Finance Committee - Agenda - 8/5/2020 - P112
PCO #028
Methuen Construction Go., Inc. Project: 181012 - Nashua Energy Recovery Upgrade
144 Main Street - PO Box 980 2 Sawmill Rd.
Plaistow, New Hampshire 03865 Nashua, New Hampshire 03060
Phone: (603) 328-2222
Prime Contract Potential Change Order #028: PCO 028- Basic Electrical
Finance Committee - Agenda - 8/5/2020 - P110
Mr. William Keating
COR review
6/26/28
Conclusion
Waldron has reviewed all the available information, and has taken into consideration the factors
surrounding the issues in question.
Waldron reconamends approving $736 of the claim as noted above. {} days of schedule relief
If you have any questions on the above, please don’t hesitate to contact me at 603-772-7153 x
105 or jsmith@waldron.com
Sincerely
Waldron Engineering & Constmiction, Inc.
goremy P. Sith, PE.
Finance Committee - Agenda - 8/5/2020 - P109
Mr. William Keating
COR review
6126/20
1-Oas Deleclor
Datnaged by coring | Nu (Foreseeable/Trade cour.) | $5,191
Wiring worl
2-Plant Phone Wiring | Damaged by sawing | No (Foresceable/Trade coor.) | $2,911
work
3-New Boiler Room | Added work Yes (Legitimate Add) $736
Cir. Pumps
4-Thermostat Wiring | Damaged by sawing No (Foreseeable/Trade coor.) | $1,038
work
5-Receptacle Wiring | Damaged by sawing | No (Foreseeable/Txade coor.) | $2,696
work
Finance Committee - Agenda - 8/5/2020 - P108
WALDRON ENGINEERING & CONSTRUCTION. INC.
To: William Keating, P.E., Project Engineer, Nashua Wastewater Treatment Facility
Piom: Jeremy P. Sinith, FE., Waldron Engineering & Construction, inc.
Date: March 28, 2020
Re: Change Order Request Review 028
NWWTE Energy Recovery Upgrade Project
Attachments: Methuen Construction PCO-028 Electrical items (list of six)
Mr. Keating:
Finance Committee - Agenda - 8/5/2020 - P107
Recoring Chimney Stack #2
Scope: There were issues aunning generalor #2 exhaust slack through the ceiling. The existing core holes through ihe reof were not plumb making il impossible lo run the
aiack thraugh. MC had to recore the holes sa that the stack could properly be erected. The below is a breakdown of the work performed including, renting core drill, cering
through roof, cleanup, atc, As a result MC Js requesting 4 day fo be added Io the overall construction schedule,
Finance Committee - Agenda - 8/5/2020 - P106
ar industrial Doc #: PCO 27
II sens nruenetn Ref. Document:
PROJECT NAME; Date: a-Jun-20
Finance Committee - Agenda - 8/5/2020 - P105
PCO #027
Subtetal: S697.36 $248.26 $945.62
GC Wark Total Foe» Labor: 15.00% Applies to Labor 5 123.84
GG Wark Total Fee - Material & Equipment: 15.00% Applies to Otter, Matorial, and Equipment. 518.00
G¢ Subcontractors Work Fee: 10,00% Applies to Subcontractor, $0.06
Bond & Ganoral Liability: 2.00% Apalices to Other, Material, Committed Costs, Labor, Rental Equipmont Refef, Equipment, Subcontractor, and Burder. $21.76
Grund Talal: $1,100.22
Jeremy Smith, P.E. (Waldron Engineering
& Construction, Inc.)
Finance Committee - Agenda - 8/5/2020 - P104
Methuen Construction Co., Inc.
144 Main Street - PO Box 980
Plaistow, New Hampshire 03865
PCO #027
Project; 181012 - Nashua Energy Recovery Upgrade
2 Sawenill Re.
Nashua, New Hampshire 03060
Phone: (603) 328-2222
Prime Contract Potential Change Order #027: Recoring for Chimney Stack
#2
City of Nashua
TO: FROM: Methuen Construction Co., Inc.
229 Main Street 144 Main Sireet PO Box 980
Nashua New Hampshire, 03060 Plaistow New Hampshire, 03865