Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee

Finance Committee

Finance Committee - Agenda - 4/6/2022 - P269

By dnadmin on Sun, 11/06/2022 - 21:44
  • Read more about Finance Committee - Agenda - 4/6/2022 - P269

The accepted quantity of leaching catch basins constructed shall be paid for
at the contract unit price under ITEM 7C, and shall constitute full
compensation for constructing new leaching catch basin, furnishing and
installing specified frame and grate, complete in place as indicated on the
drawings and/or as specified, including furnishing all materials, labor, tools,
and equipment necessary to complete the work, including but not limited to
excavation, dewatering, backfill, removal of unsuitable materials at the City

Finance Committee - Agenda - 4/6/2022 - P268

By dnadmin on Sun, 11/06/2022 - 21:44
  • Read more about Finance Committee - Agenda - 4/6/2022 - P268

Payment:
The accepted quantity of existing sewer line or drain lateral connections to new

Finance Committee - Agenda - 4/6/2022 - P267

By dnadmin on Sun, 11/06/2022 - 21:44
  • Read more about Finance Committee - Agenda - 4/6/2022 - P267

labor, tools and equipment necessary to complete the work as specified in these
Specifications and as directed by the Engineer.

NOTE:

1. The restoration of the pavement and base course gravels around the frame
and cover shall be paid for separately under the appropriate ROADWAY
RESTORATION contract items.

Finance Committee - Agenda - 4/6/2022 - P266

By dnadmin on Sun, 11/06/2022 - 21:44
  • Read more about Finance Committee - Agenda - 4/6/2022 - P266

NOTE: Connecting existing sewer line or drain lateral to new sewer
manhole or catch basin will be paid separately under Items 6I.

H. SEWER MANHOLE INTERNAL DROP ASSEMBLY
Measurement:
The quantity to be measured under ITEM 6D will be the actual number of PVC
internal drop assemblies constructed by the VERTICAL FOOT, complete-in-
place, as specified in these Specifications and as directed by the Engineer.

Payment:
The accepted quantity of internal drop assemblies constructed shall be paid for

Finance Committee - Agenda - 4/6/2022 - P265

By dnadmin on Sun, 11/06/2022 - 21:44
  • Read more about Finance Committee - Agenda - 4/6/2022 - P265

F. REPLACE OR CONSTRUCT SEWER MANHOLE (4-FOOT & 5-FOOT DIA.)
Measurement:
The quantity to be measured under the various subdivisions of ITEM 6 (A and
B) for replacing or constructing new sewer manholes will be measured by the
VERTICAL FOOT as measured from the lowest invert to the top of the
manhole casting, complete-in-place, as specified in these Specifications and as
directed by the Engineer.

Payment:
The accepted quantity of sewer manholes new or replaced shall be paid for

Finance Committee - Agenda - 4/6/2022 - P264

By dnadmin on Sun, 11/06/2022 - 21:44
  • Read more about Finance Committee - Agenda - 4/6/2022 - P264

Payment:
The accepted quantity of asbestos sewer, asbestos drain or asbestos sewer

Finance Committee - Agenda - 4/6/2022 - P263

By dnadmin on Sun, 11/06/2022 - 21:44
  • Read more about Finance Committee - Agenda - 4/6/2022 - P263

B.

C.

POINT REPAIR OF EXISTING SEWER AND DRAINS

Measurement:

The quantity to be measured under the various subdivisions of ITEM 2 (A thru
D) will be the actual number of point repairs measured by the EACH,
complete-in-place, as specified in these Specifications and as directed by the
Engineer. The depth for pay items shall be measured from the existing grade to
the sewer pipe invert.

Payment:
The accepted quantity of point repair items shall be paid for at the contract unit

Finance Committee - Agenda - 4/6/2022 - P262

By dnadmin on Sun, 11/06/2022 - 21:44
  • Read more about Finance Committee - Agenda - 4/6/2022 - P262

J. Unit prices listed shall be the basis of cost adjustment for additional items of work
required by a change order.

All prices shall include transportation and disposal of excess materials at the City

landfill as applicable.

L. Unit and lump sum prices shall reflect salvage value of all pipe materials and
appurtenances removed as part of the work.

M. All prices shall include costs related to filing and obtaining applicable licenses and
permits from local and state agencies.

PART 2 - DESCRIPTION OF PAY ITEMS

2.01

A.

Finance Committee - Agenda - 4/6/2022 - P261

By dnadmin on Sun, 11/06/2022 - 21:44
  • Read more about Finance Committee - Agenda - 4/6/2022 - P261

SECTION 01150

MEASUREMENT AND PAYMENT

PART 1— GENERAL

1.1

A.

SUMMARY

Under the price specified to be paid for each item, the Contractor shall furnish all
labor, materials, equipment, plant, and perform all operations to complete all work as
indicated and specified. All supervision, overhead items, bond and permit costs,
protection and precautions and all other costs, incidental to the construction work,
complete, and as specified, are also included.

Finance Committee - Agenda - 4/6/2022 - P260

By dnadmin on Sun, 11/06/2022 - 21:44
  • Read more about Finance Committee - Agenda - 4/6/2022 - P260

11. Existing Utility Locations - Contractor's Responsibility

A. The location of existing underground services and utilities shown on the drawings is based
on available records. It is not warranted that all existing utilities and services are shown,
nor that shown locations are correct. The Contractor shall be responsible for having the
utility companies locate their respective utilities on the ground prior to excavating.

Pagination

  • Previous page ‹‹
  • Page 1990
  • Next page ››
Subscribe to Finance Committee

Footer menu

  • Contact