Recoring Chimney Stack #2
Scope: There were issues aunning generalor #2 exhaust slack through the ceiling. The existing core holes through ihe reof were not plumb making il impossible lo run the
aiack thraugh. MC had to recore the holes sa that the stack could properly be erected. The below is a breakdown of the work performed including, renting core drill, cering
through roof, cleanup, atc, As a result MC Js requesting 4 day fo be added Io the overall construction schedule,
1-LABOR
CATEGORY HRS RATEHHR PREMIUM SUBTOTAL = LINE TOTAL TOTAL
DRIVER
AL $577.35
2-MATERIALS
DESCRIPTION ary UNIT UNITCOST SUBTOTAL
SUBTOTAL 5 -
3-EQUIPMENT Eo
CATEGORY QTY RATE UNIT SUBTOTAL
VATOR PC300 5190
FRONT END LOADER
SUBTOTAL $120.00
Page 2015 6/10/2020 - 2:33 PM