Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee

Finance Committee

Finance Committee - Agenda - 11/15/2017 - P374

By dnadmin on Mon, 11/07/2022 - 10:19
  • Read more about Finance Committee - Agenda - 11/15/2017 - P374

Project Number: 228730 WWTE SCADA Upgrades
Issue Date: August 2017 Nashua, NH

1.07. SITE CONDITIONS

A.

Existing Conditions: per Division 01 General Requirements.

1.08 MAINTENANCE

A.

Extra Materials: Furnish as specified below. Make interchangeable with and same
material and workmanship as corresponding original parts.

1. Provide specific operations and maintenance data in accordance with
Section 40 61 01.

Finance Committee - Agenda - 11/15/2017 - P373

By dnadmin on Mon, 11/07/2022 - 10:19
  • Read more about Finance Committee - Agenda - 11/15/2017 - P373

Project Number: 228730 WWTE SCADA Upgrades
Issue Date: August 2017 Nashua, NH

1.05 QUALITY ASSURANCE
A. Provide in accordance with Division 01 General Requirements.

B. PLCs and OITs provided under this Contract shall comply with the Specifications,
shall be supplied from manufacturers regularly engaged in the production of such
products, shall be standard products wherever possible, and shall be of the
manufacturer’s latest design.

Finance Committee - Agenda - 11/15/2017 - P372

By dnadmin on Mon, 11/07/2022 - 10:19
  • Read more about Finance Committee - Agenda - 11/15/2017 - P372

Project Number: 228730 WWTE SCADA Upgrades
Issue Date: August 2017 Nashua, NH

SECTION 40 63 43
PROGRAMMABLE LOGIC CONTROLLERS
PART 1 —- GENERAL
1.01 SUMMARY
A. Section Includes
1. Provide labor, materials, equipment, and appurtenances to furnish and

install the programmable logic controllers and operator interface terminals
as specified and on the Drawings in accordance with this Section.

2. Definitions
a. PLC: Programmable Logic Controller
b. RIO: Remote Input/Output Rack

Finance Committee - Agenda - 11/15/2017 - P371

By dnadmin on Mon, 11/07/2022 - 10:19
  • Read more about Finance Committee - Agenda - 11/15/2017 - P371

This page intentionally left blank

Finance Committee - Agenda - 11/15/2017 - P370

By dnadmin on Mon, 11/07/2022 - 10:19
  • Read more about Finance Committee - Agenda - 11/15/2017 - P370

SUIYIe|| JBAIAS - TVAVOS 39 UOHRIPA PABPURIS OOOS OIPNIS | T WINAOOECTY-7CE6 ff PESeyrind II4
dojde] Apuey qual|D UOHRIPA PABPURIS OOOS OIPNIS | T WNAO0ECTH-7ZE6| dojdeq Apuey
aulyse|| JOAIaS -TVGVIS) |PWON| = Mys 917 Aeldsiq JUN 4S JaAsas MalA 14 /T ANAVOOOSSMA-TOZ6| VOGOTO9SSZ
SUIYDe|| JBAIBS - TVGVOS| = =JEWJON asldsajuq MalA 14 404 OIPNIS 14 /T ANALSMA-TOZ6| 6V8TO006CSZ
GALINIINA OLNIAGVYL- cvdvos) = JEWJON Ae|dsiq OOT JaAsas 4S MAIA 14|T ANAVOOTSSMA-TOZ6| 99TTOOLCSZ

Finance Committee - Agenda - 11/15/2017 - P369

By dnadmin on Mon, 11/07/2022 - 10:19
  • Read more about Finance Committee - Agenda - 11/15/2017 - P369

Project Number: 228730 WWTE SCADA Upgrades
Issue Date: August 2017 Nashua, NH

This page intentionally left blank

SCADA COMPUTERS AND SOFTWARE
WOODARD & CURRAN 40 62 70-6

Finance Committee - Agenda - 11/15/2017 - P368

By dnadmin on Mon, 11/07/2022 - 10:19
  • Read more about Finance Committee - Agenda - 11/15/2017 - P368

Project Number: 228730 WWTE SCADA Upgrades
Issue Date: August 2017 Nashua, NH

H. Locations for the five desktop computers shall be in two new panels (Gallery
Computer panel, Pump Building panel), two existing panels (Wet Weather CP-21,
Sedimentation CP-31) and on desk in main office. For panels, install computers and

industrial monitors similar to detail as shown on Gallery Computer Panel drawing
(1-2800).

2.03 SOFTWARE UPGRADES AND REGISTRATION

Finance Committee - Agenda - 11/15/2017 - P367

By dnadmin on Mon, 11/07/2022 - 10:19
  • Read more about Finance Committee - Agenda - 11/15/2017 - P367

Project Number: 228730 WWTE SCADA Upgrades
Issue Date: August 2017 Nashua, NH

2.02 DESKTOP COMPUTERS AND ACCESSORIES

A. Furnish (5) Dell® Optiplex 7050 Desktop computers as indicated on drawings with
features as follows.

1. Processor: Intel® Core 13-7100 Processor 3.9 GHz, 4M, L2
2. Chassis configuration: Micro Form Factor

3. Memory: 32GB DDR4 Non-ECC SDRAM, 2400 MHz.

4. Keyboard: USB keyboard, no hotkeys.

5. Monitor: 24 inch widescreen flat panel LCD.

6. Mouse: USB optical mouse with scroll.

Finance Committee - Agenda - 11/15/2017 - P366

By dnadmin on Mon, 11/07/2022 - 10:19
  • Read more about Finance Committee - Agenda - 11/15/2017 - P366

Project Number: 228730 WWTE SCADA Upgrades
Issue Date: August 2017 Nashua, NH

8. R730/xd PCle Riser 1, Right (330-BBCR)

9. Intel Ethernet X540 DP 10Gb BT + I350 1Gb BT DP Network Daughter
Card (540-BBCC) Intel Ethernet I350 QP 1Gb Network Interface Card (xx)
VFlash, 8GB SD Card for iDRAC Enterprise (385-BBCB)

Finance Committee - Agenda - 11/15/2017 - P365

By dnadmin on Mon, 11/07/2022 - 10:19
  • Read more about Finance Committee - Agenda - 11/15/2017 - P365

Project Number: 228730 WWTE SCADA Upgrades
Issue Date: August 2017 Nashua, NH

1.06 DELIVERY, STORAGE, AND HANDLING

A.

B.

C.

D.

Provide in accordance with Division 01 General Requirements.
Deliver equipment as directed to ensure uninterrupted progress of the Work.

Handle computer equipment very carefully. Damaged computer equipment will be
rejected.

Store equipment to permit easy access for inspection and identification.

1.07. SITE CONDITIONS

A.

Pagination

  • Previous page ‹‹
  • Page 1537
  • Next page ››
Subscribe to Finance Committee

Footer menu

  • Contact