within this document from the date of the PCO. The Proposal is based upon current day construction
costs and does not include escalation costs for any material items that are either volatile or market sensitive. This Proposal does not include overtime
acceleration cf expediting costs. This proposal does not Include the costs associated with out of sequence construction, interference, impact related
delays and disruptions. MG reserves tts rights under the agreement to seek additional time, indirect and impact costs associated with the PCO, once the
impacts can be fully evaluated. This proposal is submitted based on the understanding that it is exempt from WBE/MBE participation requirements and
acceptance of thls proposal walves the participation requirements associated with this additonal work.
POTENTIAL CHANGE ORDER TITLE: Oil Mister Install
CHANGE REASON: Client Request
POTENTIAL CHANGE GRDER DESCRIPTION: (The Contract is Changed As Follows)
CE #045 - PCO 0214 Oit Mister Install
The 2 cil misters were requested to be added io each generator engine pear PGO-013. These were not in the original bid documents, thus requiring extra
work, The scope of work includes assembling two oil misters, installing support brackets to each WHB frame, and Installing each ail mister. As a result of
this, MC is requesiing an additional 5 days to be added to the overall schedule,
ATTACHMENTS:
PCO 21- Oil Misfer Install.pdf_
ae Burden Rate
# { Cost Code Description Type Amount (43.00% Applies to Labor) Subtotal
87-0305 -
4 | Generator Labor Labor $2,729.60 $ 4,173.73; $3,903.33
Mister instail
87-0205»
2 | Generator Equipment Equipment $ 680.00 5 0.08: $660.00
mister Inslatt
pad changes
87-0304 -
3 | Generator Material Material $232,008 § 0.06 $232.00