Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee

Finance Committee

Finance Committee - Agenda - 4/6/2022 - P259

By dnadmin on Sun, 11/06/2022 - 21:44
  • Read more about Finance Committee - Agenda - 4/6/2022 - P259

B. All existing drainage facilities including, but not limited to: brooks, streams, canals,
channels, ditches, culverts, catch basins and drainage piping shall be adequately
safeguarded so as not to impede drainage or to cause siltation of downstream areas in
any manner whatsoever. If the Contractor damages or impairs any of the aforesaid
drainage facilities, he shall repair the same within the same day.

C. At the conclusion of the work, the Contractor shall remove all silt in drainage
structures caused by his operations.

Finance Committee - Agenda - 4/6/2022 - P258

By dnadmin on Sun, 11/06/2022 - 21:44
  • Read more about Finance Committee - Agenda - 4/6/2022 - P258

F. Nothing contained herein shall be construed as relieving the Contractor of any of his
responsibilities for protection of persons and property under the terms of the Contract.

G. Should it be determined by the Engineer that uniformed officers are not required;
flaggers will be provided to maintain traffic flow.

5. Care and Protection of Property

Finance Committee - Agenda - 4/6/2022 - P257

By dnadmin on Sun, 11/06/2022 - 21:44
  • Read more about Finance Committee - Agenda - 4/6/2022 - P257

expense, provide suitable and safe means for completely covering all open
excavations and for accommodating travel when work is not in progress.

B. Bridges provided for access to private property during construction shall be removed
when no longer required.

C. If/where applicable, the length of open trench will be controlled by the particular
surrounding conditions but shall always be confined to the limits prescribed by the
Engineer.

Finance Committee - Agenda - 4/6/2022 - P256

By dnadmin on Sun, 11/06/2022 - 21:44
  • Read more about Finance Committee - Agenda - 4/6/2022 - P256

AAIDAMWBRWNH

Ce)
Nr oO°

SECTION 01110

CONTROL OF WORK AND MATERIALS

General

Hauling, Handling and Storage of Materials

Open Excavations

Maintenance of Traffic

Care and Protection of Property

Protection and Relocation of Existing Structures and Utilities
Maintenance of Flow

Rejected Materials and Defective Work

Sanitary Regulations

Site Investigation

Existing Utility Locations — Contractor’s Responsibility
Cutting, Fitting and Patching

1. General

Finance Committee - Agenda - 4/6/2022 - P255

By dnadmin on Sun, 11/06/2022 - 21:44
  • Read more about Finance Committee - Agenda - 4/6/2022 - P255

Section Number

TABLE OF CONTENTS

Description

01

02

01110
01150
01330
01331
01735

02085
02252
02300
02324
02370
02451

02518
02530
02533

02534
02631
02745
02920

GENERAL REQUIREMENTS

Control of Work and Materials
Measurement and Payment
Submittals

Documentation

Cutting, Coring and Patching

SITE WORK

Polyvinyl Chloride Gravity Pipe and Fittings
Support of Excavation

Earthwork

Finance Committee - Agenda - 4/6/2022 - P254

By dnadmin on Sun, 11/06/2022 - 21:44
  • Read more about Finance Committee - Agenda - 4/6/2022 - P254

DIVISION 7

0779-021022
2022 SEWER REPLACEMENT PROJECT

> TECHNICAL SPECIFICATIONS

Finance Committee - Agenda - 4/6/2022 - P253

By dnadmin on Sun, 11/06/2022 - 21:44
  • Read more about Finance Committee - Agenda - 4/6/2022 - P253

CONTRACTOR'S FINAL RELEASE AND WAIVER OF LIEN

Project:

Owner: Contractor:
Owner: City of Nashua, New Hampshire Name:
Address: 229 Main Street Address:

Nashua, New Hampshire 03060
City State Zip City State Zip

Contract Date:

TO ALL WHOM IT MAY CONCERN:

Finance Committee - Agenda - 4/6/2022 - P252

By dnadmin on Sun, 11/06/2022 - 21:44
  • Read more about Finance Committee - Agenda - 4/6/2022 - P252

CERTIFICATE OF FINAL COMPLETION

PROJECT:

DATE OF ISSUANCE:

OWNER: City of Nashua, NH

OWNER’s Purchase Order NO::

CONTRACTOR:

ENGINEER: DPW Engineering

The Work to which this Certificate applies has been inspected by authorized representative of OWNER,
CONTRACTOR, and ENGINEER, and that Work is hereby declared to be finally complete in accordance
with the Contract Documents on

(DATE OF FINAL COMPLETION)

Finance Committee - Agenda - 4/6/2022 - P251

By dnadmin on Sun, 11/06/2022 - 21:44
  • Read more about Finance Committee - Agenda - 4/6/2022 - P251

CERTIFICATE OF SUBSTANTIAL COMPLETION

PROJECT:

DATE OF ISSUANCE:

OWNER: City of Nashua, NH

OWNER’s Purchase Order NO::

CONTRACTOR:

ENGINEER: DPW Engineering

The Work to which this Certificate applies has been inspected by authorized representative of OWNER,
CONTRACTOR, and ENGINEER, and that Work is hereby declared to be substantially complete in
accordance with the Contract Documents on

(DATE OF SUBSTANTIAL COMPLETION)

Finance Committee - Agenda - 4/6/2022 - P250

By dnadmin on Sun, 11/06/2022 - 21:44
  • Read more about Finance Committee - Agenda - 4/6/2022 - P250

CHANGE ORDER
SUMMARY

CHANGE IN CONTRACT PRICE

Original Contract Price:

CHANGE IN CONTRACT TIMES

Original Contract Times:

Substantial Completion:

Ready for Final Payment:

Net Changes from previously approved Change Orders

Net Changes from previously approved Change Orders

Substantial Completion:

Ready for Final Payment:

Contract Price prior to this Change Order:

Contract Times prior to this Change Order:

Substantial Completion:

Ready for Final Payment:

Pagination

  • Previous page ‹‹
  • Page 1991
  • Next page ››
Subscribe to Finance Committee

Footer menu

  • Contact