Finance Committee - Agenda - 3/17/2021 - P507

By dnadmin on Mon, 11/07/2022 - 13:46
  • Read more about Finance Committee - Agenda - 3/17/2021 - P507

Section 01110 - Summary of Work Page 2 of 2
January 2021 3066.21

features shall be repaired or replaced to the satisfaction of ENGINEER and
OWNER at CONTRACTOR’s expense.

C. Construction activities at the site must be performed during daylight hours
between 7:00 am and 4:00 pm Monday through Friday.

1.4 © WORK PERFORMED UNDER SEPARATE CONTRACTS
A. This work will be performed independently of other contracts.
PART 2 - PRODUCTS
Not used.
PART 3 - EXECUTION

Not used.
[END OF SECTION 01110]

Finance Committee - Agenda - 3/17/2021 - P506

By dnadmin on Mon, 11/07/2022 - 13:46
  • Read more about Finance Committee - Agenda - 3/17/2021 - P506

SECTION 01110

SUMMARY OF WORK

PART 1 - GENERAL

11 ITEMS OF WORK

A.

The major items of Work associated with the construction of the landfill gas

collection and control system (GCCS) expansion include, but are not limited to

the following:

1. Providing construction layout and documentation survey.

2. Excavating and backfilling trenches and relocating waste associated with

excavations to the active landfill as directed by OWNER.

Furnishing materials for and constructing gas collection trenches.

Finance Committee - Agenda - 3/17/2021 - P505

By dnadmin on Mon, 11/07/2022 - 13:46
  • Read more about Finance Committee - Agenda - 3/17/2021 - P505

CONTENTS

DIVISION 1 - GENERAL REQUIREMENTS

Section 01110 - Summary of Work

Section 01290 - Measurement and Payment

Section 01310 - Project Coordination and Meetings

Section 01320 - Survey Control

Section 01330 - Submittals

Section 01450 - Quality Control

Section 01520 - Construction Facilities and Temporary Controls
Section 01780 - Project Record Documents

P:\3000s\3066.21\Source Files\Tech Specs\ Division 1 Specifications\00000 Divison 1 Table of Contents.docx

SANBORN HEAD

Finance Committee - Agenda - 3/17/2021 - P504

By dnadmin on Mon, 11/07/2022 - 13:46
  • Read more about Finance Committee - Agenda - 3/17/2021 - P504

| HEAD

Building Trust. Engineering Success.

SANBORN |

EXHIBIT B

TECHNICAL SPECIFICATIONS

2021 FOUR HILLS LANDFILL GAS EXPANSION DESIGN
Four Hills Landfill
Nashua, New Hampshire

File No. 3066.21
January 2021

SANBORN, HEAD & ASSOCIATES, INC. www.sanbornhead.com

Finance Committee - Agenda - 3/17/2021 - P503

By dnadmin on Mon, 11/07/2022 - 13:46
  • Read more about Finance Committee - Agenda - 3/17/2021 - P503

Bid Item No. 10 Survey

Finance Committee - Agenda - 3/17/2021 - P502

By dnadmin on Mon, 11/07/2022 - 13:46
  • Read more about Finance Committee - Agenda - 3/17/2021 - P502

end of the collector, and hauling and placing a 1-foot thick layer of Intermediate Cover over
the Draintube™ following installation. Materials shall include the Draintube™ models
indicated on the Drawings, and associated fittings and couplers. Intermediate Cover is
available on site for use by CONTRACTOR. This item will be paid on a unit basis per linear
foot of Draintube™ installed.

Bid Item No. 6 40-mil thick HDPE Geomembrane

Finance Committee - Agenda - 3/17/2021 - P501

By dnadmin on Mon, 11/07/2022 - 13:46
  • Read more about Finance Committee - Agenda - 3/17/2021 - P501

constructed as part of Bid Item No. 2. Labor shall include the installation of nine (9) new
pumps and appurtenances, and connections to the compressed air line and dewatering
condensate main. Materials shall include well caps, pumps, fittings, and appurtenances as
indicated on the Drawings. Not all necessary fittings are shown on the Drawings.
CONTRACTOR is responsible for providing any and all materials needed for a complete
installation of the pump assembly and must ensure that the pump is operational. This item

Finance Committee - Agenda - 3/17/2021 - P500

By dnadmin on Mon, 11/07/2022 - 13:46
  • Read more about Finance Committee - Agenda - 3/17/2021 - P500

BID ITEM DEFINITIONS EXHIBIT A

2021 Four Hills Landfill Gas Expansion
Nashua, New Hampshire
Prepared January 22, 2021

The following describes the Bid Items and the mechanism for payment to CONTRACTOR for
each Bid Item. All incidental costs such as overhead, profit, and insurance shall be factored
into the Bid Item unit prices. All measurements are based on plan view areas and lengths
without consideration of slope. Bidders should factor slope adjustments into their Bid Item
unit prices.

Bid Item No. 1 Mobilization/Demobilization

Finance Committee - Agenda - 3/17/2021 - P499

By dnadmin on Mon, 11/07/2022 - 13:46
  • Read more about Finance Committee - Agenda - 3/17/2021 - P499

IN WITNESS WHEREOF, the parties hereto have caused this contract to be signed and intend to be
legally bound thereby.

City of Nashua, NH (signature) Stearns, Conrad, and Schmidt
Engineers, Inc. dba SCS Field

Service (signature)

James W. Donchess, Mayor
(Printed Name and Title) (Printed Name and Title)

Date Date

Page 13 of 13

Finance Committee - Agenda - 3/17/2021 - P498

By dnadmin on Mon, 11/07/2022 - 13:46
  • Read more about Finance Committee - Agenda - 3/17/2021 - P498

performance of the contract. Neither party shall be considered in default of the performance of such
obligations is prevented or delayed by any cause, existing or future, which is beyond the reasonable
control of such party. Delays arising from the actions or inactions of one or more of
CONTRACTOR 's principals, officers, employees, agents, subcontractors, sub consultants,
vendors, or suppliers are expressly recognized to be within CONTRACTOR's control.

ARTICLE 17 — DISPUTE RESOLUTION