Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 3/17/2021 - P503

Finance Committee - Agenda - 3/17/2021 - P503

By dnadmin on Mon, 11/07/2022 - 13:46
Document Date
Fri, 03/12/2021 - 12:03
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/17/2021 - 00:00
Page Number
503
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__031720…

Bid Item No. 10 Survey

This item requires that CONTRACTOR provide all labor and equipment required to perform
construction layout and as-built documentation as required by Specifications. Construction
layout shall include vertical wells, gas collection trenches, connections to the existing LFG
conveyance pipe, and all other work items as defined in the Drawings and Specifications.
CONTRACTOR shall stake out alignments of the proposed pipe and locate and mark existing
LFG system features that may be encountered during construction, prior to the start of
excavation. As-built survey locations shall be performed as features are constructed for
payment and record information and shall include all completed items as defined in the
Drawings and Specifications. Payment for this item will be lump sum prorated over the
scheduled duration of the Work.

P:\3000s\ 3066.2 1\Source Files\ Bid Item Defs\20210122 Bid Item Defs.docx

File No. 3066.21 4 of 4 January 2021

Page Image
Finance Committee - Agenda - 3/17/2021 - P503

Footer menu

  • Contact